REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ X IS IS NOT A SMALL BUSINESS SET- ASIDE 1 30
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
AG-0116-S-11-0044 Feb 11, 2011 496217 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Tongass National Forest, 123 Scow Bay Loop Road, PO Box 309, Petersburg, AK 99833, FAX (907)772-5894, Email kimtoland@fs.fed.us
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Kim Toland (907) 772-5804 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5a. This request does not commit the Government to pay any costs incurred in the preparation of the
March 18, 2011 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(a) (b) (c) (d) (e) (f) Anan Trail Enhancement
Small Business Set-Aside
1. Responses to this solicitation can be mailed or hand carried, faxed or emailed to address listed in Item 5a above.
Enter Prices on Schedule of Items
2. If contract award exceeds $30,000 then Alternative Payment Protections must be submitted in accordance with FAR clause 52.228-13.
3. Prospective contractors shall complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration in the Central Contractor Registration (CCR) database.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR
DAYS (%)
c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AG-0116-S-11-0044 Anan Trail Enhancements Page 2 of 30
PART I—THE SCHEDULE
SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Anan Trail Enhancements
Wrangell Ranger District, Tongass National Forest
ITEM
NO.
DESCRIPTION
Meth.of Meas.
UNIT OF
ISSUE
EST.
QTY.
UNIT PRICE TOTAL
AMOUNT
01A 916 (01) Removal of Structures and Obstructions
LSQ
LS
01B 932(01) Puncheon Step and Run, Type Treated Lumber, 24” width
AQ
Lineal foot
01C 937(01) Treated Timber Bridge, 24 ft. length Sta. 0+32
Each
01D 937(01) Treated Timber Bridge, 30 ft. length Sta. 25+00
01E 937(01) Treated Timber Bridge, 30 ft. length Sta. 25+30
01F
951(01) Mobilization LSQ LS 1 $ $
Base Total $
* METHOD OF MEASUREMENT: AQ = ACTUAL QUANTITIES; CQ = CONTRACT QUANTITIES;
LSQ = LUMP SUM;
Additional Vendor Information
Contact Name:
Phone No:
TIN No.:
DUNS No:
Email:
Electronic Funds Transfer Banking Information Bank
Last Four Numbers of Account
AG-0116-S-11-0044 Anan Trail Enhancements Page 3 of 30
SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF WORK:
1. DESCRIPTION OF WORK:
a. Description:
This project is comprised of all labor, equipment and material to perform the following work on the Anan Creek Trail, Forest Trail No. 22408:
1.) Removal and disposal of one native log stairway with handrails and approximately 84 ft. of treated puncheon step and run.
2.) Construction of an estimated 32 lineal ft. of treated timber puncheon step and run, 24” wide that will replace the removed stairway.
3.) Construction of one 24 ft. long treated timber bridge with one handrail on the downslope side.
4.) Construction of two 30 ft. long treated timber bridges each with one handrail on the downslope side. The two 30 ft. bridges will butt up to each other to form a 60 ft. length. Bridges will span two steep sidehill sections of trail.
5.) Mobilization of materials and equipment to perform the work.
Metal, treated timber, and other manufactured products from the removed stairway and puncheon will be disposed of by removing from Government-administered lands and placing in approved waste disposal sites as per
916.05 Disposal, Forest Service Standard Specifications for Construction and Maintenance of Trails. Native material in the existing stairway may be disposed of by scattering above the trailway out of view from the trail as approved by the COR. Locations where it could impede stream flow shall be avoided as per 916.05 Disposal, Forest Service Standard Specifications for Construction and Maintenance of Trails.
The intent of the contract is to provide for the complete construction of the project described in the contract.
Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
All work shall comply with the rules and regulations of federal, state, and local agencies having jurisdiction.
The Contractor shall acquire all permits, licenses, and approval needed to complete the project from applicable state and local officials.
b. Location:
The project is located approximately 30 air miles south of Wrangell, Alaska on the mainland in Anan
Bay. Anan Bay can be accessed by boat or float plane only. There are two project sites located on the Anan Creek Trail. The first work area is adjacent to the beach near the Anan Bay Cabin. The second work area is adjacent to the Anan Lagoon approximately 700 feet into the Lagoon.
c. Price Range: Between $25,000 and $100,000
C. 2 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.3 AGAR 452.236-78 FOREST SERVICE STANDARD SPECIFICATIONS FOR CONSTRUCTION
AND MAINTENANCE OF TRAILS, EM-7720-103 (SET 1996)
The Standard Specifications for Construction and Maintenance of Trails, EM-7720-103 (Sep 1996) are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Copies of the Forest Service Standard Specifications are available from:
Government Book Store 915 Second Ave.
