SEADC Door Replacement Project Specification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG0112S170013Amd1.pdf | ||
| SEADC_Door_Replacement_Q&A_3.pdf | ||
| SEADC_Door_Replacement_Q&A_2.pdf | ||
| SEADC_Door_Replacement_Pre-Proposal_Questions.pdf | ||
| AG0112S170013SeadcDoorReplac.pdf | ||
| SEADC_DOOR_REPLACEMENT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEADC Door Replacement Project Specification 3/4/2017
Table of Contents
Division Section Title Revision Date Pages
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0115 LIST OF DRAWING SHEETS 3/4/2017 1
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
01 4000 QUALITY REQUIREMENTS 3/4/2017 3
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 3/4/2017 7
01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 3/4/2017 4
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
02 4119 SELECTIVE DEMOLITION 3/4/2017 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 9200 JOINT SEALANTS 3/4/2017 4
DIVISION 08 - OPENINGS
08 1613 FIBERGLASS DOORS 3/4/2017 2
08 7100 DOOR HARDWARE 3/4/2017 3
END OF TABLE OF CONTENTS
LIST OF DRAWING SHEETS
DOCUMENT 000115 - LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled SEADC DOOR REPLACEMENT, dated 3/4/2017, as modified by subsequent Addenda and Contract modifications.
B. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:
1. COVER SHEET
2. A1.1 MAIN LEVEL FLOOR PLAN SOUTH
3. A1.2 MAIN LEVEL FLOOR PLAN NORTH
4. A1.3 LOWER LEVEL FLOOR PLAN
5. A1.4 DETAILS AND DOOR SCHEULE
END OF DOCUMENT 000115
SECTION 014000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.
B. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements, comply with the most stringent requirement. Refer uncertainties to Architect for a decision.
C. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum. The actual installation may exceed the minimum within reasonable limits.
Indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision.
D. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility sent to authorities having jurisdiction before starting work on the following systems:
1. Seismic-force-resisting system, designated seismic system, or component listed in the designated seismic system quality-assurance plan prepared by Architect.
2. Main wind-force-resisting system or a wind-resisting component listed in the wind-force-resisting system quality-assurance plan prepared by Architect.
E. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
F. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, notices, receipts for fee payments, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
G. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated.
H. Testing Agency Qualifications: An independent agency with the experience and capability to conduct testing and inspecting indicated; and where required by authorities having jurisdiction, that is acceptable to authorities.
I. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.
J. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Architect and Contractor of irregularities or deficiencies in the Work observed during performance of its services.
2. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.
3. Do not perform any duties of Contractor.
K. Associated Services: Cooperate with testing agencies and provide reasonable auxiliary services as requested. Provide the following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5. Security and protection for samples and for testing and inspecting equipment.
L. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and
-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
M. Special Tests and Inspections: Engage a qualified testing agency or special inspector to conduct special tests and inspections required by authorities having jurisdiction.
N. Special Tests and Inspections: Conducted by a qualified testing agency or special inspector as required by authorities having jurisdiction, as indicated in individual Specification Sections.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
B. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
END OF SECTION 014000
SECTION 017000 - EXECUTION AND CLOSEOUT REQUIREMENTS
1.1 EXECUTION REQUIREMENTS
A. Certificates: Submit certificate signed by Contractor certifying that location and elevation of improvements comply with requirements.
B. Cutting and Patching:
1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from Architect before proceeding.
Shore, brace, and support structural elements during cutting and patching.
2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities.
C. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.
1.2 CLOSEOUT SUBMITTALS
A. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.
B. Certified List of Incomplete Items: Final submittal at Final Completion.
C. Operation and Maintenance Data: Submit one copy of manual.
D. PDF Electronic File: Assemble manual into a composite electronically indexed file. Submit on digital media.
E. Record Drawings: Submit one copy of marked-up record prints.
F. Record Digital Data Files: Submit data file and one set of plots.
G. Record Product Data: Submit one paper copy annotated PDF electronic files and directories of each submittal.
1.3 SUBSTANTIAL COMPLETION PROCEDURES
A. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
B. Submittals Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:
1. Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
2. Submit closeout submittals specified in other sections, including project record documents, operation and maintenance manuals, property surveys, similar final record information, warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
3. Submit maintenance material submittals specified in other sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Architect.
