Work list
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| image0016.pdf | ||
| amendment_03_POW_1.pdf | ||
| amendment_02_POW.doc | DOC document | |
| Amended_Worklist.docx | DOCX document | |
| image0019.pdf | ||
| Amended_FSSS.docx | DOCX document | |
| amendment_01_POW.doc | DOC document | |
| FSSS.docx | DOCX document | |
| POW_BRIDGE_REMOVAL_FY14_ALL.pdf | ||
| POW_Bridge_solicitation.doc | DOC document | |
| Bridge_Photos.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road #
Milepost
Description of Work
2024100
0.32
BOP
2024100
0.32
Temporary crossing
0.34
Remove 90' Hamilton modular steel bridge and transport to Rowan Bay on Kiui Island. Excavate fill slopes at 1V:3H beginning at the top of the sills. Fish June 15th-July 15th
0.34
Install riprap traffic control device as staked
0.34
EOP
3005000
2.78
BOP
2.78
Remove 91' MBS Bridge (transport to Thorne Bay Sort Yard), excavate fill slopes at 1V:3H beginning at the top of the sills. Install 2 sill logs and 2 log stringers; Install Riprap traffic control device as staked. Fish June 15th-Sept 1st
2.78-6.93
Roadway Reconditioning.
6.93
EOP
3005200
Install Riprap Road Closure device as staked
0.07
Remove 24"x32' cmp - Deep fill 30ft Fish June 15th-Sept 1st
0.16
Remove 36"x40" cmp - Deep fill 10ft Fish June 15th-Sept 1st
0.34
Remove 18"x30' cmp
0.56
Remove 18"x30' cmp
0.71
Remove 24"x32' cmp - *Deep fill 20ft
0.78
Remove 18"x30' cmp
0.8
Install xdrain waterbar
0.85
Remove 24"x32' cmp
0.9
Remove 24"x32' cmp and clean 75ft of ditch from removed culvert towards mp 0.92
0.92
Remove 18"x30' cmp
0.99
Remove 18"x30' cmp
1.06
Remove 18"x30' cmp
1.14
Remove 18"x30' cmp
1.15
Side cast 10cy slough material and leave functioning ditch
1.25
Remove 18"x30' cmp
1.31
Remove 18"x30' cmp
1.37
Install xdrain waterbar
1.41
Remove 18"x30' cmp
1.48
Remove 18"x30' cmp
1.6
Remove 18"x30' cmp
1.65
Remove log culvert
1.67
Remove 24"x32' cmp
1.7
Remove 24"x32' cmp