TongassLTFRecon5-30-14.pdf

PDF 3 MB Posted

Attached to
Tongass Log Transfer Facility (LTF) Reconstruction Federal contract opportunity
Solicitation number
AG-0112-S-14-0014
Issued by
Department of Agriculture Forest Service R10-Alaska Region

View the file

Other files for this federal contract opportunity

Other files attached to Tongass Log Transfer Facility (LTF) Reconstruction, newest first.
File Type Posted
0112-S-14-0014Amd7.pdf PDF
0112-S-14-0014Amd6.pdf PDF
0112-S-14-0014Amd5.pdf PDF
0112-S-14-0115Q A1.pdf PDF
0112-S-14-0014Amd4.pdf PDF
0112-S-14-0014Amd3.pdf PDF
Request_for_Information__1_Answers.docx DOCX document
0112-S-14-0014Amd2.pdf PDF
0112-S-14-0014Amd1.pdf PDF
FsssTongLtfRecon.pdf PDF
AG-0116-S-14-0014TongLtfRecon140523.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TONGASS LTF

RECONSTRUCTION

INDEX TO SHEETS

NO. DESCRIPTION

2-4 5-7 10-12 15-17 18-20 22-23

COVER SHEET

PROJECT SITES LOCATIONS MAPS

REFERENCE FLOATING LOG SLIDE (NIC)

EXISTING SUNKEN LOG SLIDE

FLOATATION REPAIRS

SHELTER COVE

SHELTER COVE DETAILS

UPPER CARROLL

FIRE COVE

SW NEETS

RAMP SECTION AND PIPE PILE SKIDS

PIPE PILE SKID DETAILS

SETTLING BASIN OUTLET PIPE DETAILS

QUARRY DEVELOPMENT PLAN

EROSION CONTROL DEVICES

138°140°142°

JUNEAU

Craig

132°

KEY MAP56°

58°

Sitka

138°

60°

Yakutat

ALAS

KA

142°

62°

C

AN

AD

A

140°

Skagway

136° 134°

56°

54°

Ketchikan

Wrangell

Petersburg

60°

58°

130°

PROJECT LOCATION

138°140°142°

JUNEAU

Craig

132°

KEY MAP56°

58°

Sitka

138°

60°

Yakutat

ALAS

KA

142°

62°

C

AN

AD

A

140°

Skagway

136° 134°

56°

54°

Ketchikan

Wrangell

Petersburg

60°

58°

130°

PROJECT LOCATION

N

N

FLOATING LOG SLIDE

BARGE AND

EQUIPMENT RAMP

ROCK

OUTCROP

WEST ARM CHOLMONDELEY LTF SITE

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION UPPER CARROLL AND SHELTER COVE LOCATION

KMRD

MRC 4/24/14

VH, QS 4/30/14 ACAD.DWG

3 26

132°136°138°140°142° 134°

JUNEAU

Craig

132°

KEY MAP

GULF OF ALASKA

56°

58°

Sitka

138°

60°

Yakutat

ALAS

KA

142°

62°

C

AN

AD

A

140°

Skagway

136° 134°

56°

54°

Ketchikan

Wrangell

Petersburg

60°

58°

130° 128°

PROJECT LOCATION

UPPER CARROLL LTF SITE SHELTER COVE LTF SITE

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SW NEETS AND FIRE COVE LOCATION

KMRD

MRC 4/24/14

VH, QS 4/30/14 ACAD.DWG

4 26

132°136°138°140°142° 134°

JUNEAU

Craig

132°

KEY MAP

GULF OF ALASKA

56°

58°

Sitka

138°

60°

Yakutat

ALAS

KA

142°

62°

C

AN

AD

A

140°

Skagway

136° 134°

56°

54°

Ketchikan

Wrangell

Petersburg

60°

58°

130° 128°

PROJECT LOCATION

FIRE COVE LTF SITE

16 15

30 29

T 70 S

T 71 S

16 15

9 10 11

7 8

181314

T 70 S

T 71 S

R

E

R

E 31

SW NEETS LTF SITE

NOTE 1

NOTE 2

NOTE 3

CUT CABLE WRAP CONNECTION

APPROXIMATE LOCATION OF +1 TIDE

SALVAGED LOG SLIDE TO BE MOVED

TO THORNE BAY LTF/SORTYARD

LOCATION DIRECTED BY COR.

NOTES:

1. LOG SLIDE TO BE SALVAGED AND PLACED ON THORNE BAY

LTF/SORTYARD AS DIRECTED BY COR.

2. FURNISH NEW CONCRETE ANCHORS AND CHAINS PER

ORIGINAL DESIGN, TO BE PLACED WITH LOG SLIDE ON THORNE

BAY LTF/SORTYARD AS DIRECTED BY COR. SEE SHEET 5

NOTES 2 AND 3.

