Amended_FSSS.docx

DOCX document 98 KB Posted

Attached to
POW Bridge Removal Project Federal contract opportunity
Solicitation number
AG-0109-S-14-0009
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Amended FSSS

View the file

Other files for this federal contract opportunity

Other files attached to POW Bridge Removal Project, newest first.
File Type Posted
image0016.pdf PDF
amendment_03_POW_1.pdf PDF
amendment_02_POW.doc DOC document
Amended_Worklist.docx DOCX document
image0019.pdf PDF
amendment_01_POW.doc DOC document
FSSS.docx DOCX document
POW_BRIDGE_REMOVAL_FY14_ALL.pdf PDF
Worklist.docx DOCX document
POW_Bridge_solicitation.doc DOC document
Bridge_Photos.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

Table of Contents1
Preface2
101 - Terms, Format, and Definitions3
101.01 Meaning of Terms3
101.03 Abbreviations.3
101.04 Definitions.3
102 - Bid, Award, and Execution of Contract6
102 Bid, Award, and Execution of Contract6
103 - Scope of Work7
Deletions7
104 - Control of Work8
Deletions8
104.06 Use of Roads by Contractor8
104.07 Other Contracts.8
105 - Control of Material9
105.02 Material Sources.9
105.02(a) Government-provided sources.9
105.05 Use of Material Found in the Work.9
106 - Acceptance of Work10
106.01 Conformity with Contract Requirements.10
106.07 Delete12
107 - Legal Relations and Responsibility To the Public13
107.02 Protection and Restoration of Property and Landscape.13
107 - Legal Relations and Responsibility to the Public14
107.05 Responsibility for Damage Claims.14
107.06 Contractor’s Responsibility for Work.14
107.09 Legal Relationship of the Parties.14
107.10 Environmental Protection.14
108 - Prosecution and Progress16
108 Delete.16
109 - Measurement and Payment17
109 Deletions17
109.02 Measurement Terms and Definitions.17
153 - Contractor Quality Control18
153.04 Records.18
155 - Schedules for Construction Contracts19
155 Delete.19

157- Erosion Control……………………………………………………………………………..20 171-Weed Prevention…………………………………………………………………………….21

203 - Removal of Structures and Obstructions23
203.04 Removing Material.23

204- Excavation and Embankment………………………………………………………………25 251 - Riprap 303-Roadway Reconditioning…………………………………………………………………...29 557- Timber Structures 571- Modular Bridges 625-Seeding……………………………………………………………………………………...36 650 - Road Closure Devices 37 705 - Rock

705.02 Riprap Rock.40
718 - Traffic Signing and Marking Material41
718.05 Aluminum Panels42

802-Road Storage………………………………………………………………………………..42.

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.07_nat_us_02_17_2005 Add Subsection.

104.07 Other Contracts.

Example: The Federal Highway Administration is administering and is intending to award a contract for the reconstruction of 3 1/2 miles of Salmon la Sac Road approximately 5 miles north of this project. Schedule activities to assure no delays or interference to the operations of the Federal Highway Administration contract.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_01_17_2013

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is most strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility To the Public 107.02_nat_us_02_17_2005

107.02 Protection and Restoration of Property and Landscape.

Add the following:

Examples: (Include language to clarify or interpret permit or other requirements).

Do not work within the wetted perimeter of streams before July 1 or after September 15.

Do not work within 1000 feet of an occupied dwelling on any legal holiday or between 12 noon Saturday and 6 a.m. the following Monday.

Do not work (except hauling material) within 1500 feet of osprey nests between March 1 and May 31. No known active nests were located within the 1500 feet limit as of June 15, 1991. If a new nest is found, suspend work (except hauling material) within 1500 feet of the nest location. See Subsection 108.06.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

153 - Contractor Quality Control 153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

157 - Soil Erosion Control 157.00_01_us_10_10_2006

157.02 Materials

Add the following:

Provide bales, wattles, logs and rolls from a certified noxious weed free source.

157.03 General.

Delete the first two paragraphs and replace with the following:

Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.

Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:

1. The construction activities and sequence of implementation relating to specific erosion control measures.

1. The location and type of permanent controls to be implemented during construction. Examples include but are not limited to settling pools, application and timing of seed and fertilizer, use of wattle and coir logs, and construction of ditch flow cross drains in proximity to flowing streams.

1. The location and type of temporary controls to be implemented during construction.

1. For work in stream channels describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

Add the following to the third paragraph:

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.09 Diversions.

Delete the first sentence and replace with the following:

When shown on the plans, construct temporary channels, temporary culverts, or sandbags to divert water around disturbed areas and slopes. Earthen dams are prohibited.

203 - Removal of Structures and Obstructions 203.04_nat_us_02_18_2005

203.04 Removing Material.

Replace the fourth and fifth paragraphs with the following:

Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete.

Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.

204 Excavation and Embankment

204 - Excavation and Embankment 204.14_1005_us_01_18_2005 Delete Section 204 in its entirety and replace with the following:

204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping. Borrow excavation consists of material available in existing borrow sources and in the existing road prism, no drilling or explosives will be needed for producing material.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(4) Preparing foundation for embankment;

(5) Construction roadway embankments;

(6) Benching for side-hill embankments;

(7) Constructing dikes, ramps, mounds, and berms; and Eagle Creek Road Storage; Solicitation: AG-0116-S-11-0133; Contract: AG-0116-C-11-0069

(8) Backfilling subexcavated areas, hope, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

204.11 Compaction.

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment over the full width of each layer until visible deformation of the layer ceases or, when a sheepsfoot roller is used, the roller walks out‖ of the layer. Make at last three complete passes.

204.13 Sloping, Shaping, and Finishing.

(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material.

Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify the 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.

For unsurfaced roads, use one of the following methods to finish the roadbed:

(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.

(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons.

Roll at least 5 full-width passes or until visible displacement ceases.

(3) Method C. For roads designated as Construction Tolerance Class K, L, of M, finish the roadbed by spreading the excavation. Eliminate rock berms.

251 - Riprap 251.01_10_us_04_05_2006

Description

Delete the first sentence and add the following:

251.01 This work consists of furnishing, hauling and placing of riprap for bank protection, slope protection, drainage structures, erosion control, stream simulation, and other locations shown on the plans.

Material

251.02 Add the following:

When shown on the plans stone from the project site may be utilized.

303-Roadway Reconditioning Delete Section 303 in its entirety and replace with the following:

Description

303.01 This work consists of reconditioning ditches, shoulders, and roadbeds.

Construction Requirements

303.02 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Pull any trees over 3 inches in diameter. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade. Dispose of waste on the downhill side of the road away from any live streams.

303.03 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection 204.07. Remove all trash, slide material, wind thrown logs, trees, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Pull any trees over 3 inches in diameter. Reshape shoulders and dispose of waste as directed on the ground by the engineer.

303.04 Roadbed Reconditioning. Repair holes and unstable areas according to Subsection 204.07. Incorporate borrow into low spots, reshape road surface to restore original road prism including crown. Walk in existing road surface with dozer or excavator tracks for compaction. Remove all slide material, trash, wind thrown logs, tops, limbs, and other organic debris from the road bed. Dispose of waste material as directed on the ground by the engineer.

303.05 Roadway Reconditioning. Perform all applicable work described in Subsections 303.02 through 303.05.

303.06 Acceptance. Road reconditioning work will be evaluated under 106.02.

Measurement

303.07 Measure the Section 303 items listed in the bid schedule according to 109.02j.

Payment

303.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05

Description

557.04 Treated Timber.

Replace the first sentence of the third paragraph with the following:

Use a copper naphthenate solution containing a minimum of 2 percent copper metal for field treatments of material originally treated with copper naphthenate, pentachlorophenol, creosote, creosote solution, or waterborne preservatives, unless specified otherwise in the contract. Impregnate all holes using equipment suitable for proper application of the preservative.

Add the following Subsection:

557.04A Untreated Timber. Coat the following untreated timber surfaces in accordance with AWPA M4:

(a) All ends and tops, and all contact surfaces of posts, sills, and caps.

(b) All ends, joints, and contact surfaces of bracing and truss members.

