AG-0116-S-10-0074_Anan_Observatory_Stair_Repair.pdf

PDF 8 MB Posted

Attached to
Anan Bay Observatory Staircase Repairs
Solicitation number
AG-0116-S-10-0074
Issued by

About this file

Complete Solicitation

View the file

Other files

File Type Posted
amend_three.pdf PDF
amend_two.doc DOC document
SF_30_single_page.pdf PDF
AG-0116-S-10-0074_Anan_Observatory_Stair_Repair_Return_to_FS.pdf PDF
AnanStaircase_SectionJ_existing_design.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTES

Solicitation No: AG-0116-S-10-0074

PROJECT NAME: Anan Bay Observatory Staircase Repairs

ISSUING OFFICE:

US Forest Service 204 Siginaka Way

SITKA, AK 99835

Phone (907) 747-4273 – Fax (907) 747-4289

Quotation Due Date:

08/05/2010

QUICK INDEX

Section Item Description A SF 18, Request For Quotations

B Schedule of Items

C Description and Specifications

D Packaging and Marking

E Inspection and Acceptance

F Deliveries and Performance

G Contract Administration Data

H Special Contract Requirements

I Contract Clauses

J List of Attachments

K Representation/Certifications

L Instructions to Offerors

M Evaluation Factors

QUOTE REMINDERS

Submit printed copy of quote to the address listed on the enclosed SF 18.

Before submitting your quote, please review the following:

• Have you rechecked your bid figures?

• Have you completed the Schedule of Items?

• Have you completed and signed the SF 18, Request For Quotations?

• Have you acknowledged all amendments?

• Have you registered in the Central

Contractor Registration database?

(Section I.2)

• Have you completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http:/ / orca.bpn.gov (Section K)

AG-0116-S-10-0074

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

07/06/2010 420565

TONGASS NF SITKA OFFICE

204 SIGINAKA WAY

SITKA AK 99835

USDA FOREST SERVICE

05/31/2011

WRANGELL DISTRICT

525 BENNETT STREET

WRANGELL

AK 99929

907 747-4273KAY STEFFEY

08/05/2010 1500 AS

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Project to design and recontruct staircase, landing & steps at the Anan Bear Observatory

001 Project to design and recontruct staircase, landing & steps at the Anan Bear Observatory Product/Service Code: 9999 Product/Service Description: MISCELLANEOUS ITEMS

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

Anan Observatory Staircase Repair AG-0116-S-10-0074

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

Anan Observatory Staircase Repairs

Schedule of Items

Pay Item

Description Meth.

of

Meas.

Qty Pay Unit

Unit Price

Total

Anan Observatory Staircase Repairs – design and construction

LSQ 1 LS $_______ $________

Bidder:

By: ___________________ _______________________ _______________________ (Signature) (Title) (Date)

Vendor Name: Phone

Signature: Fax

Address: Email

City, State, Zip: TIN#

Duns#

Info Below requested to ensure payment info on record is accurate in the interest of preventing any delays in the distribution of any payments.

Bank Name Last 4 digits of Acct #

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

ANAN OBSERVATORY STAIRCASE REPAIR

C.1 Scope of Contract

a. Description: The project involves the structural design and reconstruction of a staircase at the Anan Bear Observatory. The existing staircase is a two span structure, approximately 20 feet long. The proposed staircase will be a one span structure.

The reason for this redesign is because the supporting rock at the midspan support of the existing staircase has been determined to be unstable. The staircase is supported by two glulam stringers; these stringers also support a landing at the bottom of the staircase, and steps from the landing to the viewing platform (see photos and drawings).

The materials in the staircase, landing, and steps are all in good condition and may be reused by the Contractor if not damaged during contract operations.

Existing drawings are included for information only. The staircase to be replaced starts at Intermediate Landing 3 and spans to Intermediate Landing 4. Intermediate Landing 4 and the steps from Intermediate Landing 4 to the viewing platform are also supported by the staircase stringers. An 11x17 set of the drawings will be provided to the Contractor after contract award.

