Specifications.pdf
PDF 280 KB Posted
- Attached to
- Lower Jim Road Best Management Practice (BMP) Standards Project, Flathead National Forest
- Solicitation number
- AG-02NV-S-14-0052
About this file
02 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| Solicitation.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE
SUPPLEMENTAL SPECIFICATIONS
For
LOWER JIM ROAD BMPS
NFSR #’s 10296, 90548, 90552, 90553, 90554, 90608, 90607 & 91441
U.S.D.A. FOREST SERVICE
FLATHEAD NATIONAL FOREST
SWAN LAKE RANGER DISTRICT
April 2014
Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.03 Drawings and Specifications
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
151 - Mobilization
151.01 Description
151.03 Payment
155 - Schedules for Construction Contracts 155 Delete
157 - Soil Erosion Control
157.03 General
157.08 Water Crossings
170 - Develop Water Supply and Watering 204 - Excavation and Embankment
204.11 Compaction
204.12 Ditches
204.13 Sloping, Shaping, and Finishing
209 – Structural Excavation and Backfill
209.10 Backfill
209.11 Compacting
230 - Roadside Brushing 251 - Riprap
251.01 Description
251.07 Acceptance
303 - Road Reconditioning
303.01 Description
303.03 Ditch Reconditioning
303.04 Shoulder Reconditioning
303.05 Roadbed Reconditioning
303.07 Roadway Reconditioning
303.09 Acceptance
303.10 Measurement
602 - Culverts and Drains
602.03 General
602.05 Laying Metal Pipe
622 - Rental Equipment
622.02 Rental Equipment
622.04 Measurement
625 - Turf Establishment
625.03 General
625.04 Preparing Seedbed
625.05 Watering
625.06 Fertilizing
625.07 Seeding
625.08 Mulching
625.09 Protecting and Caring for Seeded Areas
625.11 Measurement
704 - Soil
704.07 Select Borrow
714 – Geotextile and Geocomposite Drain Material
714.01 Geotextile
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_02_17_2005
101.01 Meaning of Terms
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_02_22_2005
101.04 Definitions
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
http://www.nist.gov/
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS- 96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig ht of
W ay
R oa ds id e R oa ds id e
C le ar in g W id th
R oa dw ay
C le ar in g Li m it
X Y
G ro un d
Li ne
Tr av el ed
W ay C L
B er m S ur fa ce C ou rs e B as e
C ou rs e
Fi ll
S lo pe
B ac k S lo pe
D ra in ag e D itc h
G ro un d
Li ne
S ub gr ad e
R oa d B ed
S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns
S ee d ra w in gs fo r t yp ic al s ec tio ns
X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay
N ot e:
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all subsections and replace 103.01 Intent of Contract with the following.
This work involves repairing and maintaining existing roads by applying Best Management Practices (BMP’s) to approximately 7.3 miles of road. Work involves removing and disposing old culverts, replacing and installing new culverts, constructing drain dips, constructing sediment basins, backfilling, compacting, riprap placement, and road reconditioning. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
The roads are located on the Swan Lake Ranger District in Missoula County, Montana.
104 - Control of Work 104.00_nat_us_02_17_2005
Deletions
Delete sections 104.01, 104.02, and 104.04.
104.03_nat_us_02_22_2005
104.03 Drawings and Specifications
Delete subsection 104.03
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_nat_us_05_11_2004
105.02 Material Sources
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Riprap Source – Commercial or Government – The contractor may utilize a commercial source for riprap or use the designated government source. The government designated source for this project is the Kraft Creek Quarry, located on NFSR # 561Q near the end of NFSR 561 (Kraft Creek Road) in T19N R17W S20. There is no stockpiled riprap available in the Quarry. It is the contractor’s responsibility to mine/excavate required materials at locations and dimensions designated by the COR.
Select Borrow Site – Government – The Piper Creek Pit is designated as the government select borrow source for this project. It is located on the West side of NFSR # 888 and 966 in T22N R17W S18. Mine/excavate select borrow material at locations designated by COR.
Waste Site – Government Furnished – A waste site for excess and unsuitable material will be the Piper Creek Pit located on the West side of NFSR # 888 and 966 in T22N R17W S18. Waste material at locations designated by COR.
