0116S150013SectionJAttachments.pdf
PDF 26 MB Posted
- Attached to
- Cascade Creek Trail Improvement Stewardship Project Federal contract opportunity
- Solicitation number
- AG-0116-S-15-0013
About this file
Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0116S150013_A0004.pdf | ||
| amend0003.pdf | ||
| amend0002.pdf | ||
| Questions_and_answers_051815.pdf | ||
| Amend0001.pdf | ||
| Questions_and_Answers_051415.pdf | ||
| Questions_and_Answers_050815.pdf | ||
| PreProposalMeetingNotes_050615.pdf | ||
| 0116S150013CascadeSTWD_041615.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. FOREST SERVICE
Supplemental Project Specifications for Trail Construction/Reconstruction
Appendix D
Barth Hamberg
4/17/2015
Supplemental Project Specifications included in full text are as follows:
Section 901—Abbreviations, Acronyms, and Terms Section 902—Definitions Section 903—Intent of Contract Section 904—Maintenance for Traffic Section 905—Control of Materials Section 906—Measurement and Payment Section 907—Quality Assurance and Quantity Measurement Section 911—Clearing and Grubbing Section 912—Excavation and Embankment Section 930—Solid Rock Removal Section 932—Boardwalk Section 941—Aggregate and Stone Construction Section 951—Mobilization Section 956—Miscellaneous Work Section 959—Boulder Handrail and Rope
Section 901—Abbreviations, Acronyms, and Terms
901.01 Terms, Organizations, and Standards
(a) Specification Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject “the Contractor,” is implied. Also implied in this language is “shall,” “shall be,” or similar words or phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project. Wherever “directed,” “required,” “prescribed,” or similar words are used, the “direction,” “requirement,” or “order” of the CO is intended. Similarly, wherever “approved”, “acceptable”,” suitable”, “satisfactory”, or similar words are used, they mean “approved by,” “acceptable to,” or “satisfactory to” the CO. The word “will” generally pertains to decisions or actions of the CO. Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for the public works contracts.
(b) Abbreviations and Acronyms AASHTO American Association of State Highway and Transportation Officials AGGR Aggregate AQ Actual Quantities AS Aggregate Surfacing ASTM American Society for Testing and Material BW Boardwalk CL Centerline CO Contracting Officer DQ Design Quantities EA Each FBB Full Bench Blasting HR Hour LF Linear Feet LS Lump Sum LSQ Lump Sum Quantities MW Miscellaneous Work NW No Work NBS National Bureau of Standards PS Product Standard issued by the U.S. Department of Commerce RA Rest Area SHT Sheet SOD Stone Open Drain SP Stone Pitching SRR Solid Rock Removal SRS Stone Riser Steps SRW Stone Retaining Wall SS Step Stones
Section 902—Definitions
When the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:
Base Course. The layer or layers of specified material of designed thickness placed on a trailbed to support surfacing.
Batter. A backward and upward slope of the face of a wall.
Berm. The ridge of material formed on the outer edge of the trail that projects higher than the tread.
Borrow. Suitable materials taken from approved sources designated on the drawings or on the ground, to be used for embankments and backfilling.
Bridge. A structure, including supports, erected over a depression or stream, and having a deck to carry traffic.
Catch Point. The outer limits of a trailway where the excavation and/or embankment intersect with the ground line.
Clearing Limit. The area over and beside the trail that is cleared of trees, limbs, and other obstructions.
Compacted. Consolidation that is obtained by tamping or rolling suitable material until no noticeable displacement of material is observed.
Contracting Officer (CO). An official of the Government with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Danger Tree. An unstable tree 5 inches or greater in diameter at breast height that is likely to fall across the trail.
Designated on the Ground. The location of materials, work areas, and construction items, including lines and grades, marked on the ground with stakes, flagging, tags, or paint.
Drawings. Documents showing details for construction of a facility, including but not limited to straight-line diagrams, trail logs, standard drawings, construction logs, plan and profile sheets, cross-sections, diagrams, layouts, schematics, descriptive literature, and similar materials.
Duff. Organic material overlying rock or mineral soil.
Embankment. A structure of suitable material placed on the prepared ground surface and constructed to the trailbed elevation.
Excess Excavation. Material in the trailway in excess of that needed for construction of designed trailways.
Ford. A water-level stream crossing constructed to provide a level surface for safe traffic passage.
Full Bench. Trailbed constructed entirely on undisturbed material.
Grade. The vertical distance of ascent or descent of the trail expressed as a percentage of the horizontal distance.
Header Rock. Rock laid with the narrow end towards the face of the wall.
Inslope. Where the trail tread is sloped downward toward the backslope.
Mineral Soil. Soil or aggregate that is free from organic substances and contains no particles larger than 2 inches at their greatest dimension.
Outslope. Where the trail tread is sloped downward toward the embankment or daylight side of the trailway.
Sideslope. The natural slope of the ground, usually expressed as a percentage.
Slough. That material from the backslope or the area of the backslope that has raveled onto the trailbed.
Slump. Where the trailbed material has moved downward, causing a dip in the trail grade.
Solid Rock Removal. The separation and removal of previously solid portions of bedrock to create stable final rock cut faces and trail tread surface.
Special Project Specification. Specifications that detail the conditions and requirements peculiar to an individual project, including additions and revisions to the standard specifications.
Surfacing. Material placed on top of the trailbed that provides the desired tread.
Suitable Material. Rock that can be accommodated in the trail structure, and soil free of duff with a recognizable granular texture.
Switchback. A reverse in direction of trail grade with a level landing used to change elevation on a steep slope, usually involving special treatment of the approaches, barriers, and drainages.
