return_forms_sol_nf_grouse_ck.doc

DOC document 274 KB Posted

Attached to
Idaho Panhandle NF, Sandpoint RD - NF Grouse Creek Bridge Replacment
Solicitation number
AG-02RC-S-10-0027
Issued by

About this file

Return Forms

View the file

Other files

File Type Posted
amendment_2_schedule_corrections.doc DOC document
amendment_1_nf.grouse.ck_extension.doc DOC document
attachment_2_nf_grouse_ck_plans_sheets.pdf PDF
Attachment_3_nf_grouse_special_project_specifications.doc DOC document
attachment_4_Idaho_wrk_comp_cert_.doc DOC document
Attachment_1_wage_rate.docx DOCX document
complete_sol_nf_grouse_ck.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

Hungry Deer Project

AG-0281-S-09-0045

PAGE

AG-02RC-S-10-0027

NF Grouse Ck Culvert Replacement

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-02RC-S-10-0027

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

07-27-2010

PAGE OF PAGES

1-51

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

436711

6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

USDA – Forest Service

Idaho Montana Acquisition Team (IMAT)

3815 Schreiber Way

Coeur d’Alene, ID 83815 Same as Block 7

Be sure to Identify the envelope/package with your offer as RFP-AG-02RC-S-10-0027

9. FOR INFORMATION

CALL:

A. NAME

William Standley B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(208) 765-7433

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Request for Proposals (RFP) North Fork Grouse Ck. Culvert Replacement Idaho Panhandle NF, Sandpoint RD, Bonner Co, ID

· The Government's estimate including option is between $250,000 - $500,000

· This is a Competitive Total Hub-Zone Set-Aside procurement. All eligible and responsible Hub-Zone sources may submit a proposal. Any questions about Hub-Zone eligibility should be directed to the Offeror’s cognizant Small Business Administration Office.

Facsimile Offers Will Not Be Accepted

11. The Contractor shall begin performance within 10 calendar days and complete it within (see Section F) after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Section F.2)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

if total offer is at or over $100,000

FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 3:00pm (hour) local time August 30, 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

FORMCHECKBOX

is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

Duns No. ______________________________________

TIN: ___________________________________________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

Base-01a-$_________________Base-01b-$_________________ Option-02a-$_______________ Only one base item will be awarded

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

SEE IAS SF 1442

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

7- c/o COR

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

Block 7

Block 7 thence - USDA, OCFO, COD, APB

PO Box 60075

New Orleans, LA 70160

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print) William Standley

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

PART I – THE SCHEDULE

SECTION B – SERVICES AND PRICES

OUTLET BAY CAMPGROUND WATER, SEWER, ROAD & DRAINAGE IMPROVEMENTS

Sandpoint Ranger District

Idaho Panhandle National Forests

Bonner County, Idaho

Base Bid Item – 01a (Detour Road & Detour Bridge Alternative Schedule A)

ITEM NO. 01a – sub-items
ITEM DESCRIPTION
METH. OF MEAS.
EST. QTY
UNITS
UNIT PRICE
TOTAL PRICE
104(01)
Temporary Traffic Control
LSQ
LS
1
$
$
170(07)
Construction Staking; Bridge Structure Precision A, Centerline Precision A, Slope Staking Precision B
LSQ
LS
1
$
$
202(02)
Removal of Existing 10’ Diameter CSP Culvert
AQ
EA
1
$
$
202(05)
Removal of Existing Concrete Fish Ladder & Culvert
LSQ
LS
1
$
$
204(09)
Sediment Basin
AQ
EA
1
$
$
204(19)
Soil Erosion and Pollution Control
LSQ
LS
1
$
$

206(07)

Structural Excavation
LSQ
LS
1
$
$

*215(01)

Load & Haul Government Furnished Logs with Root Wads
AQ
EA
30
$
$
251(01)
Placed Riprap, Class 5, Method A, Machine Placed (Commercial Source)
DQ
CY
220
$
$
*251(14)
Furnish Individual Boulders (24” to 36”) (Commercial Source)
AQ
EA
400
$
$

260(01)

Geocell Abutment Stabilization, 6” Depth
DQ
SY
43.33
$
$
304(11)A
Crushed Aggregate, Type Surfacing, Grading G, Compaction B (Commercial Source)
AQ
TON
675
$
$
-
-
-
-
This page sub-total→
$

Item 01a Continued next page -

Base Bid Item– 01a (continued) (Detour Road & Detour Bridge Alternative Schedule A)

