Amendment_04.docx

DOCX document 24 KB Posted

Attached to
Two-Phase Design-Build PNW Juneau Forestry Science Lab Federal contract opportunity
Solicitation number
AG-0109-S-10-0004
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

SF 30 amendment 04

View the file

Other files for this federal contract opportunity

Other files attached to Two-Phase Design-Build PNW Juneau Forestry Science Lab, newest first.
File Type Posted
Short Listed Contractors - AG-0109-S-10-0004.docx DOCX document
Questions_technical_proposals.docx DOCX document
Amendment_03.docx DOCX document
DBA_ mod_4.htm HTM file
Questions_Responses.docx DOCX document
Amendment_02.rtf RTF text file
Updated_Agenda_Items_Discussed_PreProposal_Meeting_051310.docx DOCX document
Atttendence_Pre_Proposal_Meeting_10_May_2010.pdf PDF
Past Performance Reference Questionnaire_12May2010.docx DOCX document
Pre_Proposal_Meeting_attendance.docx DOCX document
SF 30 - 01.docx DOCX document
Site Development Plan Sketch.pdf PDF
Table_Contents_Two-Phase_Design-Build_PNW_Juneau_Lab.docx DOCX document
Return_package.docx DOCX document
Issued_solicitation_AG-0109-S-10-0004_23Apr2010.pdf PDF
Pre_Proposal_Meeting_attendance.doc DOC document
VicinitymapTopoDriving.pdf PDF
Juneau SOW.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
04
20 May 2010
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service 3301 C Street, Suite 300 Anchorage, AK 99503 Same as Item 6

Karen Weidenbaugh Voice: (907) 743-9569 fax: (907) 743-9492

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
|_|
AG-0109-S-10-0004

9B. DATED (SEE ITEM 11)

23 April 2010

|_|
10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

|_| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |_| is extended, |_| is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

|_|
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
|_|
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
|_|
D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor |_| is not, |_| is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Two-Phase Design-Build Forestry Science Lab in Juneau, AK

a. The attached document is being provided in response to questions asked concerning the submission of the technical proposals.

b. Responses to the Past Performance reference checks should be provided to kweidenbaugh@fs.fed.us and denisemurphy@fs.fed.us. These must be received prior to 02 June 2010 @ 2:00 pm (Alaska time).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KAREN WEIDENBAUGH

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a) Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

(b) Item 3 (Effective Date).

(1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

(2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

(3) For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

(4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

(5) For a modification confirming the contacting officer’s determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(c) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

(d) Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor’s name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

(e) Item 9, Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. – Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the orginal solicitation, contract, or order.

(f) Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(1) Accounting classification __________ Net increase $__________

(2) Accounting classification __________ Net decrease $__________

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words “See continuation sheet”.

(g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

(h) Item 14 (Description of Amendment/Modification.

(1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

(2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $________

(ii) Total contract price decreased by $________

(iii) Total contract price unchanged.

(3) State reason for modification.

(4) When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(5) When the SF-30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to –

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(6) Include subject matter or short title of solicitation/contract where feasible.

(i) Item 16B. The contracting officer’s signature is not required on solicitation amendments. The contracting officer’s signature is normally affixed last on supplemental agreements.

STANDARD FORM 30 BACK (REV. 10-83)

File details come from the government source that posted it. Updated .