Trailbed. The finished surface on which base course or surfacing may be constructed. For trails without surfacing the trailbed is the tread.
Trailway. The portion of the trail within the limits of the excavation and embankment.
Tread. The surface portion of the trail upon which traffic moves.
Turnout. A short section of extra trail width to provide for passage of trail users.
Waterbar. A structure used for turning water off the trail, usually made of logs or stones.
Water Courses. Any natural or constructed channel where water naturally flows or will collect and flow during spring runoff, rainstorms, etc.
Section 903—Intent of Contract
903.01 Intent. The intent is to provide for the completion of the project described in the contract. Furnish all labor, materials, equipment, tools, transportation, utilities, and supplies, and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.
The project site has no available utilities.
Camping is allowed in approved locations. The Cascade Creek Cabin is available for rent under the same rules as those that apply to the general public, see www.recreation.gov. Coordinate with the CO for permission to use approved areas for camping and staging. Meet the requirements of Section H, Use of Premises.
The use of helicopters in the project area is allowed.
Section 904—Maintenance for Traffic
904.01 General. Before any suspension of work, take precautions necessary to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections, and make provisions for normal drainage and to minimize erosion.
The Cascade Creek Trail will remain open to the public during construction activities except during helicopter operations over the trail, blasting operations, or while construction hazards are present. Provide a notification of closure times to the COR 10 days prior to the closure. During closures, provide a professional-appearing “Trail Closed” sign and barriers at the trailhead and provide verbal warnings to the public when the trail and staging area are closed.
Section 905—Control of Materials
905.01 Handling Materials. Transport, handle and store all materials to preserve their quality and fitness for the work. Stockpile, load, and transport aggregates in a manner that will preserve specified gradation and avoid contamination.
Locate stored materials to facilitate their prompt inspection. Arrangements for storage in other than designated sites are the responsibility of the contractor.
Section 906—Measurement and Payment
906.01 General. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental and included in the payment of the PAY ITEMS in the SCHEDULE OF ITEMS.
906.02 Determination of Quantities. The following measurements and calculations are to be used to determine contract quantities for payment:
Measure Aggregate Surfacing (AS), Stone Pitching (SP), and Boardwalk (BW) in Linear Feet.
Measure Bedrock Removal (BR) as a Lump Sum.
Measure Stone Riser Steps (SRS), Step Stones (SS), and Stone Open Drain (SOD) as Each. Note that the Aggregate Surfacing material used in the construction of these items will be incidental to these items and no additional payment will be made.
Measure Stone Pitching in linear feet measured along the centerline and parallel to the specified grade.
Note that the Aggregate Surfacing material used in the construction of this item will be incidental to these items and no additional payment will be made.
Measure Rest Area as Lump Sum. Note that benches, stone work, aggregate surfacing and other work shown on the Rest Area site plans will be incidental to the Rest Area and no additional payment will be made, except for work items found in the trail log, which shall be paid according to the requirements in Section 906 for that pay item.
Measure Laborer Work, as hours, Each. One hour is one unit.
Measure Bridge replacement and related work as Lump Sum. This items includes all work related to the demolition of the existing bridge, the new bridge and related decks and stairs, handrails, guardrails, etc.
Miscellaneous Work will be incidental to other work items and no additional payment will be made for it.
Manufacturer’s tolerances will be accepted unless controlled by tolerances in the cited specifications.
906.03 Units of Measurement. Payment will be made by units defined and determined according to standard measure and by the following:
(a) Each (EA). One complete unit, which may consist of one or more parts.
(b) Lump Sum (LSQ). The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
(c) Linear Feet (LF). Measurement in feet taken along the centerline of the trail and parallel to the finished grade.
(d) Square Feet (SF). Measurement taken by determining surface area.
906.04 Methods of Measurement. One of the following methods of measurement for determining final payment is DESIGNATED ON THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Designed Quantities. These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project.
Original design data include the preliminary survey information, design assumptions, calculations, and drawings. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under the following conditions:
(1) As a result of changes in the work approved by the CO.
(2) As a result of the CO determining that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) As a result of the contractor submitting to the CO a written request showing evidence of errors in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
(b) Actual Quantities (AQ). These quantities are determined from measurement of completed work or certified receipts.
(c) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles. Aggregate woven bags are considered hauling vehicles.
Section 907—Quality Assurance and Quantity Measurement
Description
907.01 Work. Work consists of providing certification that the quality and quantity of construction conform to the drawings, specifications, and requirements of the contract.
Construction
907.02 Representative Samples. At approved locations, prepare a 10 linear foot representative sample of Stone Pitching (SP), Aggregate Surfacing (AS), and Solid Rock Removal (SRR) full bench and two SRR steps, and three representative Stone Riser Step (SRS),. The representative samples will serve as a standard of workmanship and materials for other work on the project. Obtain review of the representative samples, correct any deficiencies, and obtain final approval before proceeding. When accepted, the sample will be incorporated into the work.
907.03 Certification and Measurements
a) Offsite-Produced Materials. Furnish signed certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite-produced materials incorporated in the work meet applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Furnish a certificate for each commodity or invoice.
(b) Quantity Measurements. Submit quantities to the CO for periodic progress payments, and the CO will compute payments. Quantities are subject to verification.
Section 911—Clearing and Grubbing
911.01 Work. Work consists of clearing, grubbing, trimming, removing, and treating trees, logs, limbs, branches, brush, plants, and other vegetation within the clearing limits. Also included are the protection from injury or defacement of trees and other objects not designated for removal and the treatment of damaged trees.