3. FLOATATION NOT SHOWN. FLOATATION WORK ON SHEET 9.

4. TOTAL STEEL DRY WEIGHT APPROXIMATELY 65 TONS.

5. EXISTING ATTACHED FLOATATION MAY BE WATERLOGGED,

ADDING UP TO 6 TONS DRY WEIGHT PER WATERLOGGED

FLOAT.

6. SUBMERGED CONCRETE ANCHORS (DRY WEIGHT 9.4 TONS)

MAY BE ATTACHED.

CLEAN SUBMERGED SURFACES OF

ALL MARINE ORGANISM GROWTH

DETACH EXISTING BACKSTAY CABLES.

CABLES TO BECOME PROPERTY OF

CONTRACTOR AND REMOVED FROM

FOREST SERVICE LAND APPROPRIATELY.

FURNISH NEW CABLES 2X 150FT EA, PER

SPECS IN NOTE 1 ON SHEET 5.

DETACH CONCRETE ANCHORS IF ANY ATTACHED.

REPLACE ALL EXISTING HDPE FLOATS WITH NEW 36" DIA. X 34' LENGTH SEALED

CELLULAR FOAM FILLED HDPE FLOATS ENDS SEALED BY FULL SURFACE FUSION

WELDS. AFFIX TO PLATFORM BY BENT BOLT RODS (6 PER FLOAT) REFER TO

APPENDED IMAGE 1. 13 FLOATS TOTAL. PLACE REPLACED EXISTING HDPE

FLOATS ON THORNE BAY LTF AREA DESIGNATED BY COR.

REPLACE EXISTING 36" STEEL FLOATS WITH NEW 36" DIA. 1

2" WALL STEEL

FLOATS. STEEL FLOATS TO BE FOAM FILLED. 2 FLOATS TOTAL, 34' LENGTH.

PLACE REPLACED EXISTING STEEL FLOATS ON THORNE BAY LTF AREA

DESIGNATED BY COR.

-4

-3

-2

-1

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SHELTER COVE EXISTING GROUND

KMRD

MRC 4/18/14

VH, QS 4/30/14 ACAD.DWG

10 26

LOG BULKHEAD

DETERIORATED,

CONTOURS MAY

BE INACCURATE

APPROACH ROAD

CMP

SETTLING

BASIN

MONUMENT 1

MONUMENT 2

RAMP TO DOCK (NOT SHOWN)

EQUIPMENT RAMP NEARBY,

OFF SHEET.

BP: 0+00.00

PC: 0+71.88

Mid: 0+79.54

PT: 0+87.19

EP: 2+37.35

N4 7° 0' "E

5.

N ' 1 "W

.6

N20° 04' 26.71"W 71.88

N34° 41' 42.47"W 150.16

REMOVE EXISTING CMP. EXISTING

CMP TO BECOME PROPERTY OF THE

CONTRACTOR AND APPROPRIATELY

REMOVED FROM NATIONAL FOREST.

CLEAN SETTLING

BASIN

MONUMENT 1

MONUMENT 2

CLASS 6 RIPRAP ARMOR ALL

RAMP CUT AND FILL SLOPES

NOTES:

1. CLEAR AND GRUB LTF SURFACE. FP-03 SECT. 201

2. END HAUL CLEARING/GRUBBING WASTE TO WASTE SITE WITHIN 3

MILES RADIUS DESIGNATED BY CO/COR.

3. MAINTAIN 2% GRADE ON LTF DRAINING TOWARDS EXISTING SETTLING

BASIN. RAMP WILL NOT DRAIN TO SETTLING BASIN.

4. ALL CUT SLOPES TO BE 1:1

5. ALL FILL SLOPES TO BE 1.25:1

6. SEE SHEET 13 FOR RAMP TYPICAL SECTION

7. SEE SHEET 13 FOR SHOT ROCK BERM TYPICAL

8. SEE SHEET 22 FOR QUARRY DEVELOPMENT

9. MAY ENCOUNTER BEDROCK REQUIRING BLASTING DURING

EXCAVATION FOR RAMP.

5. GOVERNMENT DOES NOT CERTIFY ACCURACY OF APPROXIMATE

QUANTITIES STATED ON DRAWING. SHOT ROCK BERM

ON SITE ROCK SOURCE

ON SITE STOCK PILE AREA FOR

EXCAVATED RAMP FILL SHOT ROCK.

RAISE EXISTING LTF SURFACE 1 FT. COMPACTION

METHOD B. APPROXIMATELY 1000 CY FILL.

MAINTAIN EXISTING DRAINAGE TOWARDS

SETTLING BASIN. NO ROCK LARGER THAN 6" IN

TOP 6" OF SURFACE.

FEATHER RAMP TO RAISED

LTF INTERFACE GRADE NOT

TO EXCEED 10%.

FEATHER ROAD TO RAISED

LTF INTERFACE. GRADES

NOT TO EXCEED 10%

INSTALL NEW SETTLING BASIN OUTLET

PIPE, APPROX 108FT LENGTH. SEE

SHEET 24 FOR DETAIL.

