Questions_technical_proposals.docx

DOCX document 15 KB Posted

Attached to
Two-Phase Design-Build PNW Juneau Forestry Science Lab Federal contract opportunity
Solicitation number
AG-0109-S-10-0004
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Questions Technical Proposals

View the file

Other files for this federal contract opportunity

Other files attached to Two-Phase Design-Build PNW Juneau Forestry Science Lab, newest first.
File Type Posted
Short Listed Contractors - AG-0109-S-10-0004.docx DOCX document
Amendment_04.docx DOCX document
Amendment_03.docx DOCX document
DBA_ mod_4.htm HTM file
Questions_Responses.docx DOCX document
Amendment_02.rtf RTF text file
Updated_Agenda_Items_Discussed_PreProposal_Meeting_051310.docx DOCX document
Atttendence_Pre_Proposal_Meeting_10_May_2010.pdf PDF
Past Performance Reference Questionnaire_12May2010.docx DOCX document
Pre_Proposal_Meeting_attendance.docx DOCX document
SF 30 - 01.docx DOCX document
Site Development Plan Sketch.pdf PDF
Table_Contents_Two-Phase_Design-Build_PNW_Juneau_Lab.docx DOCX document
Return_package.docx DOCX document
Issued_solicitation_AG-0109-S-10-0004_23Apr2010.pdf PDF
Pre_Proposal_Meeting_attendance.doc DOC document
VicinitymapTopoDriving.pdf PDF
Juneau SOW.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0109-S-10-0004

Two-Phase Design-Build Forestry Science Lab Amendment 04

Please confirm, Factor 4. Technical Qualifications, item B asks that all previous and current projects referenced anywhere within the proposal be accompanied by all performance evaluations or facility owner documentation. Additionally a Past Performance reference check has been supplied by the USDA.

Forest Service: The number of past performance questionnaires provided shall not exceed a total of 10 contracts. This shall include any (but not necessarily all) of the contracts listed in Factors 2 & 4.

The Proposal asks for five past projects per team member resume (a minimum of 17 positions are specified) in Factor 1. That’s a minimum of 85 performance evaluations.

Forest Service: Responses to Factor 1 are needed for the Forest Service to evaluate the professional qualifications of the contractor's team members by reviewing resumes and completed projects that indicates the experience of these individuals. The Note indicated in Factor 1 requires a maximum of five (5) completed projects but offerors have the opportunity to provide a lesser number if they feel the necessary experience has been demonstrated in their response.

Section 2A request performance evaluations for a maximum of 10 relevant projects. That’s 10 performance evaluations.

Forest Service: Up to a maximum of 10 performance evaluation using the attached questionnaire does not seem excessive.

2B is not limited in the number of examples that can be provided.

Forest Service: No minimum/maximum number is specified. Offerors must provide sufficient information in their technical proposal so the Forest Service can review and evaluate the offeror's experience and knowledge in the stated areas. Page 41 of the full solicitation package (or page 21 of the return package) indicates the maximum size of Phase 1 submittal is 50 pages.

2C & D require the team to speak to past projects – again unlimited in the number of examples.

Forest Service: No minimum/maximum number is specified. Offerors must provide sufficient information in their technical proposal s the Forest Service can review and evaluate the offeror's experience and knowledge in the stated areas. Page 41 of the full solicitation package (or page 21 of the return package) indicates the maximum size of Phase 1 submittal is 50 pages.

5A requires a list of all current commitments of all team members for projects over $50,000 – again this will be a long list of projects.

Forest Service: Limit the total current projects (for both the subconsultant/subcontractor) with a design fee of greater that $50,000 to a maximum of 10 contracts.

5B asks for experience on project delivery on several different topics – again this could generate a long list.

Forest Service: Up to a maximum of 10 contracts shall be provided.

Is it the intent of the USDA to require in excess of 150 performance evaluations? Since the performance evaluations require the response to be sent directly to the USDA representative, will the USDA be providing a list of those evaluations received to the teams for cross checking purposes?

Forest Service: As indicated above the number of past performance questionnaires provided shall not exceed a total of 10 contracts. As indicated in amendment 02 the responses to the questionnaire must be received prior to 02 June. These responses will be provided to the Forest Service evaluation team and evaluated with the technical proposals.

File details come from the government source that posted it. Updated .