Seattle, WA 98714 Phone: 206.553.4270, Fax: 206.553.6717, or online at: http://bookstore.gpo.gov/
The Forest Service Specifications can also be obtained from the Forest Service Home Page on the Internet. It is in Adobe Acrobat page description format at: www.fs.fed.us/database/acad/dev/trails/trails.htm http://bookstore.gpo.gov/� http://www.fs.fed.us/database/acad/dev/trails/trails.htm�
AG-0116-S-11-0044 Anan Trail Enhancements Page 4 of 30
C.4 SPECIAL PROJECT SPECIFICATIONS AND FOREST SERVICE SUPPLEMENTION
The following specifications and supplementations are hereby made part of this solicitation and any resultant contract:
Section 901 Abbreviations (as established herein)
TNF SPS 901.1
Section 902 Definitions (as established herein)
TNF SPS 962.1
Section 903 Intent of Contract Section 904 Maintenance for Traffic Section 905 Control of Materials (as established herein)
TNF SPS 905.1
Section 906 Measurement & Payment (as established herein)
TNF SPS 906.1
Section 907 Quality Assurance and Quantity Measurement Section 908 Staking, Flagging, and Cleanup Section 911 Clearing and Grubbing (as established herein)
TNF SPS 911.1
Section 912 Excavation and Embankment (as established herein)
TNF SPS 912.1
Section 916 Removal of Structures and Obstructions Section 932 Puncheon (as established herein)
TNF-SPS 932.1
Section 937 Treated Timber Bridge Section 938 Structural Timber (as established herein)
TNF-SPS 938
Section 951 Mobilization (as established herein)
TNF-SPS 951.1
Section 961 Rock, Grid Pavement Units, and Aggregate Section 962 Material for Timber Structures (as established herein)
TNF-SPS 962.1
Section 962 Material for Timber Structures
SPECIAL NOTE: The above is a list of major specifications applicable to this task order. Other specifications referred to within (even though not specifically listed) are also fully applicable to the solicitation and any resultant task order.
Tongass N.F. Special Specification (04/04) Section 901.1-Abbreviations, Acronyms, and Terms
901.01 Terms, Organizations, and Standards
(a) Specification Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject "the Contractor," is implied. Also implied in this language is "shall," "shall be," or similar words or phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project:
Wherever "directed," "required," "prescribed," or similar words are used, the "direction," "requirement," or "order" of the CO is intended. Similarly, wherever "approved," "acceptable," suitable," "satisfactory," or similar words are used, they mean "approved by," "acceptable to," or "satisfactory to" the CO.
The word "will" generally pertains to decisions or actions of the CO.
AG-0116-S-11-0044 Anan Trail Enhancements Page 5 of 30
Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for the public works contracts.
(b) Abbreviations and Acronyms
AASHTO American Association of State Highway and
Transportation Officials ABS Acrylonitrile-Butadiene-Styrene AQ Actual Quantities APA American Plywood Association ASTM American Society for Testing and Material AWPA American Wood Preservers Association C.F. Cubic Feet CO Contracting Officer C.Y Cubic Yards DQ Design Quantities EA Each f (') feet HDPE High-Density Polyethylene gal gallon hr hour in (") inches lb pounds L.F. Linear Feet LS Lump Sum LSQ Lump Sum Quantities mi miles NBS National Bureau of Standards NCMA National Concrete Masonry Association PE polyethylene PS Product Standard issued by the U.S. Department of Commerce PVC polyvinyl chloride S.F. square feet SQ Staked Quantifies S.Y Square Yards WCLIB West Coast Lumber Inspection Bureau WWPA Western Wood Products Association
(c) Slope notation (horizontal: vertical).
Tongass N.F. Special Specification (04/04) Section 911.1-Clearing and Grubbing
Description
911.01 Work. Work consists of clearing, grubbing, trimming, removing, and treating trees, logs, limbs, branches, brush, plants, and other vegetation within the clearing limits. Work includes the felling and treatment of designated trees outside the clearing limits. Also included are the protection from injury or defacement of trees and other objects not designated for removal and the treatment of damaged trees.
AG-0116-S-11-0044 Anan Trail Enhancements Page 6 of 30
Construction
911.02 Clearing Limits. Clear to the dimensions SHOWN ON THE DRAWINGS or 12" beyond the fill and backslope catch points, whichever is greater.