CONSTRUCT NEW 55FT WIDE

RAMP. APPROXIMATELY

4670 BCY CUT.

TYPICAL SETTLING BASIN DRAIN PIPE INSTALLATION

CLASS 6 RIPRAP ARMOR CUT AND FILL SLOPES.

RIPRAP ARMOR AT LEAST TWO STONES DEEP.

2% CROWN

1.25:1 FILL SLOPES

RAMP SURFACE: CLEAN SHOT ROCK NO

MATERIAL LARGER THAN 6" WITHIN TOP

6", COMPACTION METHOD B

CLEAN SHOT ROCK,

COMPACTION METHOD B

2% CROWN

NOTES:

1. ROCK BERM FILL SLOPES SHALL BE 1.25:1.

6" MINUS ROCK

LTF SURFACE

SHOT ROCK BERM DETAIL

SHELTER COVE RAMP TYPICAL SECTION

1:1 CUT SLOPES

-30 -20 -10 0 10 2

30 40 50 60 70 80

-1 0-2

N61° 11'W

52'

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION UPPER CARROLL

KMRD

MRC 4/23/14

MRC 4/23/14

VH, QS 4/30/14

5/20/14 SETTLING BASIN MRC

ACAD.DWG

14 26

MONUMENT 1

MONUMENT 3

SLIDE OCCURED SINCE SURVEY. ROAD HAS BEEN

REPAIRED. CONTOURS MAY NOT BE ACCURATE

HERE. NEARBY MONUMENTS MAY NOT EXIST.

CREEK

ACCESS RAMP

NOTES:

1. CLEAR AND GRUB LTF SURFACE WHERE BRUSH IS

FOUND.

2. SEE SHEET 25 FOR QUARRY DEVELOPMENT.

3. APPROXIMATELY 20-30 CY SLIDE MATERIAL ON LTF TO

BE END HAULED TO DESIGNATED WASTE SITE.

4. DESIGNATED WASTE DISPOSAL SITE LOCATED WITHIN 3

MILES TO BE DETERMINED BY CO/COR.

5. GOVERNMENT DOES NOT CERTIFY ACCURACY OF

APPROXIMATE QUANTITIES STATED ON DRAWING.

MONUMENT 2

BULKHEAD HAS DECAYED, NO

LONGER EXISTS. CONTOURS

MAY BE INACCURATE.

ON SITE ROCK SOURCE

NEW DRAINAGE DITCH AROUND BACK OF LTF, 2FT

DEEP 4FT WIDE, APPROX. 180FT LENGTH. DRAIN 2%

TOWARDS NEW SETTLING BASIN, SOUTH.

2%

2%

2%

RECONTOUR SURFACE OF LTF TO DRAIN UNIFORMLY 2%

TOWARDS NEW DRAINAGE DITCH. SCALP SURFACE ROCK

FROM EAST SIDE OF LTF AND MOVE TO WEST SIDE OF

LTF. RECOMPACT NEW LTF SURFACE METHOD B.

APPROXIMATELY 500 CY MATERIAL TO BE MOVED.

NEW SETTLING BASIN, 20' X 10' X 5' DEPTH. 1:1 CUT SLOPE.

NEW SETTLING BASIN DRAIN PIPE.

LENGTH APPROX. 85'. DRAIN 2%

TOWARDS OCEAN. SEE SHEET 24.

CONSTRUCT NEW

SHOT ROCK BERM.

CONSTRUCT NEW

SHOT ROCK BERM.

FUTURE PROPOSED LOG

SLIDE LOCATION

-40 -30

-20

-10

-10010

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION FIRE COVE EXISTING GROUND

KMRD

MRC 4/22/14

VH, QS 4/30/14 ACAD.DWG

15 23

15% ACCESS RAMP

EQUIPMENT RAMP

RAMP TO DOCK

PERIMETER DRAINAGE DITCH

MONUMENT 1

MONUMENT 3

MONUMENT 2

PARKING AREA

LOG BERM

BP: 0+00.00

EP: 1+52.87

N3 7° 9' 3" E

2.

N3 1° 1' 2" E

.6

8' N57° 41' 41"W 254.48'

25 FT

65 FT

-10

-20

-40

-3

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION FIRE COVE RAMP AND BULKHEAD

KMRD

MRC 4/23/14

MRC 4/23/14

VH, QS 4/30/14

5/16/14 LD, DLM COMMENTS MRC

ACAD.DWG

16 26

CONSTRUCT NEW 25' WIDE, 15% GRADE RAMP

WITH 65' CLEAR WIDTH FOR LOG BUNDLES.

REFER TO SHEET 21 FOR TYPICAL SECTION.

APPROXIMATELY 2100 BCY CUT.