See Section 151 of the Supplemental Specifications for equipment cleaning requirements when working in the pit.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.01_nat_us_03_29_2005
106.01 Conformity with Contract Requirements
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to
106.05 inclusive. The primary method of acceptance is specified in each Section of work.
However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.
Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.
If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims
Delete the entire subsection.
107.06_nat_us_04_27_2005
107.06 Contractor’s Responsibility for Work
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_02_23_2005
109.02 Measurement Terms and Definitions
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
109.02 Measurement Terms and Definitions
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
151 - Mobilization 151.03_0110_us_07_26_2005
151.01 Description
Add the following at the end of the last sentence:
“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”
151.03 Payment
Delete paragraph (a).
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete
Delete Section 155 in its entirety.
157 - Soil Erosion Control 157.03_nat_us_02_24_2005
157.03 General
Delete the entire subsection and replace with the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.
Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
157.08 Water Crossings
At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.
170 - Develop Water Supply and Watering
Description
170.01 This work consists of developing an acceptable water supply, furnishing, hauling, and applying water.
Materials
170.02 Conform to the following subsection.
Water 725.01.
Construction Requirements
170.03 Development of Supply & Access. Develop water supplies and access to the water supplies as required. Use designated water sources or other approved water sources. Before using non-designated water sources, obtain all necessary permissions, water rights, and permits.
170.04 Equipment. Provide mobile watering equipment with watertight tanks of known capacity. Provide for positive control of water application from the driver’s position.
170.05 Application. Apply water uniformly without ponding or washing.
170.06 Acceptance. Developing water supplies and watering will be evaluated under Subsections 106.02 and 106.04.
Measurement
170.07 Measure the Section 170 items listed in the bid schedule according to Subsection 109.02.
Payment
170.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 170 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
204 - Excavation and Embankment 204.11_nat_us_04_11_2005
204.11 Compaction
Delete the first paragraph and replace it with the following:
For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
204.12_0116_us_04_11_2005
204.12 Ditches
Delete the entire subsection and replace it with the following:
204.12 Drainage Excavation. Construct side ditches, minor channel changes, inlet and outlet ditches, furrow ditches, ditches along the road but beyond roadway limits, drain dips and other minor earth drainage structures as shown on the plans. Utilize excavated material in accordance with Subsection 204.06.
Stake drain dips in a manner that ensures they will be constructed in accordance with the details shown on the plans. Bring the road to grade and have locations approved prior to staking drain dips.
204.15_nat_us_03_02_2005 Table 204-1 Sampling and Testing Requirements.
Add the following note to the table:
(2) When compaction methods (d) or (e) are used AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.
204.13 Sloping, Shaping, and Finishing
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class “J” shown in table 204-2.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper drainage.
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until visible displacement ceases.
(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.
Add Table 204-2—Construction Tolerances:
Table 204-2 Construction tolerances.
Tolerance Class(a)
A B C D E F G H I J K L M Roadbed width (ft) +0.5 +0.5 +1.0 +1.0 +1.0 +1.0 +1.5 +1.0 +2.0 +2.0 +2.0 +2.0 +2.0
Subgrade elevation
(ft)
+0.1 +0.2 +0.2 +0.5 +0.5 +1.0 +1.0 +1.5 +2.0 +3.0 +2.0 +3.0 (c)
Centerline alignment (ft)
+0.2 +0.2 +0.5 +0.5 +1.0 +1.0 `+1.5 +1.5 +2.0 +3.0 +3.0 +5.0 (c)
Slopes, excavation, and embankment (% slope(b)
+3 +5 +5 +5 +5 +5 +10 +10 +10 +10 +20 +20 +20
a. Maximum allowable deviation from construction stakes and drawings.
b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.
c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.
209 – Structural Excavation and Backfill 209.10_nat_us_10_23_2007
209.10 Backfill.
(a) General.
Add the following:
Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:
• Embankment height greater than 6 feet at subgrade centerline.
• Installation in a protected streamcourse.
• Round pipe with a diameter of 48 inches or greater.
• Pipe arches with a span of 50 inches or greater.
• Any box culvert of structure other than pipe culverts.
(b) Pipe culverts.
(1) Pipe culverts with compacted backfill.
Add the following:
Excavate an area on each side of the pipe as needed to effectively achieve compaction requirements. Backfill without damaging or displacing the pipe.
Complete backfilling of the trench with suitable material.