ITEM NO. 01a – sub-items
ITEM DESCRIPTION
METH. OF MEAS.
EST. QTY
UNITS
UNIT PRICE
TOTAL PRICE
* 304(23)
Furnish Stream Simulation Material, Bed Class 4 (Commercial Source)
AQ
CY
140
$
$
553(01)
Precast, Prestressed Concrete Structural Member, Bulb-Tee Beam
AQ
EA
4
$
$
553A(01)A
Precast Concrete Member, Grade Beam
AQ
EA
2
$
$
553A(01)B
Precast Concrete Member, Wingwall
AQ
EA
4
$
$
558(03)
Portable Prefabricated Detour Bridge – Furnish, Install, Maintain, and Remove
LSQ
LS
1
$
$

601(01)A

Mobilization
LSQ
LS
1
$
$
625(08)
Seeding, Dry Method (with

mulch)

LSQ
LS
1
$
$

633(01)

Wood Posts
AQ
LF
36
$
$

633(17)

Object Markers
AQ
EA
4
$
$

637(01)

Large Dump Truck
AQ
HR
24
$
$
637(02)
Hydraulic Excavator with Thumb
AQ
HR
64
$
$
680(01)
Detour Road, Construct, Maintain, and Remove
LSQ
LS
1
$
$
-
-
-
Item 01a Grand Total→
$

* Pay Items with asterisk will be incorporated into the project work under Section 637 – Equipment Rental under the direction of the Contracting Officer.

Do not import material to the project site under Item 304(23) – Furnish Stream Simulation Material, Bed

Class 4 until directed to do so by the Contracting Officer.

Designated Method of Measurement: DQ – Designed Quantities; AQ – Actual Quantities;

LSQ – Lump Sum Quantities; SQ – Staked Quantities

Base Bid Item – 01b (Pedestrian By-Pass & Footbridge Alternative Schedule B)

ITEM NO. 01b – sub-items
ITEM DESCRIPTION
METH. OF MEAS.
EST. QTY
UNITS
UNIT PRICE
TOTAL PRICE
170(07)
Construction Staking; Bridge Structure Precision A, Centerline Precision A, Slope Staking Precision B
LSQ
LS
1
$
$
202(02)
Removal of Existing 10’ Diameter CSP Culvert
AQ
EA
1
$
$
202(05)
Removal of Existing Concrete Fish Ladder & Culvert
LSQ
LS
1
$
$
204(09)
Sediment Basin
AQ
EA
1
$
$
204(19)
Soil Erosion and Pollution Control
LSQ
LS
1
$
$

206(07)

Structural Excavation
LSQ
LS
1
$
$

*215(01)

Load & Haul Government Furnished Logs with Root Wads
AQ
EA
30
$
$
251(01)
Placed Riprap, Class 5, Method A, Machine Placed (Commercial Source)
DQ
CY
220
$
$
*251(14)
Furnish Individual Boulders (24” to 36”) (Commercial Source)
AQ
EA
400
$
$

260(01)

Geocell Abutment Stabilization, 6” Depth
DQ
SY
43.33
$
$
304(11)A
Crushed Aggregate, Type Surfacing, Grading G, Compaction B (Commercial Source)
AQ
TON
675
$
$
*304(23)
Furnish Stream Simulation Material, Bed Class 4 (Commercial Source)
AQ
CY
140
$
$
-
-
This page sub-total→
$

Item 01b Continued next page Base Bid Item 01b – (continued) (Pedestrian By-Pass & Footbridge Alternative Schedule B)

ITEM NO. 01b – sub-items
ITEM DESCRIPTION
METH. OF MEAS.
EST. QTY
UNITS
UNIT PRICE
TOTAL PRICE
553(01)
Precast, Prestressed Concrete Structural Member, Bulb-Tee Beam
AQ
EA
4
$
$
553A(01)A
Precast Concrete Member, Grade Beam
AQ
EA
2
$
$
553A(01)B
Precast Concrete Member, Wingwall
AQ
EA
4
$
$

601(01)A

Mobilization

LSQ
LS
1
$
$
625(08)
Seeding, Dry Method (with

mulch)

LSQ
LS
1
$
$

633(01)

Wood Posts
AQ
LF
36
$
$

633(17)

Object Markers
AQ
EA
4
$
$

637(01)

Large Dump Truck
AQ
HR
24
$
$
637(02)
Hydraulic Excavator with Thumb
AQ
HR
64
$
$
681(01)
Pedestrian By-Pass, Construct, Maintain, and Remove
LSQ
LS
1
$
$
-
-
-
-
-
-
-
-
-
-
-

Item 01b Grand Total→

* Pay Items with asterisk will be incorporated into the project work under Section 637 – Equipment Rental under the direction of the Contracting Officer.