EQUIPMENT RAMP

RAMP TO DOCK

FILL EXISTING RAMP THROUGH CUT (OUTSIDE NEW RAMP)

TO EXISTING LTF SURFACE WITH CLEAN SHOT ROCK

COMPACT METHOD B. MAINTAIN GRADATION TOWARDS

DITCH.

MONUMENT 1

MONUMENT 3

MONUMENT 2

PARKING AREA

MODIFY LOG BERM AS NECESSARY.

INSTALL STEEL PIPE PILE LOG

SKIDS ALONG LENGTH OF RAMP.

SEE SHEETS 21-23 FOR DETAIL.

CLASS 6 RIPRAP ARMOR ALL CUT AND FILL

SLOPES IN CONTACT WITH OCEAN AT HIGH TIDE.

NOTES:

1. END HAUL WASTE TO DESIGNATED WASTE SITE

WITHIN 1 MILE. WASTE SITE TO BE DESIGNATED BY

CO/COR.

2. RAMP EXCAVATION MAY ENCOUNTER BED ROCK

REQUIRING INCIDENTAL BLASTING.

3. ALL FILL SLOPES TO BE 1.25:1

4. SEE SHEET 25 FOR QUARRY DEVELOPMENT

5. GOVERNMENT DOES NOT CERTIFY ACCURACY OF

APPROXIMATE QUANTITIES STATED ON DRAWING.

RELOCATE EXISTING DITCH

TO EDGE OF LTF. DITCH TO

BE 2FT DEEP 4FT WIDE.

CLEAR AND GRUB BRUSHY AREA ON LTF

FILL EXISTING DITCH NOT AT

EDGE OF LTF.

CONSTRUCT NEW SETTLING BASIN,

10FT X 15FT AREA, 5FT DEEP.

INSTALL 43FT SETTLING BASIN OUTLET PIPE. SEE

SHEET 11 (BOTTOM LEFT) AND SHEET 24. FOR DETAIL.

FIRE COVE RAMP PROFILE

-5

-5

0+00 1+00 2+00

-14.85%

G R A D

E B R

EA

K S

TA

.0

EL

EV

.6

G R A D

E B R

EA

K S

TA

.8

EL

.0

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION FIRE COVE RAMP PROFILE

KMRD

MRC 4/23/14

MRC 4/23/14

VH, QS 4/30/14

5/16/14 LD, DLM COMMENTS MRC

ACAD.DWG

17 26

S37° 55' 08.86"E

284.46'

-10 -20

-30 -40

-1

-20

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SW NEETS EXISTING GROUND

KMRD

MRC 4/24/14

VH, QS 4/30/14 ACAD.DWG

18 26

15% ACCESS RAMP, CONTOURS

ESTIMATED, LOCATION MAY NOT

BE ACCURATE.

SETTLING BASIN WITH CMP

MONUMENT 1

MONUMENT 2

LOG BERM

TO MONUMENT 3

WASTE AREA

PREVIOUS EQUIPMENT RAMP

EXISTING DRAINAGE

STREAM

CMP

S37° 55' 09"E

284.46'

BP: 0+00.00

EP: 1+65.70

N ' 4 "E

.7

-10

-20

-30

S14° 08' 45"E 103.71'

SCALE IN FEET

50 0 50 100

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SW NEETS RAMP AND BULKHEAD

KMRD

MRC 4/23/14

MRC 4/24/14

VH, QS 4/30/14

5/21/14 LD, DLM COMMENTS MRC

ACAD.DWG

19 26

CLEAN EXISTING SETTLING

BASIN AND ASSOCIATED CMP

MONUMENT 1

MONUMENT 2

MODIFY LOG BERM AS NECESSARY.

TO MONUMENT 3

DESIGNATED WASTE

AREA ON SITE

STREAM

CMP

CLASS 6 RIPRAP ARMOR ALL CUT AND FILL

SLOPES IN CONTACT WITH OCEAN AT HIGH TIDE.

CONSTRUCT 270FT NEW DITCH AT EDGE

OF LTF. DITCH TO BE 2FT DEEP 4FT WIDE.

CONSTRUCT NEW 25' WIDE, 15% GRADE

RAMP WITH 65' CLEAR WIDTH FOR LOG

BUNDLES. REFER TO SHEET 21 FOR TYPICAL

SECTION. APPROXIMATELY 2360 BCY CUT.

FILL REMAINING EXISTING RAMP THROUGHCUT.

NOTES:

1. CLEAR AND GRUB LTF SURFACE.

2. DESIGNATED WASTE AREA ON SITE.

3. ADDITIONAL DESIGNATED WASTE AREA WITHIN 3 MILES OF SITE.

4. ALL FILL SLOPES TO BE 1.25:1.

5. SEE SHEET 25 FOR QUARRY DEVELOPMENT.

6. MAJOR SLIDE ON ROAD NEAR WITHIN 14 MILE OF LTF. SLIDE PLANNED

TO BE REMOVED SUMMER 2014 (NOT IN THIS CONTRACT).