4. Submit test/adjust/balance records.
5. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.
C. Procedures Prior to Substantial Completion: Before requesting Substantial Completion inspection, complete the following:
1. Advise Owner of pending insurance changeover requirements.
2. Make final changeover of permanent locks and deliver keys to Owner.
3. Complete startup and testing of systems and equipment.
4. Perform preventive maintenance on equipment used prior to Substantial Completion.
5. Advise Owner of changeover in heat and other utilities.
6. Participate with Owner in conducting inspection and walkthrough with local emergency responders.
7. Remove temporary facilities and controls.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
D. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will proceed with inspection or advise Contractor of unfulfilled requirements.
Architect will prepare the Certificate of Substantial Completion after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1.4 FINAL COMPLETION PROCEDURES
A. Submittals Prior to Final Completion: Before requesting inspection for determining final completion, complete the following:
1. Submit a final Application for Payment.
2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. Certified copy of the list shall state that each item has been completed or otherwise resolved.
3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.
4. Submit pest-control final inspection report.
B. Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare final Certificate for Payment after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
PART 2 - PRODUCTS
2.1 MATERIALS
A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.
2.2 OPERATION AND MAINTENANCE DOCUMENTATION
A. Directory: Prepare a single, comprehensive directory of emergency, operation, and maintenance data and materials, listing items and their location to facilitate ready access to desired information.
B. Organization: Unless otherwise indicated, organize manual into separate sections for each system and subsystem, and separate sections for each piece of equipment not part of a system.
C. Organize data into three-ring binders with identification on front and spine of each binder, and envelopes for folded drawings. Include the following:
1. Manufacturer's operation and maintenance documentation.
2. Maintenance and service schedules.
3. Maintenance service contracts. Include name and telephone number of service agent.
4. Emergency instructions.
5. Spare parts list and local sources of maintenance materials.
6. Wiring diagrams.
7. Copies of warranties. Include procedures to follow and required notifications for warranty claims
2.3 RECORD DRAWINGS
A. Record Prints: Maintain a set of prints of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. Mark to show actual installation where installation varies from that shown originally. Accurately record information in an acceptable drawing technique.
1. Identify and date each record Drawing; include the designation "PROJECT RECORD
DRAWING" in a prominent location.
B. Record Digital Data Files: Immediately before inspection for Certificate of Substantial Completion, review marked-up record prints with Architect. When authorized, prepare a full set of corrected digital data files of the Contract Drawings.
1. Format: Annotated PDF electronic file.
3.1 EXAMINATION AND PREPARATION
A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.
B. Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance.
1. Verify compatibility with and suitability of substrates.
2. Examine roughing-in for mechanical and electrical systems.
3. Examine walls, floors, and roofs for suitable conditions.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
D. Take field measurements as required to fit the Work properly. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication.
E. Verify space requirements and dimensions of items shown diagrammatically on Drawings.
F. Surface and Substrate Preparation: Comply with manufacturer's written recommendations for preparation of substrates to receive subsequent work.
3.2 CONSTRUCTION LAYOUT AND FIELD ENGINEERING
A. Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks.
3.3 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
B. Comply with manufacturer's written instructions and recommendations.
C. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
D. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed.
E. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place. Where size and type of attachments are not indicated, verify size and type required for load conditions.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by CO.
F. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
G. Use products, cleaners, and installation materials that are not considered hazardous.
3.4 CUTTING AND PATCHING
A. Provide temporary support of work to be cut.
B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.
D. Cutting: Cut in-place construction using methods least likely to damage elements retained or adjoining construction.
1. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
E. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.
1. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will minimize evidence of patching and refinishing.
2. Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance.
3. Where patching occurs in a painted surface, prepare substrate and apply primer and intermediate paint coats appropriate for substrate over the patch, and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.
3.5 CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
3. Remove debris from concealed spaces before enclosing the space.
B. Complete the following cleaning operations before requesting inspection for certification of
Substantial Completion:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
2. Sweep paved areas broom clean. Remove spills, stains, and other foreign deposits.
3. Remove labels that are not permanent.
4. Clean transparent materials, including mirrors. Remove excess glazing compounds.
5. Clean exposed finishes to a dust-free condition, free of stains, films, and foreign substances. Sweep concrete floors broom clean.