Do not import material to the project site under Item 304(23) – Furnish Stream Simulation Material, Bed

Class 4 until directed to do so by the Contracting Officer.

Designated Method of Measurement: DQ – Designed Quantities; AQ – Actual Quantities;

LSQ – Lump Sum Quantities; SQ – Staked Quantities

Optional Bid Item 02a – Crushed Aggregate Surfacing (MP 0.00 to MP 3.0)

ITEM NO. 02a – sub-items
ITEM DESCRIPTION
METH. OF MEAS.
EST. QTY
UNITS
UNIT PRICE
TOTAL PRICE
304(11)B
Crushed Aggregate, Type Surfacing, Grading G, Compaction B (Commercial Source)
AQ
TON
6000
$
$

601(01)B

Mobilization
LSQ
LS
1
$
$
-
-
-
-
-
-
-
-
-
-
-

Item 02a Option Total→

Note:

Offerors must submit prices for all the Items (01a, 01b and 02a) Base Item 01a = Schedule A Base Item 01b = Schedule B

The Government will only award only one of the base items 01a or 01b, for which-ever represents the best overall value to the Government.

Government may award Optional Bid Item 02a at the time of contract award or by contract modification at any time prior to September 1, 2011- I.9 52.217-7 Option for Increased Quantity—Separately Priced Line Item (March 1989).

Proposals will be evaluated in accordance with Section L and M.

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF BIDDERS

NOTE: Offerors should address questions concerning VETS-100 reporting and reporting requirements to the Office of Veterans Employment and Training Services offices at the following address:

U. S. Department of Labor

VETS-100 Reporting

4200 Forbes Blvd., Suite 202

Lanham, MD 20703

Telephone: (301) 306-6752

Website: www.vets100.cudenver.edu

Reporting Questions: HelpDesk@vets100.com

Reporting Verification: Verify@vets100.com

K.1 AGAR 452.219-70 SIZE STANDARD AND NAICS CODE INFORMATION (JANUARY 2005)

The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:

Contract line item(s):

ALL

--NAICS Code

237310

--Size Standard

$33.5 million

K.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

(a)

(1) The North American Industry classification System (NAICS) code for this acquisition is 237310

(2) The small business size standard is $33.5 million

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)

(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies. (YES, IT IS INCLUDED AND IT APPLIES)

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvi) 52.225-4, Buy American Act--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification.

(xix) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to—

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

----(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration Program.

------(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small Business Competitiveness Demonstration Program.

------(iii) 52.219-22, Small Disadvantaged Business Status.

------(A) Basic.

------(B) Alternate I.

------(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

------(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

------(vi) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--Certification.

------(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

------(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.

------(ix) 52.227-6, Royalty Information.

------ (A) Basic.

------ (B) Alternate I.

------(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov . After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause
Title
Date
Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

K.3 52.209-7 Information Regarding Responsibility Matters. (Apr 2010)

(a) Definitions. As used in this provision—

“Administrative proceeding” means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

“Federal contracts and grants with total value greater than $10,000,000” means—

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000. (ten million)

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in—

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall enter the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).

“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

K.4 FAR 52.219-28 Post-Award Small Business Program Re-representation. (April 2009)

a) Definitions. As used in this clause—

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall re-represent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts—

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall re-represent its size status in accordance with the size standard in effect at the time of this re-representation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following re-representation and submit it to the contracting office, along with the contract number and the date on which the re-representation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 237310 assigned to contract number (solicitation AG-02RC-S-10-0027)

[Contractor to sign and date and insert authorized signer’s name and title].

K.5 52.223-13 Certification of Toxic Chemical Release Reporting (Aug 2003)

(a) Executive Order 13148, of April 21, 2000, Greening the Government through Leadership in Environmental Management, requires submission of this certification as a prerequisite for contract award.

(b) By signing this offer, the offeror certifies that—

(1) As the owner or operator of facilities that will be used in the performance of this contract that are subject to the filing and reporting requirements described in section 313 of the Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA) (42 U.S.C. 11023) and section 6607 of the Pollution Prevention Act of 1990 (PPA) (42 U.S.C. 13106), the offeror will file and continue to file for such facilities for the life of the contract the Toxic Chemical Release Inventory Form (Form R) as described in sections 313(a) and (g) of EPCRA and section 6607 of PPA; or

(2) None of its owned or operated facilities to be used in the performance of this contract is subject to the Form R filing and reporting requirements because each such facility is exempt for at least one of the following reasons: [Check each block that is applicable.]