(c) All surfaces of timber bumpers and the back faces of bulkheads.

(d) All other timber that will be in contact with earth.

557.06 Bolts and Washers.

Add the following to the first paragraph:

Do not galvanize glued laminated deck panel dowels.

Add the following to the second paragraph:

Place cut washers under nuts at steel surfaces. Malleable washers are not required under economy head bolts.

557.09 Framing Bents.

Add the following at the end of the Subsection:

Fasten posts to pedestals with dowels not less than 11/16-inch in diameter that extend at least 6 inches into the posts, or with other types of connectors as specified in the contract. Fasten posts to sills using one of the following methods, as specified in the contract:

(a)With dowels not less than 11/16-inch in diameter that extend at least 6 inches into posts and sills.
(b)With drift bolts not less than 11/16-inch diameter driven diagonally through the base of the post and extending at least 7 inches into the sill. Drive drift bolts into holes at a 45° angle to enter the post at least 6 inches above the post base.
(c)With other types of connectors as specified in the contract.

Treat, furnish, and drive timber piles in accordance with Section 551.

Add the following Subsection after the end of Subsection 557.14, and renumber Subsections 557.15 through 557.21 in the parent Specification to Subsections 557.16 through 557.22:

557.15 Glued Laminated Panel Decks. Do not drag or skid panels. When lifted, support panels in the weak-moment plane at a sufficient number of points to avoid overstressing, and protect the edges from damage.

When dowels are specified in the contract between deck panels, use a template or drilling jig to ensure that dowel holes are accurately spaced and drilled parallel to one another and to the horizontal surfaces of the panel. Drill holes to a depth ¼ inch greater than one-half the dowel length, and of a diameter that is 1/16 inch greater than the dowel, unless otherwise specified in the contract. Use a temporary dowel as a check for snug fit prior to production drilling. Use dowels of the size specified in the contract, with the tips slightly tapered or rounded. Use an approved lubricant to facilitate the connection process.

Start the tips of all dowels partially and equally into the holes of the two panels being joined. Draw the panels together keeping the edges parallel, until the panels abut tightly. Securely fasten each panel to each stringer as specified in the contract.

Assemble and match-mark panels prior to delivery to the construction site when specified in the contract. Follow erection procedures given in FPL-263, Forest Service, Forest Products Laboratory (FPL), Madison, Wisconsin.

Modular Bridges Description

571.01 This work consists of designing, fabricating, delivering, and installing prefabricated modular bridge superstructures; or transporting and installing Government-furnished prefabricated, modular superstructures and components; or repairing Government-furnished prefabricated, modular superstructures. The work also includes constructing curbs and railings, caps, bearings, and abutments, including excavation and backfill, anchoring bridge superstructures to abutments as required, riprap, and backwalls.

Materials

571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:

Structural Concrete
552
Prestressed Concrete
553
Reinforcing Steel
554
Steel Structures
555
Bridge Railing
556
Timber Structures
557
Painting
563
Paint
708
Material for Timber Structures
716
Structural Metal
717

Concrete compressive strength; structural steel tensile strength, finish and designation; timber species, grade, and treatment; and other material specifications shall be as required or if not listed in the contract documents, take them from the manufacturer’s drawings, and have them approved by the CO prior to fabrication.

Provide a System 3 or galvanized protective coating on steel members according to sections 563 and 708.

Provide pressure treated timber that is Douglas Fir or Western Larch. Except for the wearing surface, treat timber according to Section 716.03.

Provide wearing surface timber that is Douglas Fir, Western Hemlock, Alaska Spruce, Alaska Hemlock, or Alaska Yellow Cedar.

Construction Requirements

571.03 Design Requirements. For required loadings use the most recent AASHTO “Standard Specifications for Highway Bridges” and Figure 1.

When design of the structure is required, submit plans and calculations signed by a professional engineer registered in the state where the bridge will initially be located or in the state where the fabricator’s offices are located.

Consider temporary loads due to handling and erection.

Consider Southeast Alaska’s moist climate and high potential for wood decay and steel deterioration.