The Contractor is responsible for design of the retrofit staircase. Possible options are:

• Strengthen the existing staircase to span the new distance by adding an additional stringer

• Strengthen the existing staircase to span the new distance by adding load carrying capacity to the existing stringers

• Replace the existing staircase with a new staircase

• Other options as designed by the Contractor and stamped by a Professional Engineer

• Consider the Intermediate Landing 4 and the steps to the viewing platform which are also supported by the glulam stringers which support the staircase.

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the contractor is to furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in reasonably close conformity with the drawings and specifications, and in accordance with the provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

C 1.1 Project Location The Anan Bear Observatory is located at the end of the approximately one mile long Anan Creek Trail, which leaves from Anan Bay on the Cleveland Peninsula, just south of Bradfield Canal. The staircase, landing, and steps to be replaced are the last structures as you descend from the Bear Observatory on top of the rock knob to the viewing platform next to the Creek. Anan Bay is located about 30 miles southeast of Wrangell, Alaska.

Anan Bay is accessible by boat or floatplane. Helicopter use is allowed. The nearest full service community is Wrangell.

C 1.2 Price Range The Government's estimate is:

between $25,000 and $100,000.

C.2. Construction timing

Work at the site shall start after September 15, 2010, and shall be completed by May 30, 2011.

The Forest Service will close the cabin to public use between these dates. A winter shutdown will be allowed under this contract.

C.3 Definition

Contracting Officer (CO): an official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.

C.4 Standard Specifications for Construction and Maintenance of Trails, EM-7720-103

The Standard Specifications for Construction and Maintenance of Trails, EM-7720-103, are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. These can be obtained on-line from:

http://www.fs.fed.us/database/acad/dev/trails/trails.htm, File Name Trails.zip

C.5 Special Project Specification

The following special project specifications and supplementations to EM-7720-103 are herby made part of this solicitation and any resultant contract.

937 Treated Timber Structures As established here-in 962 Material for Timber Structures As replaced here-in http://www.fs.fed.us/database/acad/dev/trails/trails.htm�

Section 937 – Treated Timber Structures

Description

937.01 Work. This work consists of design and construction of a treated timber staircase, landing, and steps, including all supports, decking, railing, and supports for viewing blind canopy. The work also includes removal and disposal of the existing structures. The work also includes protecting existing structures from damage.

Materials

937.02 Requirements. Use timber materials and hardware meeting the requirements of Section 962.

Construction

937.03 Design.

A. Design of the Anan Staircase shall be in accordance with applicable codes and regulations including National Design Specification for Wood Construction (NDS) published by the American Forest and Paper Association, Minimum Design Loads for Buildings and Other Structures (ASCE7) published by the American Society of Civil Engineers, International Building Code (IBC) published by International Code Council, and timber, steel, and/or concrete design manuals and standards accepted by industry.

B. The design shall be prepared by a professional engineer licensed by the state of Alaska, who shall affix their stamp and signature on the final design submittals. Submittals to include calculations, drawings, and material specifications.

C. Contractor’s design will be reviewed by the Forest Service for completeness and adherence to design standards. No later than sixty (60) calendar days prior to ordering materials, the Contractor shall submit to the CO two copies of the final design submittals.

D. The Government shall review the submittals and within twenty one (21) calendar days provide a written response to the Contractor outlining any corrections to the proposed working drawings. The Contractor shall then have seven (7) days to submit corrected submittals to the CO for approval. Approval of the submittals will constitute the Contractor's Notice to Proceed.

E. The components to be considered in the design/redeisgn are the staircase, landing, and steps as described in Section C. The uphill support for the staircase is on solid rock and will be shared with an existing landing. The downhill supports for the staircase stringers are 2 steel beam seats attached to a rock wall with rebar anchors. The landing and upper end of the steps are supported by the lower end of the staircase stringers. The downhill support for the steps is the viewing platform, which is supported by concrete walls.

F. Drawings and photos of the existing structures are included in Section J.

G. Staircase, landing, and step dimensions shall match existing dimensions. Meet IBC

1009.4.4 dimensional uniformity for stair treads and risers. Rail height, spacing, and design to match existing rail design. Maximum deflection to be less than length/360.