[ ] (i) The facility does not manufacture, process, or otherwise use any toxic chemicals listed in 40 CFR 372.65;

[ ] (ii) The facility does not have 10 or more full-time employees as specified in section 313(b)(1)(A) of EPCRA, 42 U.S.C. 11023(b)(1)(A);

[ ] (iii) The facility does not meet the reporting thresholds of toxic chemicals established under section 313(f) of EPCRA, 42 U.S.C. 11023(f) (including the alternate thresholds at 40 CFR 372.27, provided an appropriate certification form has been filed with EPA);

[ ] (iv) The facility does not fall within the following Standard Industrial Classification (SIC) codes or their corresponding North American Industry Classification System sectors:

(A) Major group code 10 (except 1011, 1081, and 1094.

(B) Major group code 12 (except 1241).

(C) Major group codes 20 through 39.

(D) Industry code 4911, 4931, or 4939 (limited to facilities that combust coal and/or oil for the purpose of generating power for distribution in commerce).

(E) Industry code 4953 (limited to facilities regulated under the Resource Conservation and Recovery Act, Subtitle C (42 U.S.C. 6921, et seq.), or 5169, or 5171, or 7389 (limited to facilities primarily engaged in solvent recovery services on a contract or fee basis); or

[ ] (v) The facility is not located in the United States or its outlying areas.

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

L.1 FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

52.215-1 Instructions to Offerors--Competitive Acquisition (JAN 2004) 52.236-28 Preparation of Proposals – Construction (OCT 1997)

AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES

452.204-70 Inquiries (FEB 1988)

L.2 AGAR 452.215-71 Instructions For The Preparation Of Technical And Business Proposals (SEP 1999)

(a) - General Instructions. Proposals submitted in response to this solicitation shall be furnished in the following format with the numbers of copies as specified below.

(1) - The proposal must include a technical proposal and prices filled in the Schedule of Items. Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal that contains information for the non-price factors of Relevant Past Performance, Technical Approach & Key Personnel must not contain any reference to prices.

(2) - The Government will evaluate proposals in accordance with the evaluation criteria set forth in Section M of this RFP.

(4) - Offerors shall submit their proposal(s) in the following format and the quantities specified:

(a) 1 copy of the completed, signed offer (SF-1442 signed & dated in blocks 20a through 20b & the other Offeror SF-1442 blocks 14-17 & 19 to be filled out by the Offeror; the Schedule of Items with unit prices and totals filled out; Section K of the solicitation package appropriately filled out.)

(b) 3 copies of the technical proposal – No binders or bound material.

For:

1. Relevant Past Performance The technical proposal must address past performance for both the Offeror and any proposed major subcontractors. OFFERORS SHOULD PROVIDE ONLY THE INFORMATION LISTED BELOW. Performance information will be requested by the Government from references provided and other known sources.

Submit a list of similar project work that was completed by your firm or any of your proposed major subcontractors in at least the last 3 years. Emphasis is placed on past performance specifically related to the work elements in the solicitation – construction of similar structures with in-stream sensitivity and mitigation issues. Provide: So that each project listed has the following information associated with it in a readable, easy to garner out style:

1. Names, telephone numbers, email addresses of principal officials in charge of the project that are familiar with your performance. The emphasis is that we are able to contact them.

2. A description of the work involved.

3. The agency/company or individuals you completed the project for.

4. The size (value) and location of the contracts/work.

5. Contract numbers and name of the projects.

6. Provide information on any problems or challenges you encountered on the identified your projects and corrective actions taken – how you dealt with them.

The Office of Management and Budget (OMB) has authorized Federal agencies to collect past performance information under OMB clearance number 9000-0142. Both this information provided in the proposal, and Government records will be used to evaluate the Offeror's past performance; however, references other than those listed may also be contacted.

2. Technical Approach Evaluation Criteria

· Describe your general plan of operations for this project – include a project time and event flow chart for the operation. Describe how your construction methods will minimize stream disturbance. Speak to a de-watering plan.

· Describe your approach to quality control and safety

· Describe the resources dedicated to the project.

· Include any sub-contractors & suppliers e.g. PCI Certified Concrete Plant.

3. Key Personnel Evaluation Criteria

· Construction Superintendent qualifications and their role in this operation.

a. Site management experience working with structures construction – in-stream mitgation experience.

b. Skills, experience or other credentials within the firm to accomplish the work.

c. Project Contractor Quality Control (CQC) responsibilities and credentials.

Note the clause: H.5

AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

L.3 FAR 52.216-1 Type of Contract (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

L.4 FAR 52.222-5 -- Davis-Bacon Act—Secondary Site of the Work (Jul 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

L.5 FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:

Goals for minority participation for each trade Goals for female participation for each trade

2.7%

6.9% These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Southeast Alaska.