7. GOVERNMENT DOES NOT CERTIFY ACCURACY OF APPROXIMATE

QUANTITIES STATED ON DRAWING.

FILL EXISTING DITCH

NOT AT EDGE OF LTF.

RECONTOUR SURFACE OF LTF TO DRAIN UNIFORMLY 2% TOWARDS

NEW DRAINAGE DITCH. SCALP SURFACE ROCK FROM EAST SIDE OF

LTF AND MOVE TO WEST SIDE OF LTF. APPROXIMATELY 140 BCY.

RECOMPACT NEW LTF SURFACE METHOD B.

BLAST AND END HAUL ROCK TO

WASTE AREA. APPROXIMATELY 970

BCY CUT. CUT SLOPE TO BE 1.25:1

2%

2%

CUT EXCESS FILL SLOPE OUTSIDE NEW RAMP

CORRIDOR TO ZERO ELEVATION (0). APPROX 60 BCY.

INSTALL STEEL PIPE PILE LOG

SKIDS ALONG LENGTH OF RAMP.

SEE SHEETS 21-23 FOR DETAIL.

SW NEETS RAMP PROFILE

-5

-5

0+00 1+00 2+00

-15.09%

G R A D

E B R

EA

K S

TA

.0

EL

.0

G R A D

E B R

EA

K S

TA

.7

EL

.0

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SW NEETS RAMP PROFILE

KMRD

MRC 4/23/14

MRC 4/23/14

VH, QS 4/30/14

5/21/14 LD, DLM COMMENTS MRC

20 26

PIPE PILE SKIDS CENTERLINE PROFILE VIEW

NTS

65 FT CLEAR WIDTH

25 FT RAMP WIDTH

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION RAMP SECTION AND PIPE PILE SKIDS

KMRD

MRC 4/23/14

MRC 4/23/14

VH, QS 4/30/14

5/16/14 LD, DLM COMMENTS MRC

ACAD.DWG

21 26

FIRE COVE/ SW NEETS RAMP TYPICAL SECTION DETAILS

CLEAN SHOT ROCK FILL, COMPACTION

METHOD B.

RAMP SURFACE SHOT ROCK FILL: NO

MATERIAL LARGER THAN 6" IN TOP 6",

COMPACTION METHOD B

2:1 CUT SLOPE

CLASS 6 RIPRAP ARMORED CUT SLOPE,

RIPRAP ARMOR AT LEAST TWO STONES DEEP.

CLASS 4 OR CLASS 5 RIPRAP MAY BE USED IF

CUT SLOPE AREA NOT IN CONTACT WITH

WATER AT HIGH TIDE.

2% SLOPE FROM CENTER

STEEL PIPE PILE SKIDS

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION PIPE PILE SKIDS DETAILS

KMRD

K.ELMORE

MRC 5/22/14

22 26

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION PIPE PILE SKIDS DETAILS

KMRD

K. ELMORE

MRC 5/22/14

23 26

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

TONGASS LTF RECONSTRUCTION SETTLING BASIN OUTLET PIPE DETAIL

KMRD

K. ELMORE 10/12/07

K. ELMORE 10/15/07

M. PETERSON 10/29/07

5/22/14 TONGASS LTF RECON MRC

ACAD.DWG

24 26

1/4 1/4

12" Ø, 1/4" WALL THICKNESS STEEL PIPE, NOT GALVANIZED

TYPICAL FLANGE CONNECTION BOLTED TOGETHER

39'-0", TYPICAL PIPE LENGTH BETWEEN FLANGE PLATES

12" Ø, 1/4" WALL

THICKNESS

3/8" THICK, 1'-6" FLANGE PLATES,

MATE FLANGE PLATES TOGETHER AND BOLT

PLATES TOGETHER WITH SIX - 1/2" Ø, 2" LONG

A-307 BOLTS AND NUTS PER CONNECTION

12" Ø, 1/4" WALL THICKNESS STEEL PIPE, NOT GALVANIZED

3/8" THICK, 1'-6" Ø FLANGE PLATES,

TYP.; SEE DETAIL THIS SHEET

STEEL PIPE, TYP.

TYP.; SEE DETAIL THIS SHEET

12" Ø, 1/4" WALL THICKNESS STEEL PIPE, TYP. NO FLANGE PLATE

ON PIPE OUTLET

3'-1 1/8"

PIPE OUTLET

INSTALL 12" Ø "TEE"

AND RISER PIPE AT

INLET; SEE DETAIL

THIS SHEET

NO SCALE

NO SCALE

NO SCALE

NO SCALE

3/8" THICK, 1'-6" OUTSIDE

DIAMETER STEEL PLATE, TYP.

1'-0" INSIDE DIAMETER HOLE

IN FLANGE PLATES

5/8" DIAMETER HOLES FOR

1/2" DIAMETER BOLTS, TYP.

6 PLACES PER PLATE

1 1/2", TYP.

