Request_for_Information__1_Answers.docx

DOCX document 14 KB Posted

Attached to
Tongass Log Transfer Facility (LTF) Reconstruction Federal contract opportunity
Solicitation number
AG-0112-S-14-0014
Issued by
Department of Agriculture Forest Service R10-Alaska Region

View the file

Other files for this federal contract opportunity

Other files attached to Tongass Log Transfer Facility (LTF) Reconstruction, newest first.
File Type Posted
0112-S-14-0014Amd7.pdf PDF
0112-S-14-0014Amd6.pdf PDF
0112-S-14-0014Amd5.pdf PDF
0112-S-14-0115Q A1.pdf PDF
0112-S-14-0014Amd4.pdf PDF
0112-S-14-0014Amd3.pdf PDF
0112-S-14-0014Amd2.pdf PDF
0112-S-14-0014Amd1.pdf PDF
TongassLTFRecon5-30-14.pdf PDF
AG-0116-S-14-0014TongLtfRecon140523.pdf PDF
FsssTongLtfRecon.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI )#1 Solicitation AG-0112-S-14-0014 Tongass LTF Reconstruction

1) Can Foreign material be used for the Steel products for the beaver slide, floats and settling basin outlet pipe? Steel Fabricators in Alaska and Pacific Northwest are using mostly imported steel for pipe fabrication as domestic steel is being priced out at 3 to 4 times higher than the foreign product.

Answer: In reference to the Buy American Act, an exception to purchase steel other than domestic has not been approved.

2) What size, type and spec of bolts are to be used to hold the pipe float tubes to the ramp on plan sheet 6 0f 26?

Answer: Sheet 6 is reference only. Bolts used to hold the HDPE pipe floats to the slide platform referred to on sheet 9 should match the existing bolts as close as possible in size, type, and spec. At minimum, bolts and nuts should be galvanized steel, conforming to ASTM A307 as stated in FP-03 section 717.

The existing steel pipe floats are attached by welding. The new steel floats should be affixed by welding of equivalent size, type, spec, and location.

3) What FSSS spec is to be followed for the Pipe Pile skids? If it is Section 555 of the FP-03, is the entire 555 section applicable? Or is 555.03, 555.08, 555.10 555.14, and 555.18 the only applicable Parts of the 555 Section of the FP-03 for this work?

Answer: All of the FP-03 section 555 and supplements are applicable.