209.11_nat_us_2_24_2005
209.11 Compacting.
Delete the subsection and add the following:
Compact backfill using designated compaction method A, B, or C:
Method A. Ensure that backfill density exceeds the density of the surrounding embankment.
Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer using appropriate compaction equipment until visual displacement ceases. For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.
Method C. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
Table 209-1 Sampling and Testing Requirements
(2) Compaction methods (A) and (B) do not require AASHTO T-99 or T-310 test methods for foundation fill.
230 - Roadside Brushing 230.00_01_us_02_14_2005
Description
230.01 This work consists of removing limbs, residual slash, live roadside brush, and small trees between, or obtruding into the designated brushing limits. Brushing areas include turnouts.
Construction Requirements
230.02 Brushing. Cut all brush and small trees (6 inches diameter, or less, at the point of cut) inside the brushing limits and outside the roadbed no higher than 4 inches above ground level (6 inches for machine brushing). If rocks or other obstructions are encountered, cut no higher than 6 inches above the obstruction. Limb live trees with a diameter larger than 6 inches to a height of 10 feet above the road surface.
Cut all brush and trees located on the roadbed as nearly flush to the road surface as possible so stumps will not become a hazard to vehicle tires.
230.03 Windfalls. Limb windfalls lying within or across the brushing limits to a horizontal distance of 10 feet from each shoulder or at the brushing limit, whichever is least. Dispose of windfall material as slash.
230.04 Road Junctions. Do not deposit brushing debris on the roadway of adjoining roads.
230.05 Slash Treatment. Scatter all slash outside the brushing limits without damaging residual trees. Slash is defined as any material cut that has a length greater than 36 inches with a diameter greater than 3 inches at any point. Do not deposit any material in streams, streambeds, culvert inlets or outlets, drainage ways, or cattleguards.
Measurement
230.06 Linear measurements will be horizontal along the road centerline regardless of the amount of work required. Measure the Section 230 items listed in the bid schedule according to Subsection 109.02.
Payment
230.07 The accepted quantities will be paid for at the contract unit price for the Section 230 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Quantities will be the number of miles and fractions thereof along the road centerline, regardless of the amount of work required.
251 - Riprap 251.01_0110_us_02_02_2006
251.01 Description
Delete the first sentence and add the following:
This work consists of furnishing, hauling, and placing of riprap for bank protection, slope protection, drainage structures, erosion control, and other features shown on the plans.
251.07 Acceptance
Delete sampling and testing requirements of Table 251-1 and certification requirements of Subsection 106.03.
303 - Road Reconditioning 303.01_0116_us_02_15_2005
303.01 Description
Delete entire subsection and add the following:
This work consists of reconditioning ditches, shoulders, roadbeds, parking areas, turnouts, approach road intersections, cattleguards, and aggregate surfaces.
Clean rubber belts and opentops, construct 4% outslopes and maintain existing drain dips when shown on the plans.
303.03_0110_us_07_26_2005
303.03 Ditch Reconditioning
Delete the last sentence and add the following:
Dispose of waste as shown on the plans.
303.04 Shoulder Reconditioning
Delete the last sentence and add the following:
Dispose of waste as shown on the plans.
303.05 Roadbed Reconditioning
Delete this entire subsection and replace with the following:
Repair soft and unstable areas according to Subsection 204.07. Remove all organic, deleterious material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste as shown on the plans. Scarify and shape the traveled way and shoulders at locations and to the depth and width designated on the plans. Remove surface irregularities and shape to provide a uniform surface. Dispose of rock larger than 4 inches brought to the surface during scarification in areas designated on the plans.
For portions of roads not requiring scarification, the roadbed may contain rocks larger than 4 inches provided they do not extend above the finished roadbed surface. Reduce in place or remove rock extending above the finished roadbed surface. Dispose of removed rock in areas designated on the plans.
Compact using the following method as specified:
(a) Compaction A. Operate equipment over the full width.
(b) Compaction B. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
303.07 Roadway Reconditioning
Maintain the existing cross slope or crown unless otherwise shown on the plans. Establish a blading pattern that will retain the surfacing on the roadbed and provide a through mixing of the materials within the completed surface width.
303.09 Acceptance
Delete the first sentence.