H. Ground snow load = 100 pounds per square foot (psf).

Pedestrian loading = 85 pounds per square foot (psf).

Minimum concentrated load on stair treads is 300 pounds.

I. Basic wind speed = 110 miles per hour (3-second gust). Exposure Category B.

J. Seismic loading

1. Spectral response acceleration parameter at short periods (Ss) = 0.15

2. Spectral response acceleration parameter at a period of one second (S1) = 0.15

K. Desired characteristics include:

1. Design to be sturdy and provide redundancy at all possible locations. This is a remote site, is constantly damp because of proximity to Anan Creek, has moderate use during the summer months with no use in the fall/winter/spring, and is infrequently visited by an engineer for structural inspections.

2. Structural components visible and accessible for scheduled inspections

3. Minimum maintenance and easy repair of components

4. No supports will be allowed in the stream or fish pass water way

937.04 Salvaging Material. Salvage and re-install the existing gate and supports for viewing blind canopy. Salvage and re-install existing staircase, landing, and step materials if appropriate for the new design and materials are suitable for use. Provide structural inspection and assessment of existing beam seats and connections to the rock wall; protect from damage and incorporate into new design if adequate for re-use.

937.05 Removing Material. Remove all sills, posts, stringers, steps, decking, rails, railing, and other structures and obstructions not designated to remain. Dispose of all materials, including timber, fasteners, brackets, and nails, off of Forest Service land in accordance with all applicable local, state, and federal laws, rules, and regulations. Existing timber is preservative treated.

937.06 Construction. Supply materials and perform construction as shown in approved Contractor’s design. Anchor foundation to bedrock. Fasten stringers to supports. Attach decking and steps evenly; trim protruding ends to give a straight line appearance to the edges of the structure. Splice rails with a diagonal butt joint at post locations only. Use S4S sawn timber for all rails, posts, and top caps. No incisions for pressure treatment are allowed in top rails. Finish handrails and posts smooth and free from splinters and sharp projections.

Section 962 – Material for Timber Structures

962.01 Structural Lumber. Use structural lumber meeting the requirements of AASHTO M 168 and grading rules as required by approved Contractor’s design. Use structural glued laminated timber manufactured in accordance with ANSI/AITC A190.1.

All lumber to be preservative treated. If Alaska Yellow Cedar or similar wood with naturally durable properties is used, preservative treatment is not required.

962.02 Hardware. Steel hardware components shall be hot-dipped in zinc after fabrication according to ASTM A 153 / A 153M. Steel fabrications shall be hot-dipped in zinc after fabrication according to ASTM A 123 / A 123M. Tailings and sharp protrusions formed as a result of the hot-dip process shall be removed and the edges shall be burnished. Apply field touch ups as necessary.

962.03 Preservative. Use wood preservative treatment methods meeting the requirements of AASHTO M 133. Completely and accurately fabricate all treated timber before treatment.

Provide treated timber that is clean and free of dripping treatment liquids. Provide fasteners and brackets made of a material that is recommended for use with the specified preservative treatment.

Submit a certified copy of the lot certification, by a qualified independent inspection and testing agency, to the CO for each charge of preservative, stating penetration in inches and retention in pounds per cubic foot (assay method). In addition, provide a written certification from the producer of the treated products that the “Best Management Practices for the Use of Treated Wood in Aquatic and Other Sensitive Environments,” published by the Western Wood Preservers Institute and Canadian Institute of Treated Wood, were utilized. Include a description and appropriate documentation of the Best Management Practices used.

Except for top rails, incise before treatment all surfaces greater than 2 inches in width. Field treat any area hewn, notched, cut, or drilled after the initial preservative treatment.

C.6 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

D.1 The Government singularly identifies each project with a contract number at time of Award.

The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996) http://www.arnet.gov/far/�

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than May 31, 2011 The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 Contracting Officer’s Representative (COR).