6. Vacuum carpeted surfaces and wax resilient flooring.
7. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and foreign substances. Clean plumbing fixtures. Clean light fixtures, lamps, globes, and reflectors.
8. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.
3.6 OPERATION AND MAINTENANCE MANUAL PREPARATION
A. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.
B. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
1. Prepare supplementary text if manufacturers' standard printed data are unavailable and where the information is necessary for proper operation and maintenance of equipment or systems.
C. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams.
3.7 DEMONSTRATION AND TRAINING
A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. Include a detailed review of the following:
1. Include instruction for basis of system design and operational requirements, review of documentation, emergency procedures, operations, adjustments, troubleshooting, maintenance, and repairs.
END OF SECTION 017000
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
A. Action Submittals:
1. Waste Management Plan: Submit plan within seven (7) days of date established for commencement of the Work.
B. Informational Submittals:
1. Waste Reduction Progress Reports: Submit concurrent with each Application for Payment.
Include total quantity of waste, total quantity of waste salvaged and recycled, and percentage of total waste salvaged and recycled.
2. Records of Donations and Sales: Receipts for salvageable waste donated or sold to individuals and organizations. . Indicate whether organization is tax exempt.
3. Recycling and Processing Facility Records: Manifests, weight tickets, receipts, and invoices.
4. Landfill and Incinerator Disposal Records: Manifests, weight tickets, receipts, and invoices.
5. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations.
C. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.
D. Waste Management Conference: Conduct conference at Project site to comply with requirements in Section 013000 "Administrative Requirements." Review methods and procedures related to waste management.
E. Waste Management Plan: Develop a waste management plan consisting of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.
1. Salvaged Materials for Reuse: Identify materials that will be salvaged and reused.
2. Salvaged Materials for Sale: Identify materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: Identify materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
5. Cost/Revenue Analysis: Indicate total cost of waste disposal as if there was no waste management plan and net additional cost or net savings resulting from implementing waste management plan.
2.1 PERFORMANCE REQUIREMENTS
A. Achieve end-of-Project rates for salvage/recycling of 50 percent by weight of total nonhazardous solid waste generated by the Work.
3.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.
1. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work: Clean salvaged items and install salvaged items to comply with installation requirements for new materials and equipment.
B. Salvaged Items for Sale and Donation are: Permitted at the sole discretion of the CO on Project site.
C. Salvaged Items for Owner's Use: Clean salvaged items and store in a secure area until delivery to Owner.
D. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.
E. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs.
F. Plumbing Fixtures: Separate by type and size.
G. Lighting Fixtures: Separate lamps by type and protect from breakage.
3.3 RECYCLING WASTE
A. General: Recycle paper and beverage containers used by on-site workers.
B. Packaging:
1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
2. Polystyrene Packaging: Separate and bag materials.
3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.
4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.
C. Concrete: Remove reinforcement and other metals from concrete and sort with other metals.
1. Pulverize concrete to maximum 4-inch (100-mm) size.
D. Masonry: Remove metal reinforcement, anchors, and ties from masonry and sort with other metals.
1. Pulverize masonry to maximum 1-1/2-inch (38-mm) size.
2. Clean and stack undamaged, whole masonry units on wood pallets.
E. Wood Materials:
1. Sort and stack reusable members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.
2. Clean Cut-Offs of Lumber: Grind or chip into small pieces.
3. Clean Sawdust: Bag sawdust that does not contain painted or treated wood.
F. Metals: Separate metals by type.
G. Asphalt Shingle Roofing: Remove and dispose of nails, staples, and accessories.
H. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners.
I. Acoustical Ceiling Panels and Tile: Stack large clean pieces on wood pallets and store in a dry
J. Metal Suspension System: Separate metal members including trim, and other metals from acoustical panels and tile and sort with other metals.
K. Carpet and Pad: Roll large pieces tightly after removing debris, trash, adhesive, and tack strips.
1. Store clean, dry carpet and pad in a closed container or trailer provided by Carpet Reclamation Agency or carpet recycler.