Use durable materials to allow removal, transportation, and re-installation using typical forest logging or construction equipment. Use design techniques and fabrication methods to minimize field installation difficulties. Fabricate primary components from steel.

Unless components are furnished by the Government, furnish prefabricated, modular bridge superstructure components complete and in place, including deck, and railing when required, to form a bridge superstructure capable of supporting traffic as soon as construction of approaches is complete. Include all incidental materials required to provide a complete structure ready for use.

Rig main superstructure components with permanent lifting devices to facilitate efficient installation and removal of these items using typical forest logging or construction equipment. Place lifting devices so as not to interfere with traffic.

Design continuous spread or sill type footings between points of superstructure bearing. Provide 5 ft depth of suitable excavated material under the footing and do not exceed 5 kips per square foot of footing-soil contact pressure exerted on the base material, other than solid bedrock. Footing material to be pressure treated wood, glulam, or precast concrete. Native log sills are acceptable if allowed in the contract. Place the front edge of the footing three feet (minimum) back from the top edge of the embankment slope on which it bears. Do not locate the riprap bank protection in this three foot setback. Place footings on a 6 inch layer of crushed aggregate which meets the requirements of the State of Alaska, Standard Specifications for Highway Construction 1998, Table 703-2, grading D1. Extend this leveling course 8 inches (minimum) beyond the edge of the footing.

Design backwalls and wingwalls to retain roadway fill material across the full width of the roadway prism at a slope of 1 vertical to 1.5 horizontal. Extend backwalls to the bottom of the footing. Provide pressure treated wood or precast concrete backwalls. Native log backwalls are acceptable if allowed in the contract.

Provide an untreated timber wearing surface for each longitudinal component. Provide wearing surface planks 3 inches to 4 inches in nominal thickness; 12 inches in nominal width. Extend the wearing surface full length and full width from curb to curb. For bridges installed in a permanent location extend the wearing surface over the top of the backwall. Orient the wearing surface planks parallel to the longitudinal axis of the roadway and offset the longitudinal joints of the wearing surface over the longitudinal joint of the two main bridge components. Install at least one plank after connection of the two components to cover the center joint. Do not locate plank attachment hardware within or above the top ¼ inch of the wearing surface plank. Provide plank attachment hardware that does not extend below the bottom of the deck planks.

When a curb only is system is required, top of curb shall be 15 inches above the top of the wearing surface.

If bridge and approach railing are required, design a bridge railing and approach railing system for 50% of AASHTO rail loading (low volume, single lane bridges). Include in the design proper bridge railing, bridge/approach railing transitions, approach railing, and approach railing terminal sections.

The following modular bridge designs (with curb only) are approved for use in Region 10.

If bridge and approach railing are required, the Contractor is responsible for bridge railing and approach railing design for all bridges.

Hamilton Construction Company

P.O. Box 659541-746-2426 (voice)
Springfield, OR541-746-7635 (fax)

www.hamil.com Bridge lengths of 30, 40, 50, 60, 70, and 80 feet have been approved by Region 10, US Forest Service.

Big “R” Manufacturing and Distributing Company

P.O. Box 12901-800-234-0734 (voice)
Greeley, CO 806321-970-356-9621 (fax)

www.bigrmfg.com Bridge lengths of 10, 20, 30, 40, 50, 60, 70, 80, and 90 feet have been approved by Region 10, US Forest Service.

571.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, or shop drawings at least 21 days in advance of the start of fabrication to allow time for review and correction of any changes and approval by the CO. Include plan, elevation, and section views of the modular bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

When Government-furnished prefabricated bridge superstructure components are specified, material lists, installation information, and manufacturer’s instructions will be furnished by the Government.

571.05 General. Perform excavation, backfill, and embankment work according to sections 204 and 209.

Dispose of all debris resulting from operations according to section 203.

571.06 Performance. Notify the CO at least 14 days before delivering the bridge.

If the prefabricated superstructure is not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

571.07 Abutments and Approaches. Construct required caps, bearing, abutments, and backwalls according to Division 500. Construct approaches including excavation and backfill according to sections 204 and 209. Construct riprap according to section 251.

Excavate to a depth of 5 feet below the substructure and backfill with suitable excavated material.