The Contracting Officer will designate a representative hereinafter referred to as the Contracting Officer's Representative or COR who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the pre-work conference. The Contractor is cautioned to carefully read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer.

G.2 Contractor’s Designated Representative It is required that the Contractor have a designated representative available on the project during the entire project. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer. Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting.

G.3 AGAR 452.215-73 Post Award Conference (NOV 1996) A post award or pre-work conference with the successful offeror is required. It will be scheduled within reasonable time after award and prior to the issuing of a Notice to Proceed.

G.4 Government Furnished Property The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

There will be no Government Property furnished in this contract

G.5 Method of Payment and Invoicing Procedures

Both progress payments and final payments are paid thirty days from the later of; the date the designated billing office receives a Proper Invoice or the date the invoiced work is accepted. A Proper Invoice has the required information as per FAR 32.905(b) and contains:

• Name and address of the Contractor.

• Name and address of billing office

• Invoice date and Invoice Number (The Contractor should date invoices as close as possible to the date of mailing or transmitting).

• Contract number or Task Order Number.

• Description, quantity, unit of measure, unit price and extended price of services or supplies delivered. (The Contract Line Item Number found in the Schedule of Items.)

• Name and address of contractor official to which payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

• Name, title, phone number and mailing address of person to notify in the event of a defective invoice.

• Taxpayer Identification Number (TIN).

It is the responsibility of the Contractor to submit Proper Invoices. The Government will return defective invoices to the Contractor for correction and that could mean a delay in the payment process.

Send or fax invoices to the designated billing office: NOT to the COR. Please make your invoice neat and legible. We advise using large type size to retain readability after faxing. See Invoice Example Exhibit in Section J.

Designated Billing Office Tongass National Forest, Contracting Office

204 Siginaka Way Sitka, AK 99835 Fax 907-747-4289

Contract Release Form for Final Payment A properly executed Contract Release, Form 6300-16 (attached), must accompany the final invoice. Final payments for construction and service contracts are 30 day payments. This is filled out by the Contractor and signed by the Contractor. The Contract Release asks for the final payment amount and NOT the total contract amount. Non-construction progress payments and final payments are paid thirty days from the later of; the date the designated billing office receives a Proper Invoice or the date the invoiced work is accepted.

CONSTRUCTION PAYMENTS

G.6 52.232-5 Payments under Fixed Price Construction Contracts (Sep 2002)

All construction contracts contain this clause by reference in Section I of the terms and conditions: 52.232-5 Payments under Fixed-Price Construction Contracts. This clause can be accessed in full at: www.arnet.gov/far/. This clause requires contractors to furnish the progress certification form that is attached with each progress payment, submit with each request for progress payment work performed by each subcontractor, dollar amount of each subcontract under the contract and a listing of amounts previously paid to each subcontractor.

Progress payments for construction are 14 days after the later of: receipt of proper invoice at the designated billing office or acceptance of work. Invoices must comply with FAR 32.905(b).

G.7 Sub-Contractor Payment Tracking

Should you have sub-contractors we will email you a copy of a Subcontractor Payment Tracking Spreadsheet that will aid in disclosing the work performed by each subcontractor, the dollar amount and the amounts previously paid to each subcontractor referenced in the far clause 52.232-5.

G.8 Sub-contract Statement and Acknowledgement conditions: 52.222-11 Subcontracts (Labor Standards) (Jul 2005). This clause can be accessed in full at: www.arnet.gov/far/. This clause require that the Contractor shall deliver to the Contracting Officer a completed Standard Form (SF) 1413, Statement and Acknowledgment, for each subcontract for construction within the United States. We can supply you with that form if requested.

