SEADC_Door_Replacement_Q&A_2.pdf

PDF 38 KB Posted

Attached to
Southeast Alaska Discover Center (SEADC) Door Replacement Federal contract opportunity
Solicitation number
AG-0112-S-17-0013
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Question and Answer - Second

View the file

Other files for this federal contract opportunity

Other files attached to Southeast Alaska Discover Center (SEADC) Door Replacement, newest first.
File Type Posted
AG0112S170013Amd1.pdf PDF
SEADC_Door_Replacement_Q&A_3.pdf PDF
SEADC_Door_Replacement_Pre-Proposal_Questions.pdf PDF
AG0112S170013SeadcDoorReplac.pdf PDF
SEADC_Doors_Specifications.pdf PDF
SEADC_DOOR_REPLACEMENT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEADC Door Replacement Solicitation #AG-0112-S-17-0013 July 7, 2017

Question: Is it necessary to salvage the existing door jambs in the demolition process? It makes a big difference in the labor involved if I do and therefore in my bid.

Response: The contractor will replace the door, door frame and associated thresholds and kick plates. In the bid submittal, the contractor shall specify the proposed door type, door frame, automatic door openers and hardware. The hardware set required is shown in Section 3.2 Part A of the Contract Specifications. Therefore, during the demolition process, it is not required to salvage the existing door jambs.

File details come from the government source that posted it. Updated .