571.08 Contractor-Furnished Prefabricated Bridge Superstructure. Furnish the following items for approval prior to delivery of the bridge component:

(a) Supplier or inspection agency certification of wood species and grade of all timber and a conformance certificate for all sawn and glued laminated members.

(b) Certification by an approved inspection and testing agency of wood treatment, listing method of treatment, type of preservative, retention, and penetration. Supplier certification is permitted if each piece is stamped or branded with a legible American Wood Preservers Bureau quality mark.

(c) Certification of structural steel, fasteners, and hardware.

(d) Certification of galvanizing process used.

(e) Steel fabricator certification that steel fabrication and quality control meet the requirements of the AISC Code of Standard Practice; and that all welding meets the requirements of ANSI/AASHTO/AWS D 1.5 Bridge Welding Code.

(f) A complete list of all bridge components, hardware, and fasteners.

(g) Complete instructions and drawings. Provide drawings that are black line, of reproducible quality, on 11 inch x 17 inch media. Furnish the same information in an approved electronic format.

Mark the end of each major component of the bridge superstructure with the same permanent serial number in a location that is clearly visible, both when stacked in storage and erected at the site.

Assemble bridge superstructure prior to delivery to assure proper fit-up of all components. Notify the CO of the assembly 2 weeks before assembly.

571.09 Government-Furnished Prefabricated Bridge Superstructure. For Government-furnished prefabricated bridge units, transport all material from the storage site(s) to the bridge site, and install the superstructure complete and in place, including connection of all girders, diaphragms, railings, panels, transoms, and other elements. Install the substructure complete and in place including suitable material for fill, crushed aggregate bedding, sills, backwall, and riprap.

Upon taking possession of the Government-furnished units at the storage site, assume liability for damage resulting from handling, transporting, or erecting the units in place, until final acceptance of the project.

571.10 Non-pressure Epoxy Grout Anchors. Furnish non-pressure epoxy grout to cement anchor dowels and bolts. At least 15 days prior to use submit for approval manufacture’s test information on the non-pressure epoxy grout proposed for use.

Immediately prior to placing dowels or bolts, clean drill hole of dust and other material. Fill hole halfway with grout. Insert dowels by rotating it though one complete turn while tapping it down. Insert bolts according to manufacture’s instructions. If necessary add more grout to fill the hole.

571.11 Acceptance. Furnish a production certification for timber, including glued-laminated lumber, structural steel, and fabricated steel. Furnish a certification for all wood treatment, fasteners, hardware, galvanizing processes, and non-pressure epoxy grout.

Measurement

571.12 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.

Payment

571.13 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

625 Seeding & Fertilizing 625.01 Service Required Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.

Apply seed and fertilizer to disturbed areas and ditches between April 15 and September 15.

Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise not friable.

Application Methods for Seed and Fertilizer Furnish the kinds of seed and the amounts to be applied in terms of pure live seed as follows:

Quantity of Pure Kind of Seed Live Seed (Lbs/Acre)

1. Boreal Red Fescue* 10

2. Annual Ryegrass 10

3. Arctared Fescue* 5 Total 25

* If either Boreal red fescue or Arctared fescue are unavailable, Fawn Tall fescue may be substituted. If Fawn Tall Fescue is unavailable, then the amounts of the available two may be adjusted to total 100%. Seed mixture contains no more than 0.01% other seed, whether identified or not.

Apply seed by the dry or hydraulic method. Fertilizer shall be applied at a rate of 300 lbs/acre (340 kg/ha), with the following chemical analysis:

10-20-10 (10% Nitrogen, 20% Phosphorus, and 10% Potassium): 200 lbs/acre (225 kg/ha) 46-0-0 (Nitrogen Urea): 100 lbs/acre (110 kg/ha) 625.02 Performance Standard Treatment is complete when ordered quantities of vegetative treatment products have been appropriately applied to designated or Service Provider disturbed soil areas for full coverage.

625.03 Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

625.04 Measurement Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

625.05 Payment A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 841 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

650 - Road Closure Devices 650.00_nat_us_06_28_2007 Description

650.01 Work. Furnish and install, or install only, road closure devices using fabricated gates and accessories, combination post and rail barriers, concrete barriers, earth mound barriers, and other devices.