303.10 Measurement
Modify the second paragraph as follows:
Measure ditch reconditioning and shoulder reconditioning by the mile, horizontally along the centerline of the roadway for each side of the roadway.
602 - Culverts and Drains 602.03_0110_us_02_03_2006
602.03 General
Delete the second and third sentence of the second paragraph.
Clean and paint damaged coating caused by welding, field cutting, or handling in accordance with AASHTO M 36M and ASTM A 849.
602.05 Laying Metal Pipe
Helically corrugated lock-seam pipe shall be installed with the seam at the inlet end placed below the horizontal centerline. This requirement applies to the outlet end, also, when the outlet is less than 5 feet below subgrade.
622 - Rental Equipment
622.02 Rental Equipment
Delete the first two sentences of the first paragraph and add the following:
Provide equipment of the type listed in the Schedule of Items. Provide equipment of at least the minimum size needed to efficiently perform the work. Submit the model number of the equipment to the CO for approval before delivery to the project site. Equipment shall be no more than 15 years old and shall be reasonably free of leaks and other mechanical deficiencies.
622.04 Measurement
Add the following:
The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in contract unit price.
625 - Turf Establishment 625.03_0110_us_02_03_2006
625.03 General
Delete this entire subsection and replace with the following:
Apply turf establishment to portions of slopes, ditches, waste areas, and other disturbed areas as soon as possible after being constructed to template lines unless otherwise specified in writing by the Contracting Officer; or during windy weather; or when the ground is excessively wet, frozen, or snow covered.
625.04 Preparing Seedbed
Delete this entire subsection.
625.05 Watering
Delete this entire subsection.
625.06 Fertilizing
Apply fertilizer having a chemical analysis as listed in (c) below by the following methods:
(a) Dry Method. Apply the fertilizer with approved power driven seeders, drills, fertilizer spreaders, or other mechanical equipment. Hand methods are also satisfactory.
(b) Hydraulic Method. Use hydraulic type equipment capable of providing a uniform application using water as the carrying agent. Add fertilizer to the slurry and mix before adding seed.
(c) Chemical Analysis. Apply fertilizer at the rate of 200 pounds per acre. Apply fertilizer having the following chemical analysis:
Nutrient Percent Nitrogen, N 16
Phosphorus, P2O5 16 Potassium, K 16
625.07 Seeding
Delete the first sentence and add the following:
Apply seed mix shown in (c) below by the following methods:
(a) Dry Method. Delete the first and third sentences.
Add the following after subsection (b):
(c) Seed Mix. In terms of pure live seed, furnish and apply the following kinds and amounts of seed. Obtain the pounds of seed to furnish per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
Example: 5 lbs Pure Seed/Acre = 6.55 lbs Commercial Seed/Acre 0.90X0.85(Purity=90% and Germination=85%)
Kind of Seed Quantity of Pure Live Seed (Lbs/Acre)
1. Blue Wild Rye (elymus glaucus) 12
2. Mountain Brome (bromus carinatus) 5
3. Bluebunch Wheatgrass (pseudoroegneria spiocata) 4
4. Slender Wheatgrass (elymus trachycaulus) 4 Total 25
Use certified blue-tagged seed where a name variety or cultivar is specified.
Provide blue tags from the seed used in mixing. Provide all test result labels from a certified seed analyst certifying that the seed is free of all the noxious weed seeds listed on the current “All States Noxious Weeds List”
Additionally, conduct lab tests for noxious weeds prior to seed mixing. Only after a finding and documentation in writing of no weeds on the current “All States Noxious Weeds List” will the seed be accepted and used.
625.08 Mulching
Apply straw mulch immediately after seeding and fertilizing. Apply mulch uniformily over the entire disturbed area by hand methods so that by visual observation, 60 percent of the seeded area is covered by a thin layer of straw.
To prevent the introduction of noxious weeds, use only State certified weed free straw.
625.09 Protecting and Caring for Seeded Areas
Delete the first sentence and add the following:
Protect and care for seeded areas until final acceptance.
625.11 Measurement
Delete the second, third, and fourth paragraph and add the following:
Measure seeding, fertilizing, and mulching by the acre on the ground surface or by lump sum.
704 - Soil 704.07_0110_us_02_03_2006
704.07 Select Borrow
Delete this entire subsection and replace with the following:
Furnish granular material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material. Select Borrow may be obtained from the Piper Creek Pit. Mine/excavate select borrow material at locations designated by COR. See Section 105 – Control of Material for legal description for the Piper Creek Pit.