Construction
911.02 Clearing Limits. Clear brush to the dimensions 36 inches each side of the trail centerline. Clear trees designated to be removed within 36” of trail centerline.
911.03 Material to Be Cleared. Remove and dispose of trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits, except for live brush, herbaceous plants, and trees between the trailway and clearing limits that are less than 12 inches in height and less than ½ inch diameter at ground line.
Except as provided above, cut all limbs and branches within 7 feet of the ground and more than 1/2 inch in diameter that extend into the clearing limits. Cut tree limbs flush with the outside of the branch collar, and cut brush at the ground surface.
911.04 Damaged Trees. When felling, cutting, or trimming, do not cause bark damage to standing timber.
If damage does occur to standing trees, treat the injured trees in an approved manner. Remove and dispose of trees with major roots exposed by construction that are rendered unstable as approved.
911.05 Disposal of Clearing Slash, Logs, Stumps, Brush, and Roots. Limb all felled trees to a 4 inch diameter top, including designated trees outside the clearing limits.
Place all products of clearing and grubbing in approved locations outside the clearing limits and out of sight of the trail as approved.
Do not place clearing and grubbing debris in water courses, snow ponds, lakes, meadows, or in locations where it could impede the flows to, through, or from drainage structures.
Section 912—Excavation and Embankment
912.01 Work. Work consists of the excavation and placement of excavated material, regardless of its nature, from within the trailway or from other sources, except for Bedrock Removal which is included under other pay items SHOWN IN THE SCHEDULE OF ITEMS.
Includes excavation, embankment, and backfill construction required to shape and finish the trailbed, ditches, backslopes, and fill slopes.
912.02 Trail Segment Construction Meetings. Prior to beginning excavation and embankment activities for each 1000-foot-long trail segment, hold an on-the-ground meeting with the Government Representative to discuss particulars such as grading, drainage, waste disposal, and any other construction issues.
912.03 Use and Disposal of Excavated Material.
Conserve and use soil and herbaceous vegetation and moss removed during excavation to revegetate excavated areas to provide a neat appearance and to control erosion. For soil placed on slope shoulders for Types AS, use soil that is free of debris larger than 2” in any dimension.
Place excess and unsuitable excavation beyond the downslope edge of the trailbed, except in locations where the material would be placed within 5’ of a stream or in staked locations where it is desirable not to impact the native vegetation; in these locations place in approved locations. Do not obstruct drainage and spread to a depth not exceeding 4 inches. This includes any material removed in the grubbing operation and deposited in the same area.
Place rocks over 4 inches in greatest dimension not used in construction out of sight on the downslope side. Place rocks so that the tops are at least 6 inches lower than the trailbed surface. Ensure that no blockage of drainage or creation of a windrow effect occurs.
912.04 Trailbed Preparation. Remove organic soil to the depth required to accommodate the aggregate surfacing and provide the finished grades specified on the drawings. Retain and protect from damage roots over 2” diameter except where approved.
912.05 Trailbed Approval. Obtain approval of trailbed prior to placing the following: aggregate surfacing, stone riser steps, stone pitching, step stones.
912.06 Cut and Fill Slopes Construct trail so cut and fill slopes are less than the angle of repose. Trim exposed roots flush with the finished cut slope.
Section 930— Solid Rock Removal
930.01 Work. Work consists creating a trail surface from sloping solid rock and creating “steps” in a steep rock face.
The work also includes mucking out the excavated area and finishing the surfaces to provide a finished trail surface and backwall.
Material
930.02 Regulations. If blasting is the chosen method, Sections 930.02 through 930.06 shall apply. Only use explosives and initiating devices less than 1-year old. Explosives and initiating devices include, but are not necessarily limited to, dynamite and other high explosives, slurries, water gels, emulsions, blasting agents, initiating explosives, detonators, and detonating cord.
Construction
930.03 Regulations. Furnish copies or other proof of all-applicable permits and licenses. Comply with Federal, State, and local regulations on the purchase, transportation, storage, and use of explosive material. Federal regulations include the following:
a). Safety and health: OSHA,29 CFR Part 1926, Subpart U.
b). Storage, security, and accountability: Bureau of Alcohol, Tobacco, and Firearms (BATF), 27 CFR Part 181.
c). Shipment: DOT, 49 CFR Parts 171-179, 390-397
930.04 Blaster-in-Charge. Designate in writing a blaster-in-charge. Submit evidence that the blaster-in-charge has a valid State blaster’s license or other license accepted by the State where the project is located and issued by an equivalent licensing body for the type of blasting required.
930.05 Blasting Plans. Blasting plans are for quality control and record keeping purposes and are to be signed by the blaster-in-charge. The review and acceptance of blasting plans does not relieve the Contractor of the responsibility for using existing drilling and blasting technology, and for obtaining the required results.
Do not deliver explosives to the project until the general blasting plan is accepted.
a). General blasting plan. Submit a general blasting plan for acceptance at least 14 days before drilling operations begin. Include, as a minimum, the following safety and procedural details:
1). Working procedures, and safety precautions for storing, transporting, handling, and detonating explosives.
2). Proposed product election for both dry and wet holes. Furnish Manufacturer’s Material Data Sheets for all explosives, primers, initiators, and other blasting devices.
3). Typical plan and section views for both production and controlled blasting, including maximum length of the shot, burden, hole spacing, hole inclination, hole depth, hole diameter, subdrill depth, and powder factor.
4). Proposed initiation and delay methods and delay times.
930.06 Blasting. Drill and blast according to the blasting plan.
Cap all holes to prevent unwanted backfill. Place a stake next to each hole with hole number and total depth drilled.
