0112-S-14-0014Amd1.pdf

PDF 128 KB Posted

Attached to
Tongass Log Transfer Facility (LTF) Reconstruction Federal contract opportunity
Solicitation number
AG-0112-S-14-0014
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Amendment one makes the following corrections 1. Remove Section B. Supplies or Services and Prices and replace with attached Section B. Supplies or Services and Prices (Amendment 1). 2. Remove Section C. Description/Specifications and replace with attached Section C. Description/Specifications (Amendment 1). 3. Add provision 52.217-5 Evaluation of Options (July 1990) to Section.

View the file

Other files for this federal contract opportunity

Other files attached to Tongass Log Transfer Facility (LTF) Reconstruction, newest first.
File Type Posted
0112-S-14-0014Amd7.pdf PDF
0112-S-14-0014Amd6.pdf PDF
0112-S-14-0014Amd5.pdf PDF
0112-S-14-0115Q A1.pdf PDF
0112-S-14-0014Amd4.pdf PDF
0112-S-14-0014Amd3.pdf PDF
Request_for_Information__1_Answers.docx DOCX document
0112-S-14-0014Amd2.pdf PDF
TongassLTFRecon5-30-14.pdf PDF
FsssTongLtfRecon.pdf PDF
AG-0116-S-14-0014TongLtfRecon140523.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

1 June 2, 2014 690385

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Tongass National Forest 123 Scow Bay Loop Road PO Box 309 Petersburg, AK 99833

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0112-S-14-0014Tongass Log Transfer Facility (LTF) Reconstruction

9B. DATED (SEE ITEM 11)

28May2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

This amendment makes the following corrections:

1. Remove Section B. Supplies or Services and Prices, and replace with attached Section B. Supplies or

Services and Prices (Amendment 1).

2. Remove Section C. Description/Specifications, and replace with attached Section C. Description/Specifications

(Amendment 1).

3. Add provision, 52.217-5 Evaluation of Options (July 1990) to Section M.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Kim Toland, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

June 2, 2014 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Tongass Log Transfer Facility (LTF) Reconstruction, Solicitation: AG-0112-S-14-0014 Contract:

PART I—THE SCHEDULE

SECTION B. SUPPLIES OR SERVICES AND PRICES

SCHEDULE OF ITEMS

B.1 Base Items Item Description Pay Unit Qty. Price

Shelter Cove A 15101 Mobilization (Shelter Cove) Lump

Sum

B Repair and maintain Shelter Cove LTF in accordance with (IAW) specifications and drawings.

Lump Sum

West Arm Cholmondeley C 15101 Mobilization (West Arm Cholmondeley) Lump

Sum

D Repair and maintain West Arm Cholmondeley

LTF, IAW specifications and drawings.

Lump Sum

Total Base Items:

B.2 Optional Items One, Upper Carroll E 15101 Mobilization (Upper Carroll) Lump

Sum

F Repair and maintain Upper Carroll LTF, IAW specifications and drawings.

Lump Sum

Total Optional Items One:

B.3 Optional Items Two, Fire Cove G 15101 Mobilization (Fire Cove) Lump

Sum

H Repair and maintain Fire Cove LTF, IAW specifications and drawings.

Lump Sum

Total Optional Items Two:

B.4 Optional Items Three, SW Neets I 15101 Mobilization (SW Neets) Lump

Sum

J Repair and maintain SW Neets LTF, IAW specifications and drawings.

Lump Sum

Total Optional Items Three:

Grand Total of Base and Optional Items Notes Total Base Items:

** Payment will be made by contract quantity work.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted

Total Optional Items One:

Total Optional Items Two:

Total Optional Items Three:

Grand Total for All Items:

kimtoland Typewritten Text kimtoland

(Amendment 1)

SECTION C. DESCRIPTION/SPECIFICATIONS

C.1 Scope of Contract is to improve, repair and maintain existing Tongass National Forest LTFs.

C.2 Description of work includes:

(a) Base Items:

(1) West Arm Cholmondeley LTF: Salvage the Floating Log Slide and place it on the Thorne Bay LTF for repair. Replace existing High-density polyethylene (HDPE) and steel floats with new foam filled HDPE and steel floats.