L.6 FAR 52.225-10 Notice of Buy American Act Requirement--Construction Materials (Feb 2009)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

L.7 FAR 52.233-2 Service of Protest (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

William Standley

Idaho Panhandle National Forest

3835 Schreiber Way

Coeur d’Alene, Idaho 83815

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

L.8 FAR 52.236-27 Site Visit (Construction) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

L.9 Contract Drawings And Technical Specifications Some of the larger drawings/plan sheets and/or technical specifications uploaded with this solicitation for you to access for viewing or printing from FedBizOpps can also be obtained from a professional reproduction firm. The Government will not supply hard copies of these other than what is available on FedBizOpps.

(a) The contract drawings & CSI specifications for this project may be purchased from Adaban Reprographics & Imaging, Spokane, WA, telephone (800) 572-3706. Their website is:

http://www.abadanspokane.com/

(b) The contract drawings may be purchased at nominal fee from this firm or the many others that offer this service for acquiring copies off of FBO for convenience and quality reproduction.

(c) Offerors may request/order copies of the contract drawings – by contacting Adaban and request:

(d) Solicitation No: AG-02RC-S-10-0027

Project Name: NF Grouse Creek Bridge Replacement

Attachment 2 – NF Grouse Ck Plans Sheets

Attachment 3 – NF Grouse Ck. Special Project Specs.

L. 10 52.217-5 Evaluation of Options (July 1990).

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

SECTION M--EVALUATION FACTORS FOR AWARD

M.1

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

52.217-5 Evaluation of Options (JUL 1990)

M.2

EVALUATION, NEGOTIATION AND AWARD PROCESS

Proposals will be evaluated and rated to determine which Offerors are within a competitive range, price and other factors considered. The Government intends to award without discussions. Proposals should be submitted initially on the most favorable terms that the offeror can submit to the Government, from both price and technical standpoints. However the Government may, after evaluation of proposals, conduct further oral or written discussions as appropriate, with all offerors whose proposals are within a competitive range. Proposals that do not address one or more criteria or sub-factors, may not be considered further for award.

Award Determination Award will be made to that responsive and responsible offeror (1) whose proposal is technically acceptable and (2) whose technical/cost relationship is the most advantageous to the Government. The critical factor in making any cost/technical trade-offs is not the spread between the technical ratings, but rather the significance of that difference. The significance of the difference in ratings will be determined on the basis of what that difference is and what it would cost the Government to take advantage of it. Award may not necessarily be made for technical-non-price capabilities that would appear to exceed those needed for fulfilling the requirements of this contract. The Government reserves the right to make cost/technical trade-offs that are in the best interest and to the advantage of the Government.

M.2.1 Evaluation Factors and Sub-factors

Proposals shall be prepared and submitted in accordance with instructions contained in L.2. The technical proposals will be evaluated and given an ordinal ranking to the factors. The non-price factors are listed in descending order of importance. All non-price factors, when combined, are approximately equal to price.

1. Relevant Past Performance Past Performance focuses on how well a firm has operated and completed work projects. The Government will evaluate the degree of confidence it has of a firm successfully operating and completing this project based on its past performance record on similar projects.

The Forest Service considers that current (within the last 3 years) and relevant (specifically water & sewer public works projects) demonstrated performance is a better indicator of ability than older or performance or performance in less similar work. Any offeror who does not have a record of relevant past performance will receive neither a favorable or unfavorable evaluation for this factor. The four sub-factors are approximately equal in value to support an overall Past Performance evaluation.

i. Quality of Work: Demonstrated ability to perform similar projects in accordance with contract specifications and conformance to good standards of workmanship & safety.

ii. Customer Satisfaction: Satisfaction of end users with the contractor's completed products and services.

iii. Timeliness of performance: compliance with delivery schedules; reliability;

responsiveness to technical direction.

iv. Business relations: Effective management, ability to manage projects involving

Sub-contracts, working relationship with the contracting officer and technical representatives, reasonable/cooperative behavior, flexibility, effective contractor recommended solutions to problems encountered, businesslike concern for government's interests.

Offerors that have more instances of similar projects, particularly those involving in-stream structure construction, with associated positive evaluations of past performance for those projects will be evaluated higher.

3. Technical Approach The plan of operation’s time and event course is coherent and understandable and reflects an understanding of the execution of this type of work. In stream mitigation measures, including the de-watering are realistic, proven and provide sufficient protection. Quality control & safety represents a calculated approach and is part and parcel of the operation.