Use the types of explosives and blasting accessories necessary to obtain the required results. A bottom charge may be larger than the line charges if no overbreak results.
Free blast holes of obstructions for their entire depth. Place charges without caving the blast hole walls.
Stem the upper portion of all blast holes with dry sand or other suitable granular material. Do not stem hole with drill cuttings.
Following a blast, stop work in the entire blast area, and check for misfires before allowing worker to return to excavate the rock.
Remove all cut face rock that is loose, hanging, or potentially dangerous. Scale by hand or machine methods as approved by the CO. Leave minor irregularities or surface variations in place if they do not create a hazard. Drill the next lift only after the cleanup work and stabilization work is complete.
If blasting operations cause fracturing of the final rock face, repair or stabilize it in an approved matter at no cost to the Government. Repair or stabilization may include removal, rock bolting, rock dowels, or other stabilization techniques.
Halt blasting operations when any of the following occur and perform additional test blast:
1). Slopes are unstable;
2). Slopes exceed tolerances or overhangs are created;
3). Backslope damage occurs;
4). Safety of the public is jeopardized;
5). Property or natural features are endangered;
6). Fly rock is generated;
7). Excessive ground or airblast vibrations occur in an area where damage to buildings, structures, or utilities is possible.
930.07 Solid Rock Removal Full Bench Tread Finish. Provide a uniform tread surface that is free draining and does not deviate vertically more than 1 inch from a straight edge placed in any direction on the finished rock surface. Treat surface to remove tool marks and provide a natural appearing surface, as approved.
930.08 Solid Rock Step. Location and size of steps to be marked by Government, minimum depth 5”.
Tread finish same as for Section 930.07.
930.09 Drainage Dip. Where shown in trail log and at other locations where the trail crosses perennial or intermittent water drainages and seeps, provide a drainage dip in the trail tread to channel water cleanly across the trail as approved. Dips to be of a size and shape to carry water across trail without creating undue walking hazard.
Section 932—Boardwalk
932.01 Work. Work consists of salvaging and disposing of existing boardwalk materials, constructing boardwalk and installing net non-skid material.
Materials
932.02 Lumber. Use salvaged yellow cedar lumber from the project site. Salvage the best grade of boardwalk in the most suitable lengths for reuse in the new boardwalk to be constructed under this contract. Remove metal fasteners from all boardwalk and dispose offsite. Place boardwalk lumber not to be salvaged in locations out of sight of the trail where approved.
932.03 Nails. Provide stainless steel, Grade 304, annular ring shank nails.
932.04 Net Non-Skid Surface. Use nylon salmon seine net, 3-1/4"x #60 100MD DB&T BRD, as available from Seattle Marine, 1-800--426-2783 or 206-285-5010, Attn: Mike Nord, or approved equal.
932.05 General. Predrill holes for fasteners when necessary to prevent splitting and drive spikes flush.
932.06 Mud Sills. Bury mud sills and stringers to a depth that provides a finished walking surface that is less than or equal to 4” above general profile of the surrounding ground. Do not level the top surfaces of stringers by shimming or notching.
932.07 Net Non-Skid Surface. Cover all boardwalk surfaces and steps. Attach with ½” Arrow stainless steel or monel rusproof staples, 6” o.c. Stretch net over sides and stable to sides/end and on surface of planks to securely hold down net and provide a neat appearance.
Section 941—Aggregate and Stone Construction
941.01 Work. This work consists of preparing the trailbed and furnishing, hauling, and placing Aggregate Surfacing (Type AS), Stone Pitching (Type SP), Step Stone (SS), Stone Open Drain (SOD), Stone Riser Step (SRS), and Stone Retaining Wall (SRW).
Materials
941.02 Handling Materials. Stockpile, remove, transport, and spread aggregates in a manner that will preserve specified gradation and avoid contamination.
941.03 Aggregate Surfacing and bedding material. Provide aggregate surfacing meeting the specification Subbase B (1-1/2” minus crushed rock) in the FP03 Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects.
941.04 Seed-Free Aggregate and Stone. Provide aggregate and stone materials that are free of viable seeds or vegetative material. Ensure that contamination does not occur from equipment and tools used to handle aggregate and stone or to construct trail. Prior to moving equipment to worksite, thoroughly wash all equipment and tools that will be used at the work site, to remove all soil, debris, and other material that could contain seed or vegetative material. Use only aggregate and stone from an active stockpile or other source that is approved by the CO as being weed free. Provide notification one week before moving material from the source facility to allow inspection. Do not place any material on site that has soil, debris, or any substance adhered to it that could contain seed or vegetative matter from an offsite location.
941.05 Required Stone Sizes and Shapes. Hand select native or provided stones to provide the general shape and dimensions shown on the drawings. Stones to be sound and durable.
Select stone that meets the following size and shape requirements:
Stone Riser Step (SRS)
• 2.5 cubic feet minimum volume
• Construct steps primarily from single stones, however two stones may be used if fit tightly together and are 1.5 cubic foot min. size.
• A shape suitable for constructing a stable step
• A generally flat top surface suitable for a 8” min. step depth; step width as shown in drawings.
Step Stone (SS)
• 2.5 cubic feet minimum volume
• Construct step stones from single stones only.
• A shape suitable for constructing a stable step stone.
• 2.25 square feet minimum flat top step surface.
Stone Pitching (SP) surfacing
• 0.3 cubic foot minimum volume
• 4” min. thickness over at least 2/3 of the stone’s area
• A generally flat top surface that is suitable for a walking surface
Stone Pitching (SP) Riser Stones
• 1.5 cubic foot minimum volume, unless approved by COR. Construct steps primarily from single stones, however two stones may be used if fit tightly together and are .75 cubic foot min. size.