G.9 52.222-8 Payrolls and Basic Records (Feb 1988) conditions: 52.222-8 Payrolls and Basic Records (Feb 1988). This clause requires the contractor to submit weekly certified payrolls to the COR. If you are a prime contractor, then you are to collect payrolls from all your subs and submit copies of them to the COR as well. This clause can be accessed in full at: www.arnet.gov/far/.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORIC SITES (FEB. 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Acontractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

H. 2 ORDER OF PRECEDENCE - REQUIREMENTS, SPECIFICATIONS,

DRAWINGS

Resolve any inconsistencies in the Specifications of this solicitation and any resultant contract by giving precedence in the following order:

(a) Section H - Special Contract Requirements

(b) Special Project Specifications

(c) Standard Specifications for Construction and Maintenance of Trails, EM-7720-103

(d) Drawings

1. Drawings, figured dimensions over scaled dimensions

2. Drawings, large scale contract drawings over small scale contract drawings

3. Schedules on contract drawings over any conflicting notations on contract drawings.

4. Shop Drawings - (The term "Shop Drawings", includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract.)

H. 3 LANDSCAPE PRESERVATION

(a) Confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Unless otherwise agreed to by the CO, retrieve material which falls outside of these limits and either incorporate the material in the work or dispose of the material as directed by the CO.

(b) Schedule and conduct operations to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Install silt fencing around areas immediately next to streams and ponds to mitigate suspended sediments when designated on the drawings.

Operate equipment so that wheels and tracks do not damage the grassy area surrounding the cabin. Repair any damage caused by equipment and restore the grass to it’s original condition.

Do not discharge pollutants such as raw sewage, and other harmful materials into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto.

Do not allow wash water or waste water from concrete or aggregate operations to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Collect and return waste motor oils, fuels, lubricants, bitumens and similar hydrocarbons to the supplier. Comply with the requirements of 40 CFR 279, Standards for the Management of Used Oil. Do not discharge hydrocarbon products on the ground, use them for road oiling, or bury them in a landfill.

Do not operate mechanized equipment in live streams without written approval of the Contracting Officer.

Obtain necessary permits for floating camps, floats, shore ramps, and other appurtenances associated with project operations from the following State of Alaska and Federal Agencies:

1. ADNR - Alaska Department of Natural Resources.

2. ADEC - Alaska Department of Environmental Conservation.

3. ADGC – Alaska Department of Governmental Coordination.

4. EPA – US Environmental Protection Agency.

5. DA, COE – US Army Corps of Engineers.

6. USCG – US Coast Guard.

H. 4 USE OF PREMISES

(a) Obtain written approval from the Contracting Officer before opening or operating on

National Forest land or lands administered by the Forest Service any camp, quarry, borrow pit, storage area, detour, or bypass site, other than SHOWN ON THE DRAWINGS. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such approval, if granted, will be without charge to the Contractor.

(b) Sanitation Facilities: Provide and maintain the following facilities for the work force at the camp, unless provided otherwise.

1. Meet State of Alaska drinking water regulations 18 AAC 80 regarding potable water supplies for drinking, washing and cooking.

2. Comply with State of Alaska wastewater disposal regulations 18 AAC 72 for domestic sewage.

3. Ensure that the design, operation, and maintenance of all solid waste systems under

Forest Service jurisdiction meet all Federal, State, and local requirements. Meet State of Alaska solid waste management regulations (18 AAC 60) and Federal regulations contained in 40 CFR 243, 40 CFR 245, 40 CFR 257, and 40 CFR 258. Remove solid wastes and/or residues and dispose of in approved commercial landfills.

4. Meet the requirements of 40 CFR 112 (Oil Pollution Prevention) for fuel storage.

Meet the requirements of 33 CFR 150 and 33 CFR 154 for facilities transferrring oil or hazardous materials in bulk.

(c) Do not begin any camp development, either land based or floating, until a plan for development, occupation, and cleanup is submitted and approved by the Contracting Officer. Include the following informationon this plan:

1. Location and size of the proposed camp development, including a map.

2. Wastewater system.

3. Number of people who will use the site and proposed dates of occupancy.

4. Power supply system.

5. Water supply system.

6. Building layout, shop area, living quarters.

7. Road and trail layout.

8. Clearing limits and slash disposal locations.

9. Borrow areas.

10. Dock and access location.

11. Equipment and fuel storage area and Spill Prevention Control and Countermeasure

(SPCC) plan.