7 1/2"

NO SCALE

3/8" THICK, 1'-6" OUTSIDE

DIAMETER STEEL PLATE, TYP.

5/8" DIAMETER HOLES FOR

1/2" DIAMETER BOLTS, TYP.

6 PLACES PER PLATE

1 1/2", TYP.

7 1/2"

60°, TYP.

60°, TYP.

12" INSIDE DIAMETER, TYP.

12" DIAMETER "TEE"

1'-0"

3'-0" 3/8"

2"

3/4"

2 - 3/8" THICK, 1'-6"

OUTSIDE DIAMETER

FLANGE PLATES, TYP.

12" Ø RISER PIPE, 1'-6" LONG

1/4

1/41/4

3/8" THICK, 1'-6"

OUTSIDE DIAMETER

FLANGE PLATE AND

CAP PLATE, SEE

3/4" 6"

2"

6"

2"

CUT 2 ROWS OF 6" LONG, 1/2" WIDE

SLITS IN RISER PIPE, SPACED ON 3"

CENTERS AROUND CIRCUMFERENCE

(SIMILAR TO STANDARD WINDOW SCREEN

OF PIPE; COVER SLITS AND TOP OF

PIPE WITH WIRE MESH SCREEN MEETING

REQUIREMENTS FOR 1.18 mm (No. 16)

STANDARD SOIL TEST SIEVE WIRE CLOTH.

WITH 16 OPENINGS PER INCH); ATTACH

SCREEN OVER RISER PIPE WITH 1 3/4"

WIDE, 1/8" THICK METAL BAND,

SEE DETAIL THIS SHEET

NO SCALE

R

TY

P.

1 3/4" 7/8"

1"1"

1/8" THICK, 1 3/4"

WIDE STRAP PLATE

R

1/2" Ø, 1 1/2"

LONG ASTM

A-307 BOLT

AND NUT, TYP.

5/8" Ø HOLES,

TYP.

DETAILS ON THIS

SHEET

1. PIPE SHALL MEET REQUIREMENTS OF ASTM

A-53, TYPE F IN ACCODANCE WITH SECTION 717.

2. STEEL PLATES AND SHAPES SHALL BE ASTM A-36.

ADJUST PIPE SEGMENT LENGTH AS NECESSARY

THIS AREA TO BE CLEARED ONLY IF

ROAD

DEVELOPMENT PLAN

TO THE BACKWALL BENCH.

REHABILITATION PLAN

REQUIREMENT IS WAIVED BY THE COR.

OF THE ACCESS ROAD WITH ROAD NO. 6030 AND BY ROUGHING UP THE ACCESS

THE ACCESS ROAD WILL BE OBLITERATED BY CUTTING A DITCH AT THE JUNCTION

PROVISIONS FOR FUTURE QUARRY ACCESS WILL BE PROVIDED UNLESS THIS

ACCESS ROAD SURFACES, WILL BE SEEDED AND FERTILIZED IN ACCORDANCE WITH

ALL DISTURBED AREAS, SUCH AS OVERBURDEN PILES, BENCH SURFACES, AND

A MINIMUM OF 12-IN OF OVERBURDEN WILL BE EVENLY SPREAD OVER THE

ALL OVERSIZE ROCK WILL BE PLACED AGAINST THE SIDES OF THE QUARRY NEXT

QUARRY DEVELOPMENT PLAN

DECKED IN THE MUSKEG LEFT OF 27+20

ALL MERCHANTABLE TIMBER WILL BE REMOVED FROM THE QUARRY SITE AND

OVERBURDEN WILL NOT BE PLACED IN THE SMALL STREAM BORDERING THE QUARRY.

QUARRY IS LOCATED RIGHT OF STA 27+58 ON ROAD NO. 6030

QUARRY DEVELOPMENT TYPICAL SHEET.

TEST SHOT OF APPROX. 2000 CU. YD. IS PLANNED.

DEVELOPMENT WILL COMPLY WITH THE GENERAL NOTES SHOWN ON THE PIT &

ROAD AND ROAD NO. 6030

CONTAINED BETWEEN THE ACCESS

THE OVERBURDEN CANNOT BE

TIMBER FROM QUARRY SITE

DECKED IN MUSKEG

CLEARING LIMIT FLAGGED

2+720

ROAD SURFACE.

CONTRACTOR DATE

2.

3.

4.

5.

SPECIFICATIONS.

QUARRY FLOOR.

1.

2.

3.

4.

1.

ELEV 1160

APPROX.

OBD

DISTRICT RANGERCOR DATE DATE

40-FT

15-FT MIN

CROSS SECTION VIEW

3% SLOPE

68%

OBD

ACCESS

ROADLC

CL

72%

SOIL

APPROX.

ELEV 1260

OBD

RD. NO. 6030

PLAN VIEW

ESTIMATE OF VOLUME = 24,850 CU. YD.