L. Piping: Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size.
M. Conduit: Reduce conduit to straight lengths and store by type and size.
3.4 DISPOSAL OF WASTE
A. Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
B. Do not burn waste materials.
END OF SECTION 017419
SECTION 024119 – SELECTIVE DEMOLITION
A. Items indicated to be removed and salvaged (doors and all door appurtenances) remain Owner's property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner. Include fasteners or brackets needed for reattachment elsewhere.
B. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.
C. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
D. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify Contracting Officers Representative (COR) and CO. Hazardous materials will be removed by Owner under a separate contract.
2.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
3.1 DEMOLITION
A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.
B. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
C. Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction.
D. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
E. Protect walls, ceilings, floors, and other existing finish work that are to remain. Erect and maintain dustproof partitions. Cover and protect furniture, furnishings, and equipment that have not been removed.
F. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
G. Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.
H. Requirements for Building Reuse:
1. Maintain existing building structure (including structural floor and roof decking) and envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.
2. Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.
I. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
J. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.
K. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
SECTION 079200 - JOINT SEALANTS
A. Submittals: Product Data and color Samples.
B. Environmental Limitations: Do not proceed with installation of joint sealants when ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below (4.4 degrees C).
2.1 JOINT SEALANTS
A. Low-Emitting Materials: Sealants shall comply with Section 018113.13 - Sustainable Design Requirements - LEED 2009 for New Construction and Major Renovations.
B. Compatibility: Provide joint sealants, joint fillers, and other related materials that are compatible with one another and with joint substrates under service and application conditions.
C. Sealant for Use in Building Expansion Joints[, One of the Following]:
1. Single-component, neutral-curing silicone sealant, ASTM C 920, Type S; Grade NS;
Class 50; for Use NT.
2. Single-component, neutral-curing silicone sealant, ASTM C 920, Type S; Grade NS;
Class 100/50; for Use NT.
D. Sealant for General Exterior Use Where Another Type Is Not Specified
1. Single-component, neutral-curing silicone sealant, ASTM C 920, Type S; Grade NS;
Class 25; for Use NT.
E. Sealant for Exterior Traffic-Bearing Joints, Where Slope Precludes Use of Pourable Sealant:
1. Single-component, nonsag urethane sealant, ASTM C 920, Type S; Grade NS; Class 25;
for Use T.
F. Sealant for Exterior Traffic-Bearing Joints, Where Slope Allows Use of Pourable Sealant:
1. Single-component, pourable urethane sealant, ASTM C 920, Type S; Grade P; Class 25;
for Use T.
G. Sealant for Interior Use at Perimeters of Door and Window Frames:
1. Acrylic latex or siliconized acrylic latex, ASTM C 834, Type OP, Grade NF.
H. Acoustical Sealant:
1. Nonsag, paintable, nonstaining latex sealant complying with ASTM C 834 that effectively reduces airborne sound transmission as demonstrated by testing according to ASTM E 90.
2.2 MISCELLANEOUS MATERIALS
A. Provide sealant backings of materials that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C 1330, of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.
D. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
3.1 INSTALLATION
A. Comply with ASTM C 1193.
B. Install sealant backings to support sealants during application and to produce cross-sectional shapes and depths of installed sealants that allow optimum sealant movement capability.
C. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.
D. Acoustical Sealant Installation: At sound-rated assemblies and elsewhere as indicated, seal perimeters, control joints, openings, and penetrations with a continuous bead of acoustical sealant.
Install acoustical sealant at both faces of partitions. Comply with ASTM C 919.
END OF SECTION 079200
SECTION 081613 - FIBERGLASS DOORS
A. Submittals: Include the following information:
a) Name, part number and manufacturer of each item.
b) Required fastenings and other pertinent information.
c) Location of doors coordinated with floor plans and door schedule.
d) Explanations of abbreviations, symbols and codes contained in schedule.
e) Door and frame sizes, materials and degree of swing.
f) Catalog cuts.
g) Furnish as-built/as-installed schedule with closeout documents, including keying schedule, wiring/riser diagrams, manufacturers’ installation, adjustment and maintenance information and supplier’s final inspection report.
B. Warranties: Manufacturer's standard written warranty, signed by manufacturer agreeing to promptly repair or replace products that fail in materials or workmanship for the life of the installation.