• A shape suitable for constructing a stable step
• A generally flat top surface suitable for a 6” min. step depth.
Stone Pitching (SP) Gargoyles
• 2 cubic foot minimum volume
Stone Open Drain (SOD) Side Stones
• 3 cubic foot minimum volume
• 36 inches minimum length
• 12 inches minimum width
• 14 inches minimum height
• Select stones for fit and a generally flat top surface for stepping on.
Stone Retaining Wall (SRW)
• 1.5 cubic foot minimum volume for capstones and foundation stones
• 1 cubic foot minimum volume for stones other than capstones and foundation stones
• Select and place stones for reasonably tight fit against each other
Stone Bench (for Rest Areas)
• 3 cubic foot minimum volume
• 1.5 square foot minimum flat seat area
• May be made from a single or multiple stones meeting the minimum size requirements
• Height of flat seat area above top of aggregate surfacing: 18” ± 1”
• Select and place stones for reasonably flat top for seating and reasonably tight fit against each other
Flagstones
• 36” minimum length
• 18” minimum width
• 4” minimal thickness
• Each flagstone to be from a single stone.
• Select and place stones for reasonably tight fit against each other and a generally flat top surface for stepping on.
Gargoyles
• 15” minimum height above ground in finished installation
• 12” minimum average width and thickness
• Each gargoyle to be from a single stone.
• Select shape for appearance as approved.
941.06 Trailbed Preparation and Approval. See Specification 912.03.
941.07 Stone Retaining Wall (SRW). Prepare bench for bearing foundation stones as shown on the drawings; break out bedrock if encountered. Obtain approval of bench before placing stone. Place largest stones at bottom of wall as foundation stones.
Place stones with flat side down, use a minimum amount of chinking to prepare a flat surface for the next course above, using the largest and best shape chinking practical. Stagger vertical joints 6” minimum.
Select and place capstones to be entirely stable when walked on.
941.08 Rest Areas. Install as shown in drawings and as staked by government. Remove all organic material down to underlying mineral soil or gravel prior to placement of aggregate surfacing.
941.09 Stone Pitching (SP). Install gargoyles at ends of pitching sections, and other locations as staked by government. Gargoyles are stones which protrude above the plane of the pitching to funnel users onto the structure. On sections of pitching at least 30 linear feet (continuous) or longer, install gargoyles every 15-20 feet.
941.10 Handling of Aggregate. Contain aggregate in woven bags until it is installed on the trail. Do not place aggregate directly on the ground outside of the trailway without a tarp or some other means of separation.
941.11 Compaction and Finished Grading. For Aggregate Surfacing (AS), compact firmly by hand.
Slope surface to drain, grade not to exceed 3%. Following final spreading, smoothing and compaction, correct any irregularities or depressions that develop by adding or removing material until the surface is smooth and uniform.
941.12 Acceptance, Testing, Sampling, and Tolerances. Provide the minimum compacted thickness of aggregate surfacing shown in the Trail Log. If excess aggregate has been delivered to the work area it may be stockpiled in approved locations or spread evenly over the trail; the method to be approved by and at no cost to the Government.
Do not vary the aggregate width by more than ± 1 inch from the specified width or place it consistently narrower or wider than the specified width, except as SHOWN ON THE DRAWINGS.
Section 951—Mobilization
951.01 Work. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.
Payment
951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE
SCHEDULE OF ITEMS.
Make progress payments for mobilization as follows:
(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.
(b) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.
(c) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.
(d) Pay any unpaid amount for mobilization upon final acceptance of all work items.
Section 956—Miscellaneous Work
956.01 Work. This work consists of Laborer Work and Miscellaneous Work (MW) work items as described below.
956.02 Miscellaneous Work (MW). Construct as shown in the Trail Log.
956.03 Laborer work. Provide one laborer with typical trail tools to perform work as identified by the COR that is not included under other work items.
Section 959 –Boulder Overlook Handrail and Eye Nut at STA 20+49
959.01 Work. The work consists of furnishing, fabricating and installing the handrail on the boulder overlook and installing a rope on the Solid Rock Removal section.
Materials
959.02 Anchors. Provide the following anchors manufactured by Williams Form Engineering, Corp.
http://www.williamsform.com/: the S-7 Reusable Concrete Anchor System consisting of the S-7 Type A Anchor Studs paired with the ¾” OD x 7” long (S7U-3041-06) Stainless S-7 Reusable Concrete Anchors, ASTM A193 (304) B8 Class 1, for both the boulder overlook handrail and for the rope anchor. Prestress anchors as per manufacturer’s recommendations.
959.03 Flat Bar. Provide T-304 Stainless Steel. Use ¾” x 4” bar for all posts.
959.04 Cable guardrail: Provide all items associated with the guardrail (except guardrail flat bar posts) to include all cable, fittings, and other items in 316 Stainless Steel as provided by Hayn Enterprises, LLC (www.hayn.com). Provide 3/8” cable for top cable and 5/16” cable for lower cables. Provide Closed Tubular Turnbuckles TT Series – T Toggle Assemblies: # 58TTS516 and #56TTS38 where necessary to provide adequate tensioning.
Provide a submittal from Hayn Enterprises, LLC showing: 1): a proposed tensioning scheme for the cable that will provide 300 lbs min., 400 lb max. pre-tension, 2): a tubular guide or other method of securing the cable to the flat bar posts at each intersection, 3): a means of connecting the turnbuckle jaw to the flat bar end post.