911.03 Material to Be Cleared. Remove and dispose of trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits, except for the following:
a) Live, sound, and firmly rooted trees of the size SHOWN ON THE DRAWINGS.
b) Live brush, herbaceous plants, and trees between the trailway and the clearing limits that are less than 12" in height and less than 1/2" in diameter at ground line.
Except as provided above, cut all limbs and branches more than 1/2" in diameter that extend into the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as SHOWN ON THE
DRAWINGS.
Fall and limb designated trees.
911.04 Damaged Trees. When felling, cutting, or trimming, do not cause bark damage to standing timber. If damage does occur to standing trees, treat the injured trees as SHOWN ON THE DRAWINGS. Remove and dispose of trees with major roots exposed by construction that are rendered unstable.
911.05 Removal of Stumps. Remove all stumps within the trailbed. Remove stumps located between the edge of the trailbed and the edge of the tramway that cannot be cut flush with the finished slope or that are not tightly rooted.
911.06 Disposal of Clearing Slash, Logs, Stumps, Brush, and Roots. Limb all felled trees to a 4" diameter top, including designated trees outside the clearing limits.
Do not place clearing slash, logs, stumps, brush, or roots in concentrated piles. Scatter all logs, limbs, lopped tops, brush, and grubbed stumps and roots below the trailway and outside the clearing limits, with the following exceptions:
(a) Where the sideslope above the trail is less than 10 percent, material may be scattered above the trail.
(b) Logs may be left on the uphill side of the trail if they are placed so that they will not move into the clearing limits.
Do not place clearing and grubbing debris in water courses, snow ponds, lakes, meadows, or in locations where it could impede the flows to, through, or from drainage structures.
Measurement
911.07 Method. Measure the quantities in accordance with Section 906.
Payment
911.08 Basis.
Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS. Clearing and Grubbing is incidental to other pay items.
Make payment under:
AG-0116-S-11-0044 Anan Trail Enhancements Page 7 of 30
PAY ITEM PAY UNIT
911(01) Clearing and Grubbing................................................... mi
911(62) Clearing and Grubbing...........................................…… L.F.
911(03) Clearing and Grubbing................................................... LS
911(04) Clearing ...............…...................................................... mi
911(05) Clearing ...................................................................….. L.F.
911(06) Clearing ......................................................................... LS
911(07) Grubbing......................................................................... mi
911(08) Grubbing......................................................................... L.F.
911(09) Grubbing......................................................................... LS
911(10) Individual Removal and Disposal .............................. ... EA
911(11) Individual Removal and Disposal ................................. LS
Tongass N.F. Special Specification Section 916.1-Removal of Structures and Obstructions
Description
916.01 Work. Work consists of removal and disposal of existing structures, including turnpikes, walkways, bridges, culverts, signs and posts, and other material within the trailway, above or below ground. Work also includes salvaging DESIGNATED materials and backfilling the resulting trenches, holes, and pits.
Construction
916.02 Removal of Culverts and Bridges. Remove existing culverts within embankment areas at locations
SHOWN ON THE DRAWINGS.
Remove existing structures down to the natural stream bottom, and remove parts outside the water course to at least 12" below natural ground surface or finish ground surface, whichever is lower. Where portions of an existing structure he wholly, or in part, within the limits of a new structure, remove parts to accommodate the installation of the proposed structure.
Avoid damage to bridges being dismantled for salvage. Matchmark steel and/or wood members and prepare drawings showing the structural location of each member.
916.03 Signs and Posts. Remove signs, posts, and associated hardware at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Backfill post hole, compact, and contour area to match existing ground.
916.04 Removal of Other Obstructions. Remove other obstructions at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND.
AG-0116-S-11-0044 Anan Trail Enhancements Page 8 of 30
916.05 Disposal. Dispose of native log and rock material by scattering below the trailway and outside clearing limits. Do not place debris in water courses, snow ponds, lakes, meadows, or locations where it could impede the flow to, through, or from the drainage structures. Dispose of metal, treated timber, and other manufactured products by removing from Government-administered lands and placing in approved waste disposal sites.
Measurement
916.06 Method. Measure the quantities in accordance with Section 906.
Payment
916.07 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for the
PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
ITEM PAY PAY UNIT
916(01) Removal of Structures and Obstructions ….…....... LS
916(02) Removal of....……………………………….......... EA
916(03) Removal of...........………………………………... L.F.
