Worklist.docx

DOCX document 19 KB Posted

Attached to
POW Bridge Removal Project Federal contract opportunity
Solicitation number
AG-0109-S-14-0009
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Work list

View the file

Other files for this federal contract opportunity

Other files attached to POW Bridge Removal Project, newest first.
File Type Posted
image0016.pdf PDF
amendment_03_POW_1.pdf PDF
amendment_02_POW.doc DOC document
Amended_Worklist.docx DOCX document
image0019.pdf PDF
Amended_FSSS.docx DOCX document
amendment_01_POW.doc DOC document
FSSS.docx DOCX document
POW_BRIDGE_REMOVAL_FY14_ALL.pdf PDF
POW_Bridge_solicitation.doc DOC document
Bridge_Photos.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road #

Milepost

Description of Work

2024100

0.32

BOP

2024100

0.32

Temporary crossing

0.34

Remove 90' Hamilton modular steel bridge and transport to Rowan Bay on Kiui Island. Excavate fill slopes at 1V:3H beginning at the top of the sills. Fish June 15th-July 15th

0.34

Install riprap traffic control device as staked

0.34

EOP

3005000

2.78

BOP

2.78

Remove 91' MBS Bridge (transport to Thorne Bay Sort Yard), excavate fill slopes at 1V:3H beginning at the top of the sills. Install 2 sill logs and 2 log stringers; Install Riprap traffic control device as staked. Fish June 15th-Sept 1st

2.78-6.93

Roadway Reconditioning.

6.93

EOP

3005200

Install Riprap Road Closure device as staked

0.07

Remove 24"x32' cmp - Deep fill 30ft Fish June 15th-Sept 1st

0.16

Remove 36"x40" cmp - Deep fill 10ft Fish June 15th-Sept 1st

0.34

Remove 18"x30' cmp

0.56

Remove 18"x30' cmp

0.71

Remove 24"x32' cmp - *Deep fill 20ft

0.78

Remove 18"x30' cmp

0.8

Install xdrain waterbar

0.85

Remove 24"x32' cmp

0.9

Remove 24"x32' cmp and clean 75ft of ditch from removed culvert towards mp 0.92

0.92

Remove 18"x30' cmp

0.99

Remove 18"x30' cmp

1.06

Remove 18"x30' cmp

1.14

Remove 18"x30' cmp

1.15

Side cast 10cy slough material and leave functioning ditch

1.25

Remove 18"x30' cmp

1.31

Remove 18"x30' cmp

1.37

Install xdrain waterbar

1.41

Remove 18"x30' cmp

1.48

Remove 18"x30' cmp

1.6

Remove 18"x30' cmp

1.65

Remove log culvert

1.67

Remove 24"x32' cmp

1.7

Remove 24"x32' cmp