SUPPORT DOCUMENT B - DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND_1_AG-0261-S-15-0112_NORTHFORK_HELIBASE_PROJECT_2015.pdf | ||
| SUPPORT_DOCUMENT_C_WORKERS_COMPENSATION_FORM_NORTHFORK_HELIBASE__PROJECT_2015.pdf | ||
| SUPPORT_DOCUMENT_A_SPECIFICATIONS_NORTHFORK_HELIBASE__PROJECT_2015.pdf | ||
| AG-0261-S-15-0112_NORTHFORK_HELIBASE_PROJECT_2015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPORTING DOCUMENT – B
AG-0261-S-15-0112
NORTHFORK HELIBASE PROJECT 2015
DRAWINGS
8 Pages (including this header page)
BID OPTION "C"
T
T
T
E
E E E E E E E E E
GENERAL ELECTRICAL NOTES
THE WORK AT THE SITE INCLUDES:
1. COORDINATE SERVICE WITH IDAHO POWER AND SERVICE SIZE REQUIRED. INSTALL SERVICE
EQUIPMENT AND PANEL AND MEET IDAHO POWER REQUIREMENTS INCLUDING MOUNTING
HEIGHTS.
1.1. ELECTRICAL SERVICE SHALL BE RATED 22,000 AIC MINIMUM. VERIFY WITH MINIMUM
RATING WITH POWER COMPANY AND INCREASE IF REQUIRED. SERIES RATED
EQUIPMENT IS ALLOWED.
1.2. BURIED PORTION OF SERVICE LATERAL AND ALL ASSOCIATED IDAHO POWER
CONNECTION FEES SHALL BE PAID FOR SEPARATELY BY THE GOVERNMENT DIRECTLY
TO IDAHO POWER.
1.3. SERVICE SHALL BE KEPT 36-INCHES FROM GAS SERVICES.
1.4. BUILDING FOUNDATION SHALL INCLUDE CONCRETE ENCASED GROUNDING ELECTRODE.
2. MORE THAN ONE LOAD CENTER MAY BE PROVIDED. CIRCUIT BREAKERS SHALL BE
EQUIVALENT TO SQUARE D QO TYPE OR BETTER, NO TANDEM OR HALF SIZED BREAKERS
ALLOWED.
3. PROVIDE A 2-INCH CONDUIT FOR FUTURE PHONE OR CABLE TV SERVICES. CONDUIT SHALL
BE BURIED 24-INCHES MINIMUM. KEEP SEPARATE FROM POWER FEEDERS A MINIMUM OF
12-INCHES HORIZONTALLY.
4. HOME RUN TELEVISION INTERNAL CABLE TO TELECOMMUNICATIONS CLOSET, LEAVING A
TERMINATED 10-FOOT PIGTAIL LOOSELY COILED IN CLOSET.
5. ELECTRICAL SHOWN IS A MINIMUM AND MAY VARY BASED ON SUBMITTED FLOOR PLANS.
SUBMIT ELECTRICAL PLAN.
OPTIONS OF 4' AND 8' EXTENSIONS AND AIR CONDITIONING
6. 4' EXTENSION OF BUILDING: ONE ADDITIONAL RECEPTACLE TO BE ADDED TO EITHER THE
CUBICLE OFFICES OR COMMUNICATIONS AREAS AND ONE BREAK AREA COUNTER TOP
RECEPTACLE, TOTAL. LOCATIONS TO BE APPROVED BY CONTRACTING OFFICER
REPRESENTATIVE.
7. 8' EXTENSION OF BUILDING: TWO ADDITIONAL RECEPTACLES TO BE ADDED TO EITHER THE
CUBICLE OFFICES OR COMMUNICATIONS AREAS, ONE BREAK AREA COUNTER TOP
RECEPTACLE AND ONE WALL RECEPTACLE, TOTAL. LOCATIONS TO BE APPROVED BY
CONTRACTING OFFICER REPRESENTATIVE.
8. AIR CONDITIONING: PROVIDE AIR CONDITIONING CIRCUIT WITH DISCONNECT AND ALL ELSE
NEEDED FOR PROPER AC OPERATION.
P
CRAWL SPACES AND ATTIC SPACES LIGHTING AND RECEPTACLES
1- AT CRAWL AND ATTIC ACCESS, INSTALL ONE GFCI RECEPTACLE AND SINGLE POLE PILOT SWITCH ON THE
CIRCUIT SERVING THE SPACE WITH THE ACCESS ONLY ACCESSIBLE FROM WITHIN THE SPACE.
