0112-S-14-0014Amd4.pdf
PDF 43 KB Posted
- Attached to
- Tongass Log Transfer Facility (LTF) Reconstruction Federal contract opportunity
- Solicitation number
- AG-0112-S-14-0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0112-S-14-0014Amd7.pdf | ||
| 0112-S-14-0014Amd6.pdf | ||
| 0112-S-14-0014Amd5.pdf | ||
| 0112-S-14-0115Q A1.pdf | ||
| 0112-S-14-0014Amd3.pdf | ||
| Request_for_Information__1_Answers.docx | DOCX document | |
| 0112-S-14-0014Amd2.pdf | ||
| 0112-S-14-0014Amd1.pdf | ||
| TongassLTFRecon5-30-14.pdf | ||
| AG-0116-S-14-0014TongLtfRecon140523.pdf | ||
| FsssTongLtfRecon.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
4 June 24, 2014 690385
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Tongass National Forest 123 Scow Bay Loop Road PO Box 309 Petersburg, AK 99833
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0112-S-14-0014Tongass Log Transfer Facility (LTF) Reconstruction
9B. DATED (SEE ITEM 11)
28May2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Portions of the West Arm Cholmondeley LTF Floating Log Slide are underwater making a condition determination difficult. This amendment to remove the replacement of the High-density polyethylene (HDPE) floats from the Base items. The government may modify this contract to repair the floats once the condition known.
Change paragraph C.2(a)(1) to read: “West Arm Cholmondeley LTF: Raise, transport and place the Floating Log Slide system on the Thorne Bay LTF. Any repairs, including replacement of the High-density polyethylene (HDPE) floats, will be made after a government structural evaluation and through a contract modification to the successful Bidder. No HDPE floats are required in the Base Bid.”
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kim Toland, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
June 24, 2014 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 3, Tongass Log Transfer Facility (LTF) Reconstruction, Solicitation: AG-0112-S-14-0014
452.215-71 Instructions For The Preparation of Technical and Business Proposals (SEP 1999) (Amendment 3)
(a) General Instructions. Proposals submitted in response to this solicitation should include the following:
(1) 1 copy – Completed SF-1442 Solicitation, Offer and Award form, signed and dated by offeror.
(2) Response to any amendments that were issued.
(3) 1 copy – Schedule of Items (Section B)
(4) Information required from Section K Representations and Certifications and copy of Alaska
Native or Indian-Owned Business.
(5) Draft plan to accomplish the work. The plan must include:
(i) Estimated dates of performance to include:
(A) Start work
(B) Mobilization
(C) Start and completion of work items
(D) Demobilization
(E) Completion
(ii) Anticipated method to accomplish work
(iii) Anticipated subcontracts
(iv) Personnel and equipment to be used
(6) 1 copy – Experience and Capability Questionnaire (Section M) OR clearly written resume that provides the same information. Questionnaire or resume must address sources selection factors listed in Section M. Evaluation The Experience and Capability Questionnaire can be used as the format to answer some of the Past Performance requirement. Include the names of project managers and projects of similar scope they’ve managed.
(End of provision)
SECTION M. EVALUATION FACTORS FOR AWARD (Amendment 3)
Evaluation for Award: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Ensure offers address the following evaluation factors (also see Section L, 452.215-71 Instructions for the Preparation of Technical and Business Proposals):
(b) Draft plan to accomplish work, sub-factors are:
(1) Proposed schedule of completion
(2) Method to accomplish work
(c) Sufficient capacity to perform contract work, sub-factors are:
(1) List of equipment available to complete work. Identify equipment contractor currently possess and equipment contractor plans to lease/rent to accomplish this work.
(2) Personnel by position to perform this work, and years of experience.
(d) Construction experience of project managers performing similar projects. Submit names of project managers and projects of similar scope they’ve managed.
(e) Past Performance: The offeror shall provide specific information on recent relevant contracts which support past and present performance. Offerors without past performance history will not be evaluated favorably or unfavorably on past performance. Past performance evaluation will include:
(1) History of favorable and cost effective business relationships.
(2) History of cooperative and non-adversarial project site relationships.
(f) All evaluation factors other than price, when combined, are more important than price.
Accordingly, award may be made to an offeror other than the lowest priced offeror, if that higher-priced offeror provides the best value.