959.05 Eye Nut. Provide Model # NEB-50 eye nut manufactured by Williams Form Engineering, Corp.
http://www.williamsform.com/
Construction
959.05 Surface Preparation. Thoroughly clean and abrade bedrock surfaces. Where necessary to obtain consistent bearing for flat bar against the stone, mill the stone for a good fit. Only remove stone material at points of contact with the flat bar, do not mar the stone surface at other locations.
959.06 Anchors. Install per manufacturer’s installation recommendations. Provide installation recommendations for approval recommendations prior to installation. Use manufacturer supplied setting tool.
959.07 Flat Bar Posts. Install flat bar posts at locations shown on the drawing and as needed to follow the contour of the boulder as approved. Provide a templet onsite showing the proposed fit of the flat bar to the stone and the post prior and obtain approval prior to fabrication.
Individually bend flat bar posts to closely follow the contour of the stone and provide a plumb post installation.
Install stone anchors no more than 15” and no less than 9” apart at points of firm contact between the flat bar and the stone.
Place anchors so studs do not extend more than 3/8” beyond the nut on the finished installation.
Finish tops of strap to a 1/8” radius on corners and round over edges for smooth feel.
Install braces in four locations at front and rear corners of the boulder as approved. Weld braces to flat bar posts.
http://www.williamsform.com/ http://www.hayn.com/ http://www.williamsform.com/
959.08 Eye nut. Place anchor for eye nut installation at location described at STA 20+49. Install anchor at proper depth in rock so eye nut is tight against rock when fully threaded onto stud. Install “permanent” grade Loc-Tite on threads.
Drawings – Cascade Creek Trail Improvement Stewardship
Appendix D
4/17/2015
Map – Cascade Creek Trail Improvement Stewardship
Attachment 1
3/19/2015
Cascade Creek Trail Reconstruction
TRAIL LOG
KEY TO WORK ITEMS:
ABBREV. DESCRIPTION
AS AGGREGATE SURFACING
BW BOARDWALK
SP STONE PITCHING
SRS STONE RISER STEP
SOD STONE OPEN DRAIN
SRW STONE RETAINING WALL
MW MISCELLANEOUS WORK
NW NO WORK
SRR SOLID ROCK REMOVAL
REST
AREA
REST AREA
SIGN-
POST
SIGNPOST
GENERAL NOTES
1). The beginning of work areas are marked on the ground by wood stakes with the work area number written upon them. Leave all stakes in place until such time that the work is accepted by the Government.
If a stake location interferes with construction activities, relocate the stake in a visible location 90 degrees to the trail centerline and outside the construction limits.
Should a stake be missing, notify the Government for replacement prior to the commencement of work in that area.
2). The work areas value shown is approximate feet from the beginning of the project or as referenced.
3). The Minimum Aggregate Surfacing Depth shown is the depth after placement and light compaction.
4). The quantities of steps/stones shown for Types SRS are estimates given for the contractor's convenience only. The actual quantities may vary and the contractor is responsible for verifying the actual quantities.
WORK
AREA
BEGIN
DIST.
AHEAD QUAN.
WORK
AREA
END
WORK
ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
EST. NO.
OF SRS
FINISHED CL
% GRADE
AHEAD
NOTES
0 40 40 AS 6 See Rest Area 1 site plan for trail location on this segment.
0 10 7 10 SRS 0 7 27
Trailhead to be relocated to south of existing trailhead near large boulder at 0+00 as staked. New beginning of trail will be at base of 12'x12'x7'H boulder at top of fine gravel beach. 0+00 is at downhill corner, north side of boulder where beach grass begins. Place steps along north side of boulder. (See also Rest Area #1 site plan.) Sta. 0+10 located at N57° 00.151', W132° 46.961'.
10 18 18 28 AS 6 18
28 12 0 40 Rest Area #1 See Rest Area #1 site plan drawing for layout. Work to be paid for Rest Area #1 includes all items shown on the Site Plan that are not in the Trail Log. Sta. 0+40 located at north end of Rest Area 1. Install double sign-posts where staked for future sign to be installed by Gov't.
40 140 140 180 AS 4 2
180 2 1 182 SOD
182 34 34 214 AS 4 5
214 132 132 346 AS 6 varies Enter woods at 2+14. Remove larger rocks & roots that would protrude above finished grade.
340 6 0 346 MW - In area of 3+40 cut out large down spruce log to straighten trail alignment, creating a gentle curve through area. Remove log pieces as marked and dispose out of site from trail.
346 76 76 422 AS 6 15 max Beginning of existing 2"x12" AYC boardwalk on spruce round sills. Demolish boardwalk to end of trail type at Sta.7+12 (approx. 438').
422 12 12 434 SP - -35 Remove existing stair
434 37 37 471 AS 12 4
471 42 42 513 SP - 30
513 78 78 591 AS 6 15 max 591 2 1 593 SOD - Contruct SOD with approx. 24" gap at top.
593 87 87 680 AS 6 20 max
680 12 5 692 SRS 0 5 30
692 42 42 734 AS 6 8 Boardwalk trail "Y"s at 6+92; demolish both stretches of boardwalk. Install AS6 to edge of Rest Area 2 at Sta. 7+12.
712 1 Rest Area #2 See Rest Area #2 site plan drawing for layout. Work to be paid for Rest Area #2 includes all items shown on the Site Plan that are not in the Trail Log.
0 15 15 15 AS 6 Spur trail between aggregate pads.
734 22 22 756 AS 6 10 Use boulder at 7+34 as step.
BEGIN
DIST.
AHEAD QUAN.
WORK
AREA
END
WORK
ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
EST. NO.