Tongass N. F. Special Project Specification (05/2000) Section 932.1—Puncheon
Description
932.01 Work. Work consists of constructing puncheon, including excavation.
Materials
932.02 Requirements. Use materials meeting the requirements of Section 962 or as SHOWN ON THE DRAWINGS. The location of trees for native timber materials will be SHOWN ON THE DRAWINGS and
DESIGNATED ON THE GROUND.
Construction
932.03 General. Construct puncheon at locations SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Predrill holes for fasteners when necessary to prevent splitting and drive spikes flush.
932.04 Excavation and Embankment. Perform excavation and embankment in accordance with the requirements of Section 912 and as SHOWN ON THE DRAWINGS.
932.05 Mud Sills. Bury mud sills to a depth that provides a finished walking surface that is less than or equal to 1 m above the surrounding ground. Hew sill logs to provide a bearing surface for the log stringers and to provide the log stringers with a level top surface. Do not hew sill logs more than one-third their diameter. Do not level the top surfaces of the log stringers by shimming or notching their ends. Set sills so that fastening of the planking to the sills does not result in crown (convex curve) or dip (concave curve) in the length of the plank between joints.
AG-0116-S-11-0044 Anan Trail Enhancements Page 9 of 30
932.06 Log Stringers. Use logs greater than or equal to 3 m in length. Use logs greater than or equal to 8” in diameter before the top is flattened. Fasten each stringer to each mudsill with drift pins that penetrate a minimum of 4” into the mudsill unless otherwise SHOWN ON THE DRAWINGS.
When plank decking is used, hew the top surfaces of log stringers up to 2” deep, as necessary, to provide bearing surfaces for deck planks.
932.07 Sawn Timber Stringers and Planks. Use sawn timber greater than or equal to 10 ft. in length or as SHOWN ON THE DRAWINGS. Fasten each stringer or plank to each mudsill with drift pins that penetrate a minimum of 4 in. into the mudsill unless otherwise SHOWN ON THE DRAWINGS.
932.08 Finished Walkway. Fully support all planking above the ground on pressure treated sills. Construct abutting ends of sections of log or plank puncheon flush with each other. Do not slope the surface of the completed walkway to either side. Construct the puncheon with a grade that does not exceed 65 percent and where no change in grade exceeds 65 percent unless otherwise SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Construct the finished walking surface of the puncheon flush with the trail grade at each end of the structure.
932.09 Decking. Spike decking evenly at right angles to each stringer. INSTALL PLANK DECKINGAS
SHOWN ON THE DRAWINGS.
Lay split log decking alternately flat side down first, then round side down, ending with a flat side down. When round side is down, notch round log decking to provide a 2”-wide bearing surface.
Lay split and sawn deck planks on the stringer to provide bearing for the full width of the plank.
Trim protruding ends of the decking to give a straight-line appearance to the edges of the structure or as SHOWN
ON THE DRAWINGS.
932.10 Curbs. Construct curbs with logs or sawn timber as SHOWN ON THE DRAWINGS. Use lengths greater than or equal to 10’ and splice with a 6” halflap joint at a spacer location. Match diameters of logs at lap joints and trim excess to provide a smooth transition between logs.
Counter bore lag screws in curbs so that heads are flush with the surface. Finish curbs smooth and free from splinters and sharp projections.
932.11 Approach Fills. Construct the approach fills with compacted suitable material.
Measurement
932.12 Method. Measure the set quantities in accordance with Section 906.
Payment
932.13 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each
PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
PAY ITEM PAY UNIT
932(01) Puncheon ______, Type ______ .............................………...………ft
932(02) Puncheon ______, Type ______ ............................…………………LS
AG-0116-S-11-0044 Anan Trail Enhancements Page 10 of 30
Special Project Specification Section 937 – Treated Timber Bridge
Description
937.01 Work. Work consists of providing all labor, material, and equipment necessary to furnish, fabricate, and erect a treated timber bridge superstructure, substructure, and stairs, including all required lumber and hardware.
Materials
937.02 Bridges Provide a treated glulam stringer bridge AS SHOWN ON THE DRAWINGS.
Decking, bridging, and mudsills and glulam girders and diaphragms to be AS SHOWN ON THE DRAWINGS, incised and pressure treated with copper napthenate in accordance with AWPA.
Bridge rails and posts to be AS SHOWN ON THE DRAWINGS.
937.03 Hardware. All fasteners, including nails, bolts, and connectors, shall be hot dipped galvanized in accordance with AASHTO M232. Fasten Simpson Strong Tie connectors with all bolts and nails as recommended by the manufacturer.