(2) Shelter Cove LTF: Clear and grub LTF surface. Clean out settling basin and install new drainage pipe.

Excavate, construct, and compact new rock ramp. Excavation may encounter bedrock requiring incidental blasting. Place riprap armor on new cut and fill slopes exposed to ocean. Construct shot rock berm on LTF.

Excavated fill to be stockpiled on LTF site.

(b) Optional Items One, of this contract located at Upper Carroll, includes constructing a new drainage basin and ditch, installing new drainage pipe, and recontouring the LTF to drain towards new ditch. Work will also include clearing and grubbing Upper Carroll LTF Surface.

(c) Optional Items Two, of this contract includes the following work at Fire Cove LTF: Clear and grub LTF.

Relocate drainage ditch to back of LTF and construct new settling basin and install new drainage pipe. Excavate, construct, and compact new log ramp with steel pipe pile log slide.

(d) Optional Items three, of this contract includes the following work at SW Neets LTF: Clear and grub LTF.

Relocate drainage ditch to back of LTF. Blasting rock slope. Clean out settling basin and associated culverts.

Excavate, construct, and compact new log ramp with steel pipe pile log slide.

(e) Refer to drawings for complete and detailed description of work for base bid items and all option items.

(f) The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work listed on the schedule of items, specifications and drawings.

(g) Payment will be made only for those items listed on Bid Schedule. All other work is incidental to those pay items.

C.3 Locations, all sites are accessible by sea plane or boat:

(a) West Arm Cholmondeley LTF site is located on the southern half of Prince of Wales Island, approximately 20 miles south of Thorne Bay.

(b) Shelter Cove LTF is located in Carroll Inlet on Revillagigedo Island, approximately 15 miles northwest of Ketchikan.

(c) Upper Carroll LTF is located in Carroll Inlet on Revillagigedo Island, approximately 20 miles northwest of Ketchikan.

(d) Fire Cove LTF is located in Neets Bay on Revillagigedo Island, approximately 25 miles north of Ketchikan.

(e) SW Neets LTF is located in Neets Bay on Revillagigedo Island, approximately 25 miles north of Ketchikan.

(f) Shelter Cove, Upper Carroll, Fire Cove, and SW Neets have equipment access ramps. Shelter Cove and Fire Cove have Forest Service docks. West Arm Cholmondeley has a barge bulkhead and ramp.

(g) All LTFs have on site rock source. Clearing and grubbing waste to be disposed at designated waste sites, determined by CO/COR, within 3 mile radius of sites. SW Neets LTF has designated waste site on site.

C.4 Signing and Safety

It shall be the Contractor’s responsibility to furnish black and orange reflectorized warning signs to alert motorists of construction operations. A minimum of one (1) sign at the access road to each site under construction shall be kept in place at all times and shall be located in accordance with the Manual of Uniform Traffic Control Devices (MUTCD).

C.5 The Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects, FP-03, are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Specifications (FP-03) can be obtained from the Federal Highway Administration Home Page at: http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm, http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm kimtoland Typewritten Text kimtoland

(Amendment 1)

C.6 Special Project Specification and Forest Service Supplementation The following specifications and supplementations (Attached: FSS and Special Project Specifications, Tongass Log Transfer Facility (LTF)) to FP-03 are hereby made part of this solicitation and any resultant contract:

101 - Terms, Format, and Definitions 102 - Bid, Award, and Execution of Contract 103 - Scope of Work 104 - Control of Work 105 - Control of Material 106 - Acceptance of Work 107 - Legal Relations and Responsibility to the Public 108 - Prosecution and Progress 109 - Measurement and Payment 155 - Schedules for Construction Contracts

171 - Weed and Disease Prevention 201 - Clearing and Grubbing 204 - Excavation and Embankment 205 - Rock Blasting 251 - Riprap 301 - Untreated Aggregate Courses 555 - Steel Structures 651 - Development of Pits & Quarries 705 - Rock 718 - Traffic Signing and Marking Material

Tongass Log Transfer Facility (LTF) Reconstruction
52.225-10 Notice of Buy American Act Requirement—Construction Materials (Feb 2009)
52.236-28 Preparation of Proposals—Construction (Oct 1997)
452.228-70 Alternative Forms of Security (NOV 1996)

File details come from the government source that posted it. Updated .