2.1 FIBERGLASS DOORS
A. Performance Requirements: Comply with ENERGY STAR product labeling program.
1. Acceptable Products: Special-Lite AF-100 Pultruded Door in AF 150 Frame in width listed in Door Schedule and details in drawings.
B. Meet Net-Zero requirements of the USDA Forest Service, Sustainability Program.
C. Faces: Fiberglass-reinforced plastic, pultruded to panel configuration indicated, with smooth finish.
D. Stiles, Rails, and Blocking: Structural fiber reinforced plastic, not less than 1-1/4-inch- (32-mm- ) wide stiles and 2-1/2-inch- (63-mm-) wide rails. Provide 20-inch (508-mm) lock blocks.
E. Core: Polyurethane foam.
1. Provide minimum 6 lb/cu.ft. density foam
F. Glass: Uncoated, clear, insulating-glass units made from two lites of 3.0-mm-thick, fully tempered glass with 1/4-inch (6.4-mm) interspace.
G. Factory-fit doors to suit frame-opening sizes indicated and to comply with clearances specified.
1. Provide 1/8-inch (3.2-mm) clearance at jambs, heads, and meeting stiles. At thresholds, provide (9.5-mm) clearance.
2. Comply with NFPA 80 for fire-resistance-rated doors.
H. Factory-machine doors for hardware that is not surface applied. Locate hardware to comply with
DHI-WDHS-3.
I. Factory-finish doors with manufacturer's standard opaque finish.
1. Match color of existing door with locally applied final finish.
A. Install doors level, plumb, true, and aligned with frames with uniform clearances.
B. Align and fit doors in frames with uniform clearances and bevels.
END OF SECTION 081613
SECTION 087100 - DOOR HARDWARE
A. Allowances: Door hardware is included in Hardware Allowance.
B. Submittals: Hardware schedule and keying schedule.
Include the following information:
a) Type, style, function, size, quantity and finish of hardware items.
b) Name, part number and manufacturer of each item.
c) Fastenings and other pertinent information.
d) Location of hardware set coordinated with floor plans and door schedule.
e) Explanations of abbreviations, symbols and codes contained in schedule.
f) Mounting locations for hardware.
g) Door and frame sizes, materials and degree of swing.
h) Catalog cuts.
i) Substitutions will be in accordance to Section 3.2A
a. Include product data and indicate benefit to the project.
b. Furnish operating samples on request.
j) Furnish as-built/as-installed schedule with closeout documents, including keying schedule, wiring/riser diagrams, manufacturers’ installation, adjustment and maintenance information and supplier’s final inspection report.
2.1 HARDWARE
A. Fire-Resistance-Rated Assemblies: Provide products that comply with NFPA 80 and are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction for applications indicated. On exit devices provide label indicating "Fire Exit Hardware."
B. Hinges:
1. Stainless-steel hinges with stainless-steel pins for exterior.
2. Nonremovable hinge pins for exterior and public interior exposure.
3. Ball-bearing hinges for doors with closers and entry doors.
4. Three hinges for 1-3/4-inch- (45-mm-) thick or FRP doors 80 inches (2032 mm) or less in height; four hinges for doors more than (2300 mm) in height.
C. Locksets and Latchsets:
1. ANSI A156.3, Grade 1 for exit devices.
2. ANSI A156.12, Series 5000, [Grade 1] for interconnected locks and latches.
3. ANSI A156.13, Series 1000, [Grade 1] for mortise locks and latches.
4. Lever handles on locksets and latchsets, Duprin 99.
5. Provide trim on exit devices matching locksets.
D. Key locks to Owner's existing master-key system.
1. Cylinders with six-pin tumblers.
2. Provide cylinders for Exterior doors, and other locking doors that do not require other hardware.
3. Provide construction keying.
E. Closers:
1. Mount closers on interior side (room side) of door opening. Provide regular-arm, parallel-arm, or top-jamb-mounted closers as necessary.
2. Adjustable delayed opening (accessible to people with disabilities) feature on closers.
F. Provide wall stops or floor stops for doors without closers.
G. Provide Aluminum Threshold: Heavy-duty ADA approved aluminum threshold, 5” x 1/2” thick.
This is noted as Aluminum Threshold 1 in the drawings.