Construction
937.04 General. Perform the work under Section 911.
937.05 Installation. Install bridges at the locations SHOWN ON THE DRAWINGS and STAKED IN THE FIELD BY THE COR. Final locations shall be APPROVED BY THE COR.
937.06 Treated Timber. Fabricate timbers before treatment. Handle treated timber according to the Consumer Information Sheet published by AWPA. Do not cut, frame, or bore treated timber after treatment unless approved by the CO. Handle treated timbers carefully and do not drop, damage outer fibers, or penetrate the surface with tools. Do not use cant dogs, hooks or pike poles. In coastal waters, do not cut or bore timber below the highwater mark.
937.07 Foundation. Clean rock or other hard foundation material, cut to a firm surface that is level, stepped, or serrated. Remove all loose and disintegrated rock. Place leveling course of compacted crushed aggregate (D-1).
Remove unsuitable foundation material and replace with compacted crushed aggregate. Obtain approval of the CO prior to placing leveling course. Mud sills shall be firmly and evenly bedded to solid bearing and carefully tamped in place.
937.08 Decking. Lay decking planks evenly perpendicular to the stringers. Leave ¼ inch spacing between decking planks. Trim protruding ends to give a straight line appearance to the edges of the structure.
937.09 Stringers. Stringers shall be size matched at bearings and shall be positioned so that the camber is up and if possible, so that knots near the edge will be in the top portion of the stringers. Bridging between stringers shall be neatly and accurately framed and securely fastened.
Measurement
937.10 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS.
Work to be paid for includes all clearing and grubbing, excavation, superstructure, substructure, stairs, crushed aggregate for sills, and erosion control.
AG-0116-S-11-0044 Anan Trail Enhancements Page 11 of 30
Payment
937.11 Basis. The accepted quantities will be paid for at the contract price for each PAY ITEM DESIGNATED
IN THE SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item Pay Unit
937 (01) Treated Timber Bridge ______ Feet Long Each
Tongass N.F. Special Specification (04/04) Section 951.1-Mobilization
Description
951.01 Work. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.
Payment
951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE
SCHEDULE OF ITEMS.
Make progress payments for mobilization as follows:
(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.
(b) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.
(c) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.
(d) Pay any unpaid amount for mobilization upon final acceptance of all work items.
Make payment under:
PAY ITEM PAY UNIT
951(01) Mobilization............................................…................... LS
Tongass N.F. Special Project Specification (04/04) Section 962.1 – Material for Timber Structures
962.01 Timber. Select timber from designated sites on Government-administered land. Select the species and sizes of materials as SHOWN ON THE DRAWINGS. Select timber that is straight, sound, and free of defects.
Obtain CO approval of logs and trees before felling or moving them to the site. Fell trees to prevent damage to standing timber and to minimize breakage of trees to be used. Buck logs from felled trees in such a way to minimize waste and to obtain the required length and diameter.
AG-0116-S-11-0044 Anan Trail Enhancements Page 12 of 30
Peel logs, square the ends, and trim the knots and limbs flush unless otherwise SHOWN ON THE DRAWINGS.
Scatter the debris from the processing of timber away from the trail and so it will not block the trail or plug water courses.
962.02 Structural Lumber. Use structural lumber meeting the requirements of AASHTO M 168. Ensure that all structural timber and lumber are seasoned and dried at the time of fabrication. Material that has become twisted, curved, or otherwise distorted prior to assembly into the final structure may be cause for rejection.
Furnish timber and lumber that conform to the species, design values, and nominal dimensions SHOWN ON THE DRAWINGS. Furnish an inspection certification as to the species and grade from an agency accredited by ALSC.
962.03 Hardware. Use drift pins and dowels meeting the requirements of the American Society for Testing and Material (ASTM) A307 and galvanized hardware meeting the requirements of AASHTO M 232.
Use nails of standard form or as SHOWN ON THE DRAWINGS.
Furnish machine and carriage bolts that meet the requirements of ASTM A 307, drift pins and dowels that meet the requirements of ASTM A 575, and galvanized hardware that meets the requirements of AASHTO M 232.
Ensure that all structural steel shapes, rods, glued laminated deck panel dowels, and plates are structural steel that meets the requirements of AASHTO M 183. Ensure that galvanizing meets the requirements of AASHTO M 111.
Furnish bolts with square or hexagonal heads, nuts or dome-heated bolts as SHOWN ON THE DRAWINGS, and nails that are cut or round nails of standard form. Use cut, round, or boat spikes, as specified.
All structural shapes, bars, and plates shall be hot dipped galvanized per ASTM A 123.Light gauge Simpson Strong-Tie connectors or an approved equivalent shall be stainless steel or galvanized to G185 per ASTM A 653 ( Simpson Zmax equivalent). All bolt, nuts & washers shall be hot dipped galvanized per ASTM A 153. Ensure galvanizing will be compatible with ACQ preservative treatment.
962.04 Preservative. Use wood preservative treatment methods meeting the requirements of AASHTO M 133 as SHOWN ON THE DRAWINGS. Completely and accurately fabricate all treated timber before treatment. Provide treated timber that is clean and free of dripping treatment liquids. Submit a certified copy of the lot certification, by a qualified independent inspection and testing agency, to the CO for each charge of preservative, stating penetration in inches and retention in pounds per cubic foot (assay method). In addition, provide a written certification from the producer of the treated products that “Best Management Practices for Treated Wood in Western Aquatic Environments,” published by the Western Wood Preservers Institute and Canadian Institute of Treated Wood, were utilized. Include a description and appropriate documentation of the Best Management Practices used.
Except for pine, incise before treatment all surfaces greater than 2 in. in width, including glued laminated members, and all Douglas fir and western larch surfaces. Treat glued laminated timbers in accordance with AWPA C28. Furnish inspection certification of treatment from an agency accredited by ALSC.
Field treat, in accordance with 938.04 or as SHOWN ON THE DRAWINGS, any area hewn, notched, cut, or drilled after the initial preservative treatment.
962.05 Structural Glued Laminated Timber. Furnish structural glued laminated timber that meets the requirements specified in the current edition of AITC 117. Use the combination symbol, protection, quality marks, certificates, and preservation treatment that are SHOWN ON THE DRAWINGS. Ensure that manufacture, marking, and quality control of structural glued laminated timber are in conformance with ANSI/AITC A190.1, Structural Glued Laminated Timber.
Ensure that members are manufactured as industrial-appearance grade for wet use conditions, using a phenol-resorcinol resin type of adhesive throughout. Use only single- or multiple-piece laminations with boded edge joints.
AG-0116-S-11-0044 Anan Trail Enhancements Page 13 of 30
Ensure that caulking compound used to seal deck panel joints meets the requirements of FSS TT-S-001543 (com.)
and is brown or bronze in color.
SECTION D. PACKAGING AND MARKING
Project Labeling for Official Correspondence
The Government singularly identifies each project with a contract number at time of Award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E. INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F. DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
Federal Acquisition Regulation (48 Cfr Chapter 1) Clauses 52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than June 30, 2011
. The time stated for completion shall include final cleanup of the premises.
SECTION G. CONTRACT ADMINISTRATION DATA
G.1 Contracting Officer’s Representative (COR).
The Contracting Officer will designate a representative hereinafter referred to as the Contracting Officer's Representative (COR) who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the pre-work conference. The Contractor is cautioned to carefully read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer.
http://www.arnet.gov/far/�
AG-0116-S-11-0044 Anan Trail Enhancements Page 14 of 30
G.2 Contractor’s Designated Representative
It is required that the Contractor have a designated representative available on the project during the entire project and that the representative be able to speak and understand English. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer. Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting.
G.3 AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award or pre-work conference with the successful offeror is required. It will be scheduled within reasonable time after award and prior to the issuing of a Notice to Proceed.
SECTION H. SPECIAL CONTRACT REQUIREMENTS
AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORIC SITES (FEB. 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Acontractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
H. 1 ORDER OF PRECEDENCE - REQUIREMENTS, SPECIFICATIONS, DRAWINGS
Resolve any inconsistencies in the Specifications of this solicitation and any resultant contract by giving precedence in the following order:
(a) Section H - Special Contract Requirements
(b) Special Project Specifications
(c) Standard Specifications
(d) Drawings
1. Drawings, figured dimensions over scaled dimensions
2. Drawings, large scale contract drawings over small scale contract drawings
3. Schedules on contract drawings over any conflicting notations on contract drawings.
4. Shop Drawings - (The term "Shop Drawings", includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract.)
H. 2 LANDSCAPE PRESERVATION
(a) Confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.
Unless otherwise agreed to by the CO, retrieve material which falls outside of these limits and either incorporate the material in the work or dispose of the material as directed by the CO.
(b) Schedule and conduct operations to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Install silt fencing around areas immediately next to streams and ponds to mitigate suspended sediments when designated on the drawings.
Do not discharge pollutants such as raw sewage, and other harmful materials into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Do not allow wash water or waste water from concrete or aggregate operations to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Collect and return waste motor oils, fuels, lubricants, bitumens and similar hydrocarbons to the supplier. Comply with the requirements of 40 CFR 279, Standards for the Management of Used Oil. Do not discharge
Do not operate mechanized equipment in live streams without written approval of the Contracting Officer.
hydrocarbon products on the ground, use them for road oiling, or bury them in a landfill.
AG-0116-S-11-0044 Anan Trail Enhancements Page 15 of 30
(c) CREEK CROSSINGS: Schedule and conduct bridge and instream work to minimize disturbance to streams.
1. Do not cross streams without Contracting Officer approval.
2. Submit a written equipment crossing plan to the Contracting Officer for approval 14 calendar days before creek crossing is planned. Two machine crossings will be permitted between and for all streams designated on the drawings as fish streams. Outside of this time period, no machine crossings will be permitted if fish eggs are present in the gravel or adult fish are present in the stream;
otherwise two machine crossings will be permitted.
3. Limit machine crossings to two times for all live streams not designated on the drawings as fish streams with pipes 48” and larger to be installed.
4. Do not leave temporary bridges in place between September 15 and March 15, unless approved in advance in writing by the Contracting Officer.
Obtain necessary permits for floating camps, floats, shore ramps, and other appurtenances associated with project operations from the following State of Alaska and Federal Agencies:
1. ADNR - Alaska Department of Natural Resources.
2. ADEC - Alaska Department of Environmental Conservation.
3. ADGC – Alaska Department of Governmental Coordination.
4. EPA – US Environmental Protection Agency.
5. DA, COE – US Army Corps of Engineers.
6. USCG – US Coast Guard.
H. 3 USE OF PREMISES
(a) Obtain written approval from the Contracting Officer before opening or operating on National Forest land or lands administered by the Forest Service any camp, quarry, borrow pit, storage area, detour, or bypass site, other than SHOWN ON THE DRAWINGS. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such approval, if granted, will be without charge to the Contractor.
(b) Sanitation Facilities: Provide and maintain the following facilities for the work force at the camp, unless provided otherwise.
1. Meet State of Alaska drinking water regulations 18 AAC 80 regarding potable water supplies for drinking, washing and cooking.
2. Comply with State of Alaska wastewater disposal regulations 18 AAC 72 for domestic sewage.
3. Ensure that the design, operation, and maintenance of all solid waste systems under Forest Service jurisdiction meet all Federal, State, and local requirements. Meet State of Alaska solid waste management regulations (18 AAC 60) and Federal regulations contained in 40 CFR 243, 40 CFR 245, 40 CFR 257, and 40 CFR 258. Remove solid wastes and/or residues and dispose of in approved commercial landfills.
4. Meet the requirements of 40 CFR 112 (Oil Pollution Prevention) for fuel storage. Meet the requirements of 33 CFR 150 and 33 CFR 154 for facilities transferrring oil or hazardous materials in bulk.
(c) Do not begin any camp development, either land based or floating, until a plan for development, occupation, and cleanup is submitted and approved by the Contracting Officer. Include the following informationon this plan:
1. Location and size of the proposed camp development, including a map.
2. Wastewater system.
3. Number of people who will use the site and proposed dates of occupancy.
4. Power supply system.
5. Water supply system.
6. Building layout, shop area, living quarters.
7. Road and trail layout.
8. Clearing limits and slash disposal locations.
9. Borrow areas.
10. Dock and access location.
11. Equipment and fuel storage area and Spill Prevention Control and Countermeasure (SPCC) plan.
AG-0116-S-11-0044 Anan Trail Enhancements Page 16 of 30
12. Incinerator location and ash disposal plan.
Forest Service will review plan as submitted for completeness and applicability. Proposed modifications of Contractor's plans will be discussed with the Contractor prior to approval. Any modifications agreed upon will be incorporated in a revised set of plans.
H. 4 EMERGENCY CONTROL
(a) Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.
(b) Contractor's Responsibility for Controlling Other Emergencies - When requested by the Contracting Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work. Payment will be made at not less than the current area rate established by the Forest Service.
(c) Fire fighting equipment will be required during the fire season from May 10 to August 31, and during any other period of fire danger designated by the Contracting Officer.
Furnish rust-free fire tools to equip all workers employed in Contractor's operations at each separate work site.
Maintain tools in serviceable condition and keep tools in one or more weather-tight fire tools boxes. Paint fire tools boxes red, mark "tools for Fire Only" with letters at least 3” high, and keep sealed. Post a list of the contents inside each fire tool box so as to be visible when opened.
Kind of Tool No. of People Working in Area 1-4 5-9 10-15 Axe, d.b chopping, 32-inch min. handle
16-20 1 1 2 3
Shovels, L.H. R.P., No. 0 or larger 1 3 6 7 Pulaski, 32-inch min. handle 2 3 7 10 File, 10-inch mill bastard 1 1 1 2 Pumps, backpack cans, 5-gal filled with water 1 2 2 3
Equip each internal combustion engine with a spark arrester qualified and rated USDA-Forest Service, Standard 5100-1, unless it is:
(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.
(b) A multi-position engine, such as on a chain saw, which is equipped with screen arrester, as described in the Forest Service Spark Arrester guide.
A spark arrester, which does not meet the requirements in this guide may be approved upon submission of acceptable proof that the arrester is at least 80 percent efficient in retention, attrition, or destruction of carbon particles. Such arrester may be required to meet higher standards as improvements in design and efficiency are discovered.
(c) A passenger-carrying vehicle or light truck intended primarily for use on roads, and equipped with a factory designed muffler and exhaust system.
(d) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Properly install and constantly maintain in serviceable condition all exhaust equipment described in this Subsection, including spark arresters and mufflers.
Equip each unit of mobile or stationary power equipment, including trucks, with one shovel, and at least one fire extinguisher meeting one of the following specifications:
1. 2-1/2 pound size or larger dry chemical type.
2. 4-pound size or larger carbon dioxide type.
AG-0116-S-11-0044 Anan Trail Enhancements Page 17 of 30
Test or check each extinguisher for proper functioning prior to the beginning of fire precautionary period.
Provide each gasoline power saw with one chemical-pressurized fire extinguisher of not less than 8-ounce capacity by weight. Maintain the extinguisher in good working order at all times.
Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the Contracting Officer. Submit written requests for burning to the Contracting Officer at least 48 hours in advance of intended burning. The Contracting Officer will approve routine camp refuse disposal incineration in the camp development proposal.
H. 5 DISPOSAL OF MERCHANTABLE TIMBER
All timber meeting Forest Service merchantability standards logged during prosecution of this contract, remains the property of the Government. Deck logs in the immediate vicinity in accordance with Section 201 of the specifications.
Buck trees in various lengths to obtain the greatest utilization of material meeting the following utilization standards. The Minimum merchantable piece shall be 6” in diameter inside bark at small end, 12 feet in length, have a net scale of 33 1/3 percent of its gross scale for a sawlog or produce not less than 50 percent of its gross volume in firm usable pulp chips.
Trim allowance shall be a maximum of 12” for log lengths up to 40 foot. An additional 2” of trim shall be allowed for each 10 foot of log length over 40 foot.
Use humbolt undercut in felling merchantable timber. Buck all limbs flush with merchantable logs.
All dead trees which are sufficiently tall to reach the roadbed are designated for cutting. Fell other fire-dangerous dead trees or unstable live trees within 200 foot slope distance of the center line of the road, when marked by the Forest Service. Treat all timber under this subsection meeting utilization standards in accordance with Specification 201 Subsection 201.04, unless relieved in writing.
Cut and use timber designated by the Contracting Officer for construction, without charge.
H. 6 LOCAL MATERIAL SOURCES
No material sources are avaliable along the trail.
H.7 CONSTRUCTION STAKES, LINES, AND GRADES
Contractor's Responsibilities: { Trails }
Perform all construction staking in accordance with the requirements of Section 908 except for the following item(s):
The Government will mark the clearing limits around rock borrow sources on National Forest Land.
Perform all construction staking and grade establishment, except for the following item(s):
Contractor's Responsibilities: {Trails }
The Government will provide initial centerline and reference controls to establish trail and timber structures. Additional staking required by, and installed by, the Contractor will be incidental to the construction of the pay item.
AG-0116-S-11-0044 Anan Trail Enhancements Page 18 of 30
PART II--CONTRACT CLAUSES
SECTION I. CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
Federal Acquisition Regulation (48 CFR Chapter 1) Clauses 52.204-7 Central Contractor Registration (Apr 2008) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2010) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-6 Notice of Total Small Business Set-Aside (June 2003) 52.219-28 Post-Award Small Business Program Rerepresentation (Apr 2009) 52.222-3 Convict Labor (June 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (June 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (Oct 2010) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008) 52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Pledges of Assets (SEP 2009) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986) 52.232-25 Prompt Payment (Oct 2008) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law…