12. Incinerator location and ash disposal plan.

Forest Service will review plan as submitted for completeness and applicability. Proposed modifications of Contractor's plans will be discussed with the Contractor prior to approval. Any modifications agreed upon will be incorporated in a revised set of plans.

The area is frequented by black bears and brown bears, which may become habituated to humans and may be attracted by activity and food. In the campsite, store food in a bear-proof container or hang at least 12 feet above ground. Avoid leaving any food scraps at any time in camp or around the project site.

H. 5 EMERGENCY CONTROL

(a) Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the

Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.

(b) Contractor's Responsibility for Controlling Other Emergencies - When requested by the

Contracting Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work. Payment will be made at not less than the current area rate established by the Forest Service.

(c) Fire fighting equipment will be required during the fire season from May 10 to August

31, and during any other period of fire danger designated by the Contracting Officer.

Furnish rust-free fire tools to equip all workers employed in Contractor's operations at each separate work site. Maintain tools in serviceable condition and keep tools in one or more weather-tight fire tools boxes. Paint fire tools boxes red, mark "tools for Fire Only" with letters at least 3” high, and keep sealed. Post a list of the contents inside each fire tool box so as to be visible when opened.

Kind of Tool No. of People Working in Area 1-4 5-9 10-15 Axe, d.b chopping, 32-inch min. handle

16-20 1 1 2 3

Shovels, L.H. R.P., No. 0 or larger 1 3 6 7 Pulaski, 32-inch min. handle 2 3 7 10 File, 10-inch mill bastard 1 1 1 2 Pumps, backpack cans, 5-gal filled with water

1 2 2 3

Equip each internal combustion engine with a spark arrester qualified and rated USDA-Forest Service, Standard 5100-1, unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(b) A multi-position engine, such as on a chain saw, which is equipped with screen arrester, as described in the Forest Service Spark Arrester guide.

A spark arrester, which does not meet the requirements in this guide may be approved upon submission of acceptable proof that the arrester is at least 80 percent efficient in retention, attrition, or destruction of carbon particles. Such arrester may be required to meet higher standards as improvements in design and efficiency are discovered.

(c) A passenger-carrying vehicle or light truck intended primarily for use on roads, and equipped with a factory designed muffler and exhaust system.

(d) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Properly install and constantly maintain in serviceable condition all exhaust equipment described in this Subsection, including spark arresters and mufflers.

Equip each unit of mobile or stationary power equipment, including trucks, with one shovel, and at least one fire extinguisher meeting one of the following specifications:

1. 2-1/2 pound size or larger dry chemical type.

2. 4-pound size or larger carbon dioxide type.

Test or check each extinguisher for proper functioning prior to the beginning of fire precautionary period.

Provide each gasoline power saw with one chemical-pressurized fire extinguisher of not less than 8-ounce capacity by weight. Maintain the extinguisher in good working order at all times.

Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the Contracting Officer. Submit written requests for burning to the Contracting Officer at least 48 hours in advance of intended burning. The Contracting Officer will approve routine camp refuse disposal incineration in the camp development proposal.

H. 6 COORDINATION WITH OTHER CONTRACTORS

Contruction timing for the Anan Bay Cabin Replacement contract is similar to construction timing for this contract. The Forest Service will provide the name and contact information for the Anan Bay Cabin Replacement contractor. Contractor shall coordinate use of the site with the Anan Bay Cabin Reaplacement contractor.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)

(Applicable if contract exceeds $30,000) 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (FEB 1988) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (DEC 2007) 52.223-6 Drug-Free Workplace (MAY 2001) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (FEB 1992) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986) http://www.usda.gov/procurement/policy/agar.html�

52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT

2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Other Contracts (APR 1984) 52.236-8 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV

1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 52.204-7 Central Contractor Registration (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or http://fedgov.dnb.com/webform�

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S.

Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims).

Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961- 5757.

I.3 FAR 52.225-9 Buy American Act-Construction Materials (FEB 2009)

(a) Definitions. As used in this clause--http://www.ccr.gov/�

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C.

App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .