Construction_Cost_Estimate_Breakdown_00.pdf

PDF 627 KB Posted

Attached to
2016 East Branch Weiser River AOP Federal contract opportunity
Solicitation number
AG-0261-S-16-0044
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attach 3 proposal worksheet .pdf

View the file

Other files for this federal contract opportunity

Other files attached to 2016 East Branch Weiser River AOP, newest first.
File Type Posted
SOW.pdf PDF
AG-0261-S-16-0044.pdf PDF
maps_ _Drawings.pdf PDF
ID86.pdf PDF
Construction_Cost_Estimate_Breakdown_00.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY QUANTITY UNIT TOTAL MANHOUR AVERAGE TOTAL DIRECT LINE

NO MEASURE EST 074 EST 556 MANDAYS RATE COSTS TOTAL

(1) (2) (3) (3) (4) (5) (6) (7) (8) (9) (10)

151.01 Mobilization LSQ 1 1

152.21 Construction survey and staking, EA 1 1

157.13 Soil Erosion & Pollution Control, Dewatering LSQ 1 1

203.05 Removal structures and obstructions remove from project LSQ 1 1

209.11 Structure excavation and backfill LS 1 1

251.11A* Placed riprap, class 3 CY 15 ‐

251.11B* Placed riprap, class 5 CY ‐ 26

308.09* Roadway aggregate surfacing (government supplied), Compa CY 45 45

552.01A Structural Concrete Class A for precast footings 074‐MP 6.5 LF 48 ‐

552.01B Structural Concrete Class A for precast footings 557‐MP 0.01 LF ‐ 100

553.01 15 Deg. Skew Precast (18’W x 8’H x 24’L) concrete box includ LF 24 ‐

602.03 42” Equivalent Diameter arch pipe LF 30 ‐

603.01 16’ span, 5’‐3“rise, structural plate pipe arch, 12 gage thickne LF ‐ 50

619.01 Remove, salvage, replace existing gate EA ‐ 1

625.03 Turf Establishment (Government supplied seed) LSQ 1 1

633.06 Object Markers EA 4 ‐

648.04A* Placed streambed simulation rock, Bed Class 8 Method A CY 16 ‐

648.04B* Placed streambed simulation rock, Bed Class 12 Method A CY ‐ 30

648.04C Install vortex rock grade control structure as directed by COR EA ‐ 2

0.00 0.00 0.00 0.00

CONSTRUCTION COST ESTIMATE BREAKDOWN

AG-0261-S-16-0044 Attach 3 Page 1 of 3

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound - LB).

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLE BY

(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the

AG-0261-S-16-0044 Attach 3 Page 2 of 3 purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

AG-0261-S-16-0044 Attach 3 Page 3 of 3