714 – Geotextile and Geocomposite Drain Material 714.03_0110_us_02_03_2006
Add the following:
714.01 Geotextile
Supply a woven geotextile product such as GEOTEX 200ST by Propex or equal. The product should meet the following properties:
Tensile Strength (Grab) = 200 lbs..
Elongation = 15% CBR Puncture = 700 lbs.
Trapezodial Tear = 75 lbs.
UV Resistance % Retained at 500 hrs. = 70% Apparent Opening Size (AOS)3 = 40 US Std. Sieve Permittivity = .05 sec-1 Water Flow Rate = 4 gpm/ft2
Tables 714-1 and 714-4.
Add the following note to both tables:
(4) Woven slit film will not be allowed.
| Preface |
| 101 - Terms, Format, and Definitions |
| 101.01 Meaning of Terms |
| 101.03 Abbreviations. |
| 101.04 Definitions |
| 102 - Bid, Award, and Execution of Contract |
| 102 Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| Deletions |
| 104 - Control of Work |
| Deletions |
| 104.03 Drawings and Specifications |
| 104.06 Use of Roads by Contractor |
| 105 - Control of Material |
| 105.02 Material Sources |
| 105.05 Use of Material Found in the Work |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements |
| 106.07 Delete |
| 107 - Legal Relations and Responsibility to the Public |
| 107.05 Responsibility for Damage Claims |
| 107.06 Contractor’s Responsibility for Work |
| 107.09 Legal Relationship of the Parties |
| 107.10 Environmental Protection |
| 108 - Prosecution and Progress |
| 108 Delete |
| 109 - Measurement and Payment |
| 109 Deletions |
| 109.02 Measurement Terms and Definitions |
| 151 - Mobilization |
| 151.01 Description |
| 151.03 Payment |
| 155 - Schedules for Construction Contracts |
| 155 Delete |
| 157 - Soil Erosion Control |
| 157.03 General |
| 157.08 Water Crossings |
| 170 - Develop Water Supply and Watering |
| 204 - Excavation and Embankment |
| 204.11 Compaction |
| 204.12 Ditches |
| 204.13 Sloping, Shaping, and Finishing |
| 209 – Structural Excavation and Backfill |
| 209.10 Backfill. |
| 209.11 Compacting. |
| Table 209-1 Sampling and Testing Requirements |
| 230 - Roadside Brushing |
| 251 - Riprap |
| 251.01 Description |
| 251.07 Acceptance |
| 303 - Road Reconditioning |
| 303.01 Description |
| 303.03 Ditch Reconditioning |
| 303.04 Shoulder Reconditioning |
| 303.05 Roadbed Reconditioning |
| 303.07 Roadway Reconditioning |
| 303.09 Acceptance |
| 303.10 Measurement |
| 602 - Culverts and Drains |
| 602.03 General |
| 602.05 Laying Metal Pipe |
| 622 - Rental Equipment |
| 622.02 Rental Equipment |
| 622.04 Measurement |
| 625 - Turf Establishment |
| 625.03 General |
| 625.04 Preparing Seedbed |
| 625.05 Watering |
| 625.06 Fertilizing |
| 625.07 Seeding |
| 625.08 Mulching |
| 625.09 Protecting and Caring for Seeded Areas |
| 625.11 Measurement |
| 704 - Soil |
| 704.07_0110_us_02_03_2006 |
| 704.07 Select Borrow |
| 714 – Geotextile and Geocomposite Drain Material |
| 714.03_0110_us_02_03_2006 |
| 714.01 Geotextile |
| Supply a woven geotextile product such as GEOTEX 200ST by Propex or equal. The product should meet the following properties: |
| Tensile Strength (Grab) = 200 lbs.. |
| Elongation = 15% |
| CBR Puncture = 700 lbs. |
| Trapezodial Tear = 75 lbs. |
| UV Resistance % Retained at 500 hrs. = 70% |
| Apparent Opening Size (AOS)P3P = 40 US Std. Sieve |
| Permittivity = .05 secP-1 |
| Water Flow Rate = 4 gpm/ftP2 |
| Tables 714-1 and 714-4. |
File details come from the government source that posted it. Updated .