Question_and_Answers__2.docx

DOCX document 12 KB Posted

Attached to
Anan Bay Wildlife Observatory Recreational Facilities Construction
Solicitation number
AG-0116-S-16-0026
Issued by

View the file

Other files

File Type Posted
Amended_DRWG_SET_-_08-17-2016.pdf PDF
Amendment_001.pdf PDF
Amended_SPECS_08-17-2016.pdf PDF
Questions_and_Answers_for_Anan_Observation_AG.docx DOCX document
Photo_Log.pdf PDF
Solicitation_-_AG-0116-S-16-0026.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers #2

1. Can a quad and small trailer be used to transport material to the observatory?

See contract provisions regarding approval for use of equipment on the trail. It is likely that a quad would be allowed on suitable portions of the trail.

2. If a helicopter is used to drop off supplies, is there enough clear space at the site?

The contractor will have to make their own determination of site suitability for helicopter operations.

3. Do any of the existing trails that need to be demo currently have base rock? If so does this need to be dug out?

If "Base Rock" is imported shot-rock type materials, the answer is no. Excavations will certainly encounter solid rock, see contract provisions.

4. Does the concrete need to be tested by a third party for the observatory work if the contractor uses 4000psi bags of concrete?

This will be addressed in the upcoming solicitation amendment.