AG0120S150014_A002.pdf
PDF 85 KB Posted
- Attached to
- Landing Craft/Crew Boat Package Federal contract opportunity
- Solicitation number
- AG-0120-S-15-0014
About this file
AG-0120-S-15-0014 Amendment 002 responds to questions submitted via email and extends the response date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG0120S150014_A001.pdf | ||
| AG0120S150014_Layout_PictureExamples.pdf | ||
| AG0120S150014_LandingCraft_rfp_FNL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0120-S-15-0014
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ANCHORAGE AK 99501
161 EAST 1ST AVENUE DOOR 8
CHUGACH NF-SUPERVISORS OFFICE
USDA FOREST SERVICE
05/15/2015000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/27/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
30 ft., Welded Aluminum Landing Craft Package: includes boat, motors and trailer
LIST OF CHANGES:
Bids due date : 2015-05-19 00:00:00 to 2015-05-27
Amendment written to respond to questions submitted via email:
Question 1: If the boat is slightly over the 32' length is that okay?
FS Response: Length slightly over 32' may include the outboards.
Question 2: The kayaks on the roof. We don't understand how they stay on their sides under the radar arch, is there some sort of bracketry required for this? If so do you have the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DENISE MURPHY
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-0120-S-15-0014/000002
Kayak dims?
FS Response: The kayaks will be stored flat on the roof under the arch for radar and antenna.
No contractor provided bracketry required.
Question 3: Regarding the first line item, "32'
Max Vessel Length Overall". Referring to the boat at the transom, should I include the swim step/motor bracket and the motors in this measurement? (If the motors are included, should they be measured in the up or down position?) At the bow, should the bow door be in the up or down position when acquiring this measurement?
FS Response: Reference response to Question 1.
When acquiring the measurement, the outboards should be down and bow door up.
Change to specifications regarding mount locations for davit. The "second davit location", as referenced on page 14 of the specifications, is removed in its entirety. The only davit mount location is the "electric powered davit/crane" roof mount shown on page 13 of the specifications.
The date for responses has been extended to 27
May 2015. The time for submission has not changed.
Offerors shall acknowledge all amendments in their response.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .