Construction_Cost_Estimate_Breakdown_00.xls
XLS spreadsheet 45 KB Posted
- Attached to
- 2016 East Branch Weiser River AOP Federal contract opportunity
- Solicitation number
- AG-0261-S-16-0044
About this file
Attach 3 proposal worksheet .xls
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW.pdf | ||
| Construction_Cost_Estimate_Breakdown_00.pdf | ||
| ID86.pdf | ||
| AG-0261-S-16-0044.pdf | ||
| maps_ _Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| MATERIAL COST | LABOR COSTS | ||||||||||
| UNIT | OTHER | ||||||||||
| LINE | ITEM | OF | QUANTITY | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | EST 074 | EST 556 | MANDAYS | RATE | COSTS | TOTAL | ||||
| (1) | (2) | (3) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 151.01 | Mobilization | LSQ | 1 | 1 | |||||||
| 152.21 | Construction survey and staking, | EA | 1 | 1 | |||||||
| 157.13 | Soil Erosion & Pollution Control, Dewatering | LSQ | 1 | 1 | |||||||
| 203.05 | Removal structures and obstructions remove from project | LSQ | 1 | 1 | |||||||
| 209.11 | Structure excavation and backfill | LS | 1 | 1 | |||||||
| 251.11A* | Placed riprap, class 3 | CY | 15 | - | |||||||
| 251.11B* | Placed riprap, class 5 | CY | - | 26 | |||||||
| 308.09* | Roadway aggregate surfacing (government supplied), Compaction method 1 | CY | 45 | 45 | |||||||
| 552.01A | Structural Concrete Class A for precast footings 074-MP 6.5 | LF | 48 | - | |||||||
| 552.01B | Structural Concrete Class A for precast footings 557-MP 0.01 | LF | - | 100 | |||||||
| 553.01 | 15 Deg. Skew Precast (18’W x 8’H x 24’L) concrete box including curb | LF | 24 | - | |||||||
| 602.03 | 42” Equivalent Diameter arch pipe | LF | 30 | - | |||||||
| 603.01 | 16’ span, 5’-3“rise, structural plate pipe arch, 12 gage thickness | LF | - | 50 | |||||||
| 619.01 | Remove, salvage, replace existing gate | EA | - | 1 | |||||||
| 625.03 | Turf Establishment (Government supplied seed) | LSQ | 1 | 1 | |||||||
| 633.06 | Object Markers | EA | 4 | - | |||||||
| 648.04A* | Placed streambed simulation rock, Bed Class 8 Method A | CY | 16 | - | |||||||
| 648.04B* | Placed streambed simulation rock, Bed Class 12 Method A | CY | - | 30 | |||||||
| 648.04C | Install vortex rock grade control structure as directed by COR at inlet and outlet of 557-MP 0.01 | EA | - | 2 | |||||||
| 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. | |||||||||||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound - LB). | |||||||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by | |||||||||||
| the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | |||||||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value. | |||||||||||
| Col 10 Line Total. Self-explanatory. | |||||||||||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows | ||||||||||
| TOTAL MATERIAL COSTS | $ | 0.00 | |||||||||
| TOTAL LABOR COSTS | $ | 0.00 | |||||||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | |||||||||
| TOTAL DIRECT COSTS | $ | 0.00 | |||||||||
| OVERHEAD | % | $ | 0.00 | ||||||||
| SUBTOTAL | $ | 0.00 | |||||||||
| PROFIT | % | $ | 0.00 | ||||||||
| TOTAL PRICE | $ | 0.00 | |||||||||
| DATE | FIRM NAME | ||||||||||
| TITLE | BY | ||||||||||
| (Signature) | |||||||||||
| INSTRUCTIONS TO OFFERORS | |||||||||||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||||||||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | |||||||||||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | ||||||||||
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | |||||||||||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||||||||
| a. | The existing, verifiable data. | ||||||||||
| b. | The judgmental factors applied in projecting from known data to the estimate, and | ||||||||||
| c. | The contingencies used by the offeror in his proposed price. | ||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||||||||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | ||||||||||
| and made available to the contracting officer his authorized representative upon request. | |||||||||||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | ||||||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||||||||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | |||||||||||
| with any negotiations prior to contract award. |
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||||||
| itemizing of all direct costs. | ||||||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||||||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||||||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||||||
| the contractor is responsible for determining quantity estimates. | ||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||||||
| significant dollar value. | ||||||
| Col 10 Line Total. Self-explanatory. | ||||||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows | ||||||
| TOTAL MATERIAL COSTS | $ | |||||
| TOTAL LABOR COSTS | $ | |||||
| TOTAL OTHER DIRECT COSTS | $ | |||||
| TOTAL DIRECT COSTS | $ | |||||
| OVERHEAD | % | $ | ||||
| SUBTOTAL | $ | |||||
| PROFIT | % | $ | ||||
| TOTAL PRICE | $ | |||||
| DATE | FIRM NAME | |||||
| TITLE | BY | |||||
| (Signature) | ||||||
| INSTRUCTIONS TO OFFERORS | ||||||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||||||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | ||||||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||||||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||
| a. | The existing, verifiable data. | |||||
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. | The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer his authorized representative upon request. | ||||||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||||||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | ||||||
| with any negotiations prior to contract award. |