OF SRS
FINISHED CL
% GRADE
AHEAD
NOTES
756 55 55 811 SP - ~ 35
811 55 5 866 SRS 0 5 20
866 58 34 924 SRS 0 34 60
924 12 12 936 SP - 35 Place rock between roots as approved.
936 12 12 948 AS 6 5
948 5 5 953 SRS - 3 Remove roots
953 30 30 983 AS 3 7 5
983 38 38 1021 SRS 20
1021 25 25 1046 AS 6
1046 36 36 1082 SRS 13 32 Remove existing log stair at 10+64 and all boardwalk on bench above. Remove boardwalk at top of stair for approx. 360'.
1082 31 31 1113 AS 6 16 Follow roughed-in full bench. Remove stone at 11+02. Install retainer log where staked.
1113 8 8 1121 SRS 4
1121 19 19 1140 AS 3 Keep existing SOD @ 11+26 free of debris.
1140 10 10 1150 SRS 6 7 <10 Tie into route of demolished BW
1150 243 243 1378 AS 8 At approx. 11+57 cut through knob and fill hole. At approx 12+27 cut into knob to right of boulder
1378 3 3 1381 SRS 3 Use root as top step.
1381 58 58 1439 AS 6 <10
1439 1561 See bridge drawings
1561 15 0 1576 NW Beginning of "Upper Trail." Existing BW to remain.
1576 11 0 1587 NW Existing AS & steps cut into bedrock.
BEGIN
DIST.
AHEAD QUAN.
WORK
AREA
END
WORK
ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
EST. NO.
OF SRS
FINISHED CL
% GRADE
AHEAD
NOTES
1587 54 12 1641 SRS 0 12 ~ 25
1641 17 17 1658 AS 8 -4
1658 30 30 1688 AS 6 -10 Begin reroute to right at 16+58. Block existing trail to hiker use as approved by COR.
1688 12 12 1700 AS 6 9 On reroute; rejoin existing trail at 17+00. Block existing route to hiker use as approved by COR.
1700 11 11 1711 AS 6 0
1711 5 0 1716 NW Existing steps cut into bedrock 1716 15 15 1731 AS 10 -4 17+31 is at toe of slope 5' to left of existing boardwalk.
1731 2 1 1733 SOD -
1733 13 13 1746 AS 10 8 Reroute crosses existing boardwalk to right side and continue
1746 14 14 1760 AS 10 3
1760 27 27 1787 BW - 0 Follow centerline of stakes.
1787 18 18 1805 BW - 5
1805 14 14 1819 AS 6 8
1819 8 4 1827 SRS 0 4 30
1827 50 50 1877 BW - 5
1877 47 47 1924 BW - 5 Begin reroute to left at 18+77. Block abandoned trail to hiker use as approved by COR.
1924 27 27 1951 AS 8 10 Cross existing trail at 19+51; block abandoned trail to hiker use as approved by COR.
1951 1 Rest Area #3 See Rest Area #3 Site Plan for layout. Work to be paid for Rest Area #3 includes all items shown on the Site Plan that are not in the Trail Log.
1951 16 16 1988 SP - 15
1988 3 3 1991 NW 0 Leave existing stones 1991 7 7 1998 SP STA 19+98 is at base of stone face.
1998 30 30 1941 SRR - Cut or improve approx. 5 steps in bedrock where marked.
1941 17 1 2041 SRR - 60 Cut or improve 10 steps in bedrock where marked.
2041 7 1 2048 SRR - 60 Cut 6 steps in bedrock straight up smooth bedrock face where marked. Remove existing pinned step.
2048 28 1 2066 SRR Follow bedrock ridge to left of muddy trail. Break 3 steps where marked in first 12' of station. SRR for full bench trail through remaining 16' of station. Additional misc work within this section as follows:
BEGIN
DIST.
AHEAD QUAN.
WORK
AREA
END
WORK
ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
EST. NO.
OF SRS
FINISHED CL
% GRADE
AHEAD
NOTES
2049 0 1 2049 MW
Install anchor and eye nut where marked at knob in high point of bedrock, 10' to left of Sta 20+49. Attach stainless steel thimble to eye nut, and splice rope tightly onto thimble so thimble protects rope from fraying against eye nut; 4"-6" splice length. Rope to be 3/4" Dymax or approved equal. Provide knots of approved size and type at 14" intervals. Finished length sufficient to reach bottom of steep rock face after knotting, approx. 45'.
2066 0 1 2066 MW Ditch 25' downhill away from trail to daylight.
2066 13 1 2079 SRR Remove duff, break 2 steps into bedrock at beginning of work area where marked; SRR through remainder of work area to provide full bench trail surface.
2079 2 1 2089 SOD - Entering 1998 blowdown. At 20+81 ditch 15' uphill to catch all water heading down bedrock.
2089 5 5 2094 AS 4 0
2094 3 3 2097 SRS 0 3 -
2097 16 1 2113 SRR - 10 Full bench trail.
2113 15 15 2128 AS 6 7
2128 20 1 2148 SRR 12 Full bench trail; remove duff and stump; locate so work area ends above bedrock slope at 21+48.
2148 5 3 2158 SRS 0 3 50 Remove bottom root & stone; install 3 SRS to large root at top; keep this root & backfill as step.
2158 3 3 2161 AS 6 8
2161 2 2 2167 SS Install 2 Step Stones, leave large stone in middle.
2167 58 10 2225 SRS 0 10 22
Remove double stump at 21+69; remove all wood, duff, roots, etc. down to bedrock and daylight trail the entire length of work area for Gov't to mark step & bedrock removal locations; 10 SRS for estimating purposes.
2225 11 1 2236 SRR 37 Cut 5 steps into bedrock where marked.
2236 6 6 2242 AS 6 5 or 0?
2242 30 1 2272 SRR 0 6 33 Remove duff, logs, roots, etc to bedrock through entire work area for Gov't to mark step locations;
approx. 6 steps needed.
2272 7 1 2279 SRR 60 Improve 2 existing steps and install 2 additional steps in bedrock.
2279 23 1 2302 MW - Clean bedrock to remove muck.
2302 24 1 2326 MW 5 Remove stump at beginning of work area and widen path on top of bedrock to 24" throughout work area.
2326 15 1 2341 SRR 0 Remove all wood, duff, roots, etc. down to bedrock and daylight trail the entire length of work area for Gov't to mark location for full bench trail surface. Clear open drain below.
BEGIN
DIST.
AHEAD QUAN.
WORK
AREA
END
WORK
ITEMS
MIN. AGGR.
SURFACING
DEPTH
(INCHES)
EST. NO.
OF SRS
FINISHED CL
% GRADE
AHEAD
NOTES
2341 22 1 2363 SRR - Cut 3 steps at beginning of work area; full bench trail remainder of work area.
2363 7 2 2370 SRS 0 2 - Remove boulder at 23+63; construct 2 SRS onto large flat-top boulder at 23+70.
2370 7 0 2377 NW - On top of large boulder.
2377 23 23 2400 AS 6 0 Remove stump blowdown and grade out using boulders for base course to provide 0% finished grade.
2400 34 34 2434 AS 6 8 Follow left path on uphill side of large boulder at 24+25 through narrow gap.
2434 20 1 2454 MW 53 Cut approximately 10 steps into bedrock; pull over 20" Hemlock with rootwad at 24+54 to expose rock below.
2454 8 1 2462 MW -12 Cut 24" full bench.
2462 22 22 2484 AS 6 -10 Pull over 24" Hemlock with rootwad; begin reroute to left; fill and break rock to provide 10% max grade through station. Block hiker access to abandoned trail route as approved.
2484 18 18 2502 AS 8 0
2502 15 15 2517 AS 8 2
2517 42 42 2559 AS 10 12 Begin to follow cliff wall; place trail along cliff so inside edge is 3' from base of cliff; do not disturb vegetation between trail and cliff.
2559 8 8 2567 SRS 0 8 55 Place steps against cliff face; remove duff to bedrock at 25+67.
2567 2 1 2569 SOD -
2569 23 23 2592 AS 10 -7 Bench into slope at beginning of work area to stay away from stream.
2592 19 19 2611 AS 10 15
2611 37 37 2348 AS 10 11 Leave cliff to right; break boulders between 26+28 and 26+37, and use rock for fill in low spots; pass between 2 boulders at 23+46 in field. Remove large down tree.
2348 19 19 2367 AS 6 2 Rejoin existing trail at 23+67. Block hiker access to abandoned trail route as approved.
2367 16 16 2383 AS 6 10
2383 11 6 2394 SRS 0 6 35
2394 8 8 2402 AS 6 0
2402 8 1 2410 SRR 45 Cut 5 steps into bedrock.
2410 28 28 2438 AS 10 17 Begin reroute/spur to right at 24+10.
2438 18 18 2456 AS 10 10 Cut out down logs for 10% grade.
2456 28 28 2484 AS 10 0 Place 2 each 3cf barrier stones where staked; follow centerline of stakes.
2484 1 2501 Rest Area #4 See Rest Area #4 Site Plan for layout. Work to be paid for Rest Area #4 includes all items shown on the Site Plan that are not in the Trail Log. Trail between 24+84 and rest area to be staked after SRW placement.
EXPERIENCE AND CAPABILITY QUESTIONNAIRE -- OMB Clearance Number 9000-0142 Instructions: See Box 10, REMARKS, if extra space is needed to answer any items below. Mark "X" in the appropriate boxes. Please list NA for inapplicable items. Offerer should copy if extra space needed or in another format provide identical information.
1. Contractor's Name, Address & Telephone Number 2. Type of Business
____ Company
____ Corporation
____ Non-profit Organization
____ Co-partner
____ Individual
3. How many years of experience do you have in this line of work? ___________________
4. How many years of experience as a prime contractor? _________ subcontractor? ________
5. List the projects your business has completed in the last 3 years.
Contract
Amount
Type of Project Date
Completed
Name and Telephone Number to Contact
For Information
6. List all of your firm's current contract commitments.
Contract
Number
Contract
Amount
Type of Project Est. Date of
Completion
Name and Telephone Number to
Contact For Information
7a. Have you ever failed to complete any work awarded to you? ____ yes ____ no
7b. Has work ever been completed by performance bond? ____ yes ____ no
7c. If "yes" to either Question 7a. or 7b., please specify location(s) and reason(s):
EXPERIENCE AND CAPABILITY QUESTIONNAIRE -- OMB Clearance Number 9000-0142
8. Organization that will be available for this project:
a. Minimum No. of employees: _______________ Maximum No. of employees:
b. Are employees regularly on your payroll? ____ yes ____ no
c. If applicable, specify equipment available for this contract:
d. If applicable, estimate rate of progress (such as 2.0 acres per day):
Minimum progress rate: __________________________ Maximum progress rate:
9. List the experience of the principal individuals of your business.
Individual's Name Present Position Years Experience Type of Work
10. Remarks:
CERTIFICATION: I certify that all of the statements made above are complete and correct to the best of my knowledge and that ny persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.
Signature Title Date
General Decision Number: AK150007 01/02/2015 AK7
Superseded General Decision Number: AK20140007
State: Alaska
Construction Type: Highway
Counties: Alaska Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015.