OVERBURDEN

ACCESS ROAD

STREAM

18-IN CMP

15-FT MIN

TOTAL POUNDS OF POWDER IN SHOT

(INCLUDING PRIMERS) = 3385 lbs.

MAX. POUNDS OF POWDER PER 8 ms DELAY = 1090

POWDER FACTOR = 1 lb. PER CUBIC YARD

NAME OF BLASTER IN CHARGE = T.J. BARRY

PLANNED SHOT DATE = JUNE 15, 1996

NUMBER OF CUBIC YARDS IN SHOT = 2670

"HI DRIVE" PRIMER WITH 125 to 250 ms DU PONT ELECTRIC

BLASTING CAP LOCATED AT

BOTTOM OF HOLE WITH ONE

3-IN x 6-IN STICK OF TOVEX

USED FOR CUSHION.

TYPICAL LOADED HOLE

5-FT STEMMING

3.5-IN DIA HOLE

m s

19,620 CU.YD.

TYPE OF EXPLOSIVES = TOVEX 800, 3" X 16"

SECOND

QUARRY BLASTING PLAN

RIGHT OF STA. 27+58 ON ROAD NO. 6030

THIS PLAN IS FOR THE FIRST TEST SHOT IN THE QUARRY

ACTUAL MILLESECOND DELAY USING

FIRING SEQUENCE - SEQUENCE OF DELAYS

IS THE SAME FOR ALL 5 ROWS

PRODUCTION

STA 27+58

LOCATED IN BOTTOM OF HOLE

TOTAL NUMBER OF HOLES IN SHOT = 45

TYPE OF PRIMER & LOCATION IN HOLE =

STEMMING = 5-FT

BURDEN = 8-FT

DENSITY = 20 lbs./cu. yd.

2" DIA STICK OF HI DRIVE

HOLE DEPTH = 10-FT to 30-FT

BOREHOLE SIZE = 3.5-IN

SPACING = 10-FT

SHOT

SEQUENTIAL TIMER

16 3

SEQUENTIAL TIMER

FR

EE FA

C E m s m s m s m s m s m s m s m s

RD. NO. 6030

PRODUCTION

SHOT

TEST SHOT

13,080 CU.YD.

FIRST

FLOOR

QUARRY

RO

CK F

AC

E

EXIST.

M A X.

15'

MIN

MIN

15'

MIN

15'

CLEARING LIMITS

OVERBURDEN

M A X.

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. 0FR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:02/05

TONGASS LTF RECONSTRUCTION QUARRY DEVELOPMENT PLAN

KMRD AND CRD

SJC 2/24/05

K.BRAY 2/24/05

25 26

NOTES

ALL PITS AND QUARRIES SHALL BE APPROVED IN WRITING BY THE C.O. PRIOR TO

EXPLORATION, CLEARING OR DEVELOPMENT.

REMOVE ALL OVERBURDEN TO SOLID ROCK FOR A MINIMUM DISTANCE OF 15'

FROM THE WORKING FACE.

SLOPE THE CUT BANK OF THE OVERBURDEN TO THE NATURAL ANGLE OF REPOSE

BUT IN NO CASE STEEPER THAN 1:1.

WITHIN THE CLEARING LIMITS:

- MAXIMUM STUMP HEIGHT SHALL BE IN ACCORDANCE WITH SPECIFICATIONS.

- STABLE TREES UP TO 6" dbh NEED NOT BE CUT IF THEY WILL NOT INTERFERE WITH

BACK SLOPE STABILITY.

- STUMPS AND BRUSH MAY BE LEFT IN PLACE, EXCEPT THAT ALL STUMPS THAT

PROTRUDE FROM EXCAVATED BANKS OR THAT HAVE THE POTENTIAL TO BECOME

DISLODGED AT ANY LATER DATE SHALL BE REMOVED.

DISPOSE OF OR STOCKPILE FOR LATER USE ALL OVERBURDEN, CLEARING,

MERCHANTABLE TIMBER AND GRUBBING DEBRIS AS SHOWN ON THE QUARRY

DEVELOPMENT PLAN.

FELL ALL DEAD TREES AND SNAGS WHICH ARE SUFFICIENTLY TALL TO REACH THE

WORK AREA.

LEAVE THE PIT/QUARRY IN A NEAT, ORDERLY AND WELL-DRAINED CONDITION.

REMOVE ALL OVERHANGS AND LOOSE ROCK.

AFTER EXCAVATION IS COMPLETE CLEAN THE AREA AND LEAVE AS SHOWN ON

THE QUARRY DEVELOPMENT PLAN. TREAT ANY ACCESS ROAD AS SHOWN ON THE

QUARRY DEVELOPMENT PLAN.

TEST SHOTS OF 1300 to 2600 CUBIC YARDS ARE REQUIRED AT ALL QUARRY SITES

IF DESCRIBED IN THE SPECIFICATIONS.