2- SWITCH SHALL CONTROL 2 TYPE "N" LUMINAIRES LOCATED TO LIGHT THE SPACE. LOCATIONS SHALL BE
APPROVED BY THE CONTRACTING OFFICER BEFORE INSTALLATION.
SERVICE CALCULATIONS
NEC 220.82
(3.5VA/FT2)(1610FT2)= 5,635
(1KW)(2 SMALL APPL)= 2,000
(0.18KW)(38 RECEPT)= 6,840
TOTAL= 14,475
REFRIGERATOR= 600
UPS= 3,000
2 TRAILER PADS= 17,280
SEWAGE LIFT (1/2HP)= 2,540
HELIPAD RECEPTACLES 360
TOTAL VA= 38,255
OTHER LOADS THAT SHALL BE INCLUDED:
FURNACE MOTOR @ 100%
A/C CONDENSER @ 100% EVEN IF OPTION NOT AWARDED
SERVICE, MAIN BREAKER AND PANEL SHALL BE 200 AMP, 120/240 VAC
SINGLE PHASE MINIMUM.
PANELS SHALL BE LARGE ENOUGH TO ACCOMMODATE 5 BLANK BREAKER
SPACES BEYOND INSTALLED BREAKERS FOR FUTURE FEEDER AND OTHER
POSSIBLE LOADS.
LOAD CENTER DISTRIBUTION
THE FOLLOWING IS A LIST OF COMMON CIRCUITS MINIMUM:
# AMPS DESCRIPTION
A-1 20 RECEPTACLE-SOUTHWEST OFFICE
A-2,4 100 FEEDER-TRAILERS AND LIFT STATION
A-3 20 RECEPTACLE-SOUTHEAST OFFICE/EXTERIOR
A-5 20 RECEPTACLE-MIDDLE EAST OFFICE
A-6 15 LIGHT-SOUTH END
A-7 20 RECEPTACLE-SHARED OFFICE SPACE
A-8 15 LIGHT-NORTH END
A-9 20 RECEPTACLE-COMMUNICATIONS AREA
A-10 20 RECEPTACLE-TELECOM CLOSET SOUTH
A-11 20 RECEPTACLE-TRAINING AND BREAK AREAS
WALLS/EXTERIOR
A-12 30 RECEPTACLE-TELECOM CLOSET UPS
A-13 15 RECEPTACLE-FRIDGE
A-14 20 RECEPTACLE-TELECOM CLOSET NORTH
A-15 20 RECEPTACLE-BREAK COUNTER NORTH
A-16 20 FURNACE
A-17 20 RECEPTACLE-BREAK COUNTER SOUTH
A-19 20 RECEPTACLE-WOMENS RESTROOM/MECH
A-21 20 RECEPTACLE-MENS RESTROOM
A-22 20 RECEPTACLE-HELIPAD (BREAKER ONLY AND
SHALL BE IN EXTERIOR LOAD CENTER, OR
CIRCUIT FULLY INSTALLED TO A 6X6X4, NEMA
3R OR 4, JUNCTION BOX ON BUILDINGS EAST
SIDE NEAR FOUNDATION)
A-18,20 ?? AIR CONDITIONING OPTION: SIZE AS
REQUIRED
OTHER CIRCUITS THAT ARE NOT SHOWN INCLUDE BUT ARE
NOT LIMITED TO:
WATER HEATER AND DISCONNECT- GAS WATER HEATER WITH
SMALL LOADS MAY BE PLACED ON OTHER CIRCUITS.
REQUIRED CRAWL SPACE AND ATTIC SPACE LIGHTING AND
RECEPTACLES AS DESCRIBED MAY BE PLACED ON OTHER
CIRCUITS.
OFFICE AREAS (01,02,11)
PLACE RECEPTACLES
ACCORDING TO NEC
210.52(A)(1) EXCEPT 4
FT INSTEAD OF 6 FT
LIKE AS SHOWN.
CUBICLE AND COMMUNICATIONS AREAS SHALL
HAVE 12 RECEPTACLES SERVICING THE WALLS.
BREAK AND TRAINING AREAS SHALL HAVE
4 TOTAL RECEPTACLES SERVICING THE
WALLS ALONG WITH THOSE REQUIRED FOR
COUNTER AN FRIDGE.
A-11A-11
A-11
A-11
A-11
A-9
A-9
A-9
A-9A-9A-9A-7A-7A-7
A-7
A-7
A-7
A-5
A-3
A-1
A-3
A-21 A-19
A-19
A-10
A-12
A-14
A-17
A-15 A-13
A-17
P
A-5
A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
B
LIGHTING NOTES
GENERAL
1. A-TYPE LUMINAIRES ARE 2-TUBE; B-TYPE ARE SINGLE TUBE.
2. WHERE BI-LEVEL CONTROL IS CALLED FOR, LUMINAIRES SHALL HAVE
SHARED BALLASTS OR SINGLE TUBE BALLASTS SO THAT EACH LUMINAIRE
CAN HAVE ONE TUBE LIT OR BOTH DEPENDING ON OCCUPANTS CHOICE.
2.1. OTHER AREAS DO NOT HAVE THIS REQUIREMENT.
3. ELECTRONIC BALLASTS ONLY.
4. MOTION SENSOR COVERAGE SHALL BE ABLE TO DETECT HAND/ARM
MOVEMENT THROUGHOUT AREA TO BE COVERED.
5. A CENTRALIZED LIGHTING CONTROL SYSTEM IS NOT REQUIRED.
PRIVATE AND SHARED OFFICES
6. LIGHTING SHALL BE CONTROLLED BY A SINGLE, MANUAL OR AUTO ON/
AUTO OFF, OCCUPANCY SENSOR, WITH BI-LEVEL CONTROL SO THAT
WHEN FIRST CALLED FOR 50% OF EACH LUMINAIRE IS LIT AND UPON USER
CHOICE, THE REST OF LUMINAIRE IS LIT.
MECHANICAL AND TELECOM ROOMS
7. LIGHTING SHALL BE CONTROLLED BY A SINGLE POLE SWITCH.
RESTROOMS
8. LIGHTING AND FART FANS SHALL BE CONTROLLED BY A CEILING
MOUNTED ULTRASONIC OCCUPANCY SENSOR SET FOR 15 MINUTES.
SENSOR MAY HAVE A WALK THROUGH FEATURE ACTIVE.
HALL
9. LIGHTING SHALL BE CONTROLLED BY A CEILING MOUNTED OCCUPANCY
SENSOR SET FOR WALK THROUGH.
CUBICLE OFFICES, COMMUNICATIONS AREA, AND TRAINING AND BREAK AREA
10. EACH OF THESE THREE AREAS (TRAINING AND BREAK AREA COMBINED, 4
LUMINAIRES EACH AS SHOWN) SHALL BE SEPARATELY CONTROLLED AS
FOLLOWS:
10.1. LIGHTING SHALL BE CONTROLLED BY CEILING MOUNTED OCCUPANCY
SENSOR(S) SET FOR 20 MINUTES AND WITH WALK THROUGH FEATURE
ACTIVE. SENSORS SHALL DETECT HALL TYPE AREAS AND MAY
DETECT INTO NEIGHBORING AREAS.
10.2. A SINGLE DEVICE (TWO SWITCHES ON A SINGLE YOKE, EACH SWITCH
CONTROLS HALF THE TUBES ON OR OFF) LOCATED AT THE NEAREST
ENTRANCE SHALL PROVIDE MANUAL BI-LEVEL CONTROL AND ALL OFF.
10.3. OPERATION: IF A SWITCH IS ON AND THE ASSOCIATED OCCUPANCY
SENSOR SIGNALS OCCUPIED, THE TUBE ASSOCIATED WITH THE
SWITCH ARE LIT. WHEN BOTH SWITCHES ARE OFF FOR AN AREA THE
LIGHTS WILL NOT COME ON.
EXTERIOR LIGHTING
11. ALL EXTERIOR LIGHTING PICKED IS PHOTO-CONTROLLED AND MOTION
SENSOR TYPE.
12. EACH ENTRY SHALL BE ON SEPARATE PILOT LIGHT SWITCHES (PILOT
LIGHT IS ON WHEN IN THE ON POSITION).
13. EMERGENCY OPERATION NOT REQUIRED.
OPTIONS OF 4' AND 8' EXTENSIONS
14. 4' EXTENSION OF BUILDING: NO CHANGE OTHER THAN LIGHT
PLACEMENTS WILL VARY, LOCATIONS TO BE APPROVED BY CONTRACTING
OFFICER REPRESENTATIVE.
15. 8' EXTENSION OF BUILDING: 4 ADDITIONAL A-TYPE LUMINAIRES ARE
REQUIRED, CONTROLLED BY PREVIOUSLY REQUIRED CONTROLS. ALL
LOCATIONS AND CONTROL IN THE OPEN AREA TO BE APPROVED BY THE
CONTRACTING OFFICERS REPRESENTATIVE.
B
C
C
A-8 A-8
A-8
A-8
A-8
A-6
A-6
A-6A-6
A-6
A-6A-6
A-6
File details come from the government source that posted it. Updated .