Materials

650.02 Requirements. Furnish materials to be used in fabricating gates and barriers. Ensure that all hardware is galvanized in accordance with AASHTO M 232 and meets the requirements of ASTM A 307. Furnish plain or cut washers that are American Standard Washers.

Furnish timber posts, rails, and lumber that meet the requirements of AASHTO M 168. Provide timber of the species and type, and rate of preservative treatment.

Furnish concrete that meets the requirements of Subsection 601.03, method B or C.

Construct earth mound barriers from excavated material adjacent to the barrier location, or from other designated locations.

Construction

650.03 Performance. Place road closure devices at designated locations. Construct all devices to the required dimensions. In assembling gates, perform required welding in accordance with the best modern practice and the applicable requirements of AWS D1.1.

After assembly, clean non-galvanized steel pipe gates and paint them with one coat of zinc-rich primer and two coats of exterior enamel of the required type and color.

Set all posts vertically and embed them to the required depth. Place concrete for embedment against undisturbed earth within an excavation sized to achieve the embedment dimensions. Compact the backfill in 6 inch layers to finished grade.

Furnish and install all signs and/or reflective warning markers accessory to the road closure device.

650.04 Acceptance. Construction of road closure devices will be evaluated under Subsections 106.02 and 106.04.

Measurement

650.05 Measure the items listed in the bid schedule according to Subsection 109.02.

Payment

650.06 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 650 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

705 - Rock 705.02_nat_us_08_05_2009

705.02 Riprap Rock.

Delete Table 705-1 and replace it with the following:

Gradation Requirements for Riprap

Class
Percent of Rock by Mass
Mass

(pounds) Approximate Cubic Dimension b,c (inches)

20
22 to 33
6 to 8
30
11 to 22
5 to 6
40
1 to 11
2 to 5
10a
0 to 1
0 to 2
20
55 to 110
8 to 10
30
22 to 55
6 to 8
40
2 to 22
3 to 6
10a
0 to 2
0 to 3
20
220 to 330
14 to 16
30
110 to 220
10 to 14
40
11 to 110
5 to10
10a
0 to 11
0 to 5
20
550 to 770
18 to 20
30
220 to 570
14 to 18
40
22 to 220
6 to 14
10a
0 to 22
0 to 6

4a

20
770 to1353
20 to 24
30
330 to 770
16 to 20
40
33 to 330
7 to16
10a
0 to 33
0 to 7
20
1540 to 2200
26 to 28
30
1100 to 1540
20 to 26
40
55 to 1100
8 to 20
10a
0 to 55
0 to 8
20
1870 to 3520
28 to 34
30
1100 to 1870
22 to 28
40
110 to 1100
10 to 22
10a
0 to 110
0 to 10
20
4400 to 5940
35 to 39
30
2200 to 4400
28 to 35
40
220 to 2200
14 to 28
10a
0 to 220
0 to 14
20
7000 to 10000
42 to 47
30
4000 to 7000
35 to 42
40
400 to 4000
16 to 35
10a
0 to 400
0 to 16

(a) Furnish spall and rock fragments graded to provide a stable dense mass.

(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.

(c) Furnish rock with breadth and thickness at least one-third its length.

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

802 Road Storage 802.01 Service Required Remove and dispose or stockpile culverts and bridges, construct fords and waterbars, place excavated material on roadway according to drawings to allow OHV passage on roads identified as OHV trails, clear roadway of brush for project access, repair rough road surfaces with locally available rock borrow, and seed and fertilize bare organic soils in accordance with the applicable specifications and drawings. Bridge removal may include bucking stringer logs to facilitate handling with smaller excavators. Bridge stringer logs may not be left in streams, but may be partially suspended over streams when anchored to stream banks as directed by the engineer.

802.02 Performance Standards A road is stored when the designated drainage structures are removed or constructed, the ditches are operating free of blockages, and all bare organic soils have been treated with seed and fertilizer.

802.03 Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

802.04 Measurement Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

802.05 Payment A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 802 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.