LEAVE NO MORE THAN 5% BY VOLUME OF OVERSIZE MATERIAL IN THE QUARRY.

BREAK DOWN ANY MATERIAL OVER THIS VOLUME AND USE AS SPECIFIED IN

SECTIONS 651.

PROVISIONS FOR FUTURE QUARRY DEVELOPMENT ACCESS WILL BE PROVIDED,

UNLESS THIS REQUIREMENT IS WAVED BY THE CO.

INSTALL AND MAINTAIN A COMMERCIALLY AVAILABLE RAIN GAUGE MEASURING IN

UNITS OF INCHES AND FRACTIONS OF INCHES IN ACCORDANCE WITH SECTION

205.08.

HAUL WILL NOT BE ALLOWED BEYOND DESIGNATED SOURCES UNLESS OTHERWISE

SHOWN ON THE DRAWINGS OR AGREED TO BY THE CO.

SEED AND FERTILIZE ALL DISTURBED AREAS SUCH AS OVERBURDEN PILES AND

BENCH SURFACES IN ACCORDANCE WITH SECTION 625.

SAMPLE QUARRY DEVELOPMENT PLAN SAMPLE QUARRY BLASTING PLAN

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

13.

11.

12.

14.

50'-0"

10'-0"

TYPICAL

TYPICAL

50'-0"

TYPICAL

DITCH FLOWDITCH FLOW

S

TR

EA

M

F

LO

W

PLACE SILT FENCE ALONG WATERWAY,

TERMINATE AT END OF CUT, TYPICAL

STRAW BALES, CENTERED IN DITCH LINE

SILT FENCE, TYPICAL

SILT FENCE, SECURE AROUND INLET

TO KEEP DEBRIS OUT OF STREAM

SILT FENCE, TYPICAL

APPROX. 6 ' APPROX. 6'CENTER ON DITCHTYPICAL

135°

135°

DITC

H FL

OW

STRAW BALES (2)

'-6

'-0

GEOTEXTILE FABRIC FILTER CLOTH,

SECURE TO TOP OF POSTS

WOVEN WIRE FENCE FABRIC

BOTTOM OF SILT FENCE BURIED

IN TRENCH MINIMUM 6" DEPTH

SECURE EACH BALE W/

AT LEAST 2 STAKES BURIED

MINIMUM 12" DEPTH

DITCH FLOW

APPROX. 10' TYPICAL

POST

WOVEN WIRE FABRIC

GEOTEXTILE FABRIC

BRUSH BARRIER

SEE NOTES

GEOTEXTILE FABRIC, BURY

BOTTOM EDGE ±6"

ROAD FILL SLOPE

EXIST.

GROUND

VARIES 3' TO 5' VARIES 5' TO 10'

TYPICAL SEDIMENT CONTROL AT CULVERTS

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. OFR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:01/05

TONGASS LTF RECONSTRUCTION EROSION CONTROL DEVICES

KMRD AND CRD

SJC 01/2005

K. BRAY 01/2005

26 26

NOTES:

SILT FENCE CONSISTS OF WOVEN WIRE FENCE FABRIC WITH A MAXIMUM 6 INCHES MESH, MINIMUM HEIGHT

30 INCHES.

THE CO MAY REQUIRE ADJUSTMENTS TO ACTUAL LENGTHS OR LOCATIONS TO FIT FIELD CONDITIONS.

INSPECT SILT FENCES AFTER EACH RUNOFF EVENT AND IMMEDIATELY REPAIR ALL EROSION ALONG EDGES

AND BOTTOM.

ACCUMULATED DEPTH OF SEDIMENT SHALL NOT EXCEED ONE HALF THE ORIGINAL HEIGHT OF THE SILT FENCE.

IN AREAS DESIGNATED FOR BRUSH BARRIERS, LIMIT CLEARING TO TREES, SHRUBS AND PLANTS LESS THAN 4

INCHES IN DIAMETER. GRUBBING SHALL NOT BE PERFORMED IN THESE AREAS.

BRUSH BARIER SHALL BE CONSTRUCTED APPROX. PARALLEL TO ORIGINAL GROUND CONTOUR. USE WELL-INTERMINGLED MASS OF BRUSH, TREES, TRIMMINGS, ETC. BARRIER SHALL BE POROUS ENOUGH TO ALLOW WATER TO FILTER THROUGH. SECURE BY PLACING HEAVIER MATERIAL (TREES, LOGS, ETC.) ON TOP

OF AND THROUGHOUT THE BRUSH.

ADJOIN BRUSH BARRIER WITH ROADWAY SLOPE ON THE LOW END AS NEEDED TO CONTAIN SEDIMENTS.

3.

4.

2.

1.

TYPICAL SILT FENCE INSTALLATION FOR DITCHES

POST

TYPICAL SEDIMENT CONTROL AT CULVERTS

TYPICAL BRUSH BARRIER

5.

6.

7.

File details come from the government source that posted it. Updated .