H. Hardware Finishes
1. Hinges: Matching finish of lockset/latchset].
2. Locksets, Latchsets, and Exit Devices: Stainless Steel.
3. Closers: Stainless Steel
I. Submit for review products with equivalent function and features of scheduled products below.
A. Mount hardware in locations required to comply with governing regulations and according to SDI A250.8 and DHI WDHS.3.
B. Deliver keys to Owner.
3.2 HARDWARE SCHEDULE
A. Hardware Set No.1 :
ITEM: (ABBRV) MANUFACTURER ACCEPTABLE
SUBSTITUTION
Hinges Locks Keying Exit Devices
(IVE) Ives (SCH) Schlage (SCH) Schlage (VON) Von Duprin
Stanley, Hager None None None
Closers (LCN) LCN None Silencers (IVE) Ives Hager, Trimco Push and Pull Plates (IVE) Ives Hager, Trimco Kickplates (IVE) Ives Hager, Trimco Stops and Holders (IVE) Ives Hager, Trimco Overhead Stops (GLY) Glynn-Johnson Rixon Threshold (NGP) National Guard Pemko Seals & Bottom (NGP) National Guard Pemko
B. Provide hardware items required to complete the work in accordance with these specifications and manufacturer’s instructions.
1. Include items inadvertently omitted from the specification but necessary for a complete installation. Note these items in submittal for review
2. Where an item is out of date or no longer manufacturer provide the updated item from the manufacturer or approved equal at no additional charge to the project.
3. Hinges.
4. Locks, latches, panic bars.
5. Closer.
6. Threshold and weather stripping.
END OF SECTION 087100
SECTION 087113 - AUTOMATIC DOOR OPERATORS
A. Submittals: Product Data, Shop Drawings and maintenance data.
B. Installer Qualifications: Installer who is approved by manufacturer.
2.1 DOOR OPERATORS AND ACCESSORIES
A. Swinging Door Operators: Overhead concealed operator with electromechanical operating system.
1. Type: Low-energy door operators complying with BHMA A156.19 and requirements for means of egress in the IBC.
2. Provide emergency breakaway feature for reverse swing of doors.
3. Provide listed and labeled door operators for fire-rated door assemblies according to
NFPA 80.
4. Wind Load: Provide door operators on exterior doors that will open and close doors and maintain them in fully closed position when subjected to wind load of 45 mph.
B. Cover for Surface-Mounted Operators: Extruded or formed continuous over full width of door opening including door jambs; with enclosed end caps and maintenance access.
C. Operator Controls: According to BHMA standards.
1. Activation Device: Push-plate switch on ingress side
2. Safety Device: Presence sensor mounted on door header.
D. Signage: As required by cited BHMA standard for the type of operator.
E. Guide Rails: Stainless steel, fabricated from bars or tubing], minimum (762 mm) high, and finished to match doors unless otherwise indicated.
1. Filler Panel: Expanded aluminum mesh.
2. Provide intermediate guide rail suitable for supporting photoelectric beams.
3. Mounting: Jamb and floor.
F. Exposed Finish: Finish matching door hardware Stainless Steel.
1. Color: Natural SS.
2.2 ELECTRONIC KEY ACCESS FOR DOOR 107
A. Door 107 has an electronic key access system. This system must be deactivated before installation of the door. System must be installed along with the new fiberglass door and returned to working order. Coordinate with CO for deactivation of electronic keycard system before construction.
A. Install power door operators and controls according to cited BHMA standard.
1. Power Door Operator Installation Standard: BHMA A156.10.
2. Low-Energy Door Operator Installation Standard: BHMA A156.19.
B. Guide Rails: Install according to BHMA A156.10, including Appendix A and manufacturer's written instructions, unless otherwise indicated. Securely anchor guide rails level and true to
C. Signage: Apply on both sides of each door as required by cited BHMA standard for type of door operator and direction of pedestrian travel.
D. Test and inspect components, assemblies, and installations, including connections.
E. After three days' use by normal traffic (100 to 300 cycles), readjust door operators and controls and lubricate hardware and moving parts.
F. Occupancy Adjustment: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two (2) visits to Project for this purpose.
END OF SECTION 087113