Advertisement for Bids Dental Cooling Rev-1.pdf
PDF 13 MB Posted
- Solicitation number
- 24-173129 -2
- Issued by
- Arapahoe County, Aurora City, Colorado
About this file
This is an Advertisement for Bids (AFB) issued by the University of Colorado Anschutz Medical Campus for the Dental School - Revisit 3rd and 4th Fix Cooling Issues project. The project seeks bids from General Contractors and/or Mechanical/Plumber/Electrical Contractors to modify the existing HVAC system on the 2nd, 3rd, and 4th floor office areas. Specific modifications include replacing Variable Air Volume (VAV) boxes, replacing low-pressure ductwork distribution, replacing slot diffusers, adding return grills, re-balancing new VAVs, and installing new hydronic control valves and piping. The estimated construction cost is $480,000. Key dates include a mandatory pre-bid meeting on September 23, 2024, at 9:00 AM, with email questions due by September 30, 2024, at 1:00 PM. Sealed bids are due on October 14, 2024, at 1:00 PM, with a public bid opening via Zoom at 1:30 PM the same day. The anticipated construction start is November 4, 2024, with an expected completion date of January 10, 2025.
Bidders must meet specific minimum requirements, including providing general contracting services for at least two projects over $600,000 in the past three years, demonstrating specific experience, and showing bonding capability. The project is subject to state prevailing wage requirements for contracts over $500,000, and contractors must comply with the Buy Clean Colorado Act for eligible materials. Contractors will be required to use the LCPTracker cloud-based labor compliance system and provide Environmental Product Declarations (EPDs) for specified materials. Preference will be given to Colorado resident bidders, and a Bid Bond of 5% is required for construction values of $50,000 or more. The project will be awarded based on the lowest responsible bidder, with the possibility of deductive or additive alternates being considered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1 pg. 1
REV 1/2024
ADVERTISEMENT FOR BIDS
Design/Bid/Build State of Colorado
Anschutz Medical Campus Notice Number: PN 24-173129
Project No: 24-173129
Project Title: Dental School – Revisited 3rd and 4th Fix Cooling Issues
Estimated Construction Cost: $480,000.00
Settlement Notice For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
Project Description
The University of Colorado Anschutz Medical Campus seeks Bids from General
Contractors and/or Mechanical/Plumber/Electrical Contractors for this project. The project will be conducted in the CU Anschutz School of Dental Medicine on the East side of the 2nd, 3rd, and 4th floors office area. To resolve the heating and cooling issues being experienced in these areas, the following modifications will be provided to the existing system:
1. Existing VAVs; where indicated on plans, will be replaced with new ones to provide additional airflow to zones. Downstream distribution and linear slot diffusers will be replaced to accommodate the increased airflow.
2. Acoustically lined transfer ducts will be provided, as required, through full-height fire-rated walls to establish/maintain the return air pathway back to central air handlers serving each floor.
3. The piping serving existing perimeter baseboard heaters will be modified to provide 2 separate zones on each floor.
The Mechanical/Plumber/Electrical Contractor can be the prime for this Project and will include cost bid allocation to secure drywall patching and repair and painting to match the existing of all areas.
OSA-AFB-1 pg. 2
Scope of Services
The University of Colorado Anschutz Medical Campus anticipates the Contractor to provide construction services, necessary materials, and labor for the Project to complete all work according to published project schedule deadlines. The project will be conducted in the CU Anschutz School of Dental Medicine on the East side of the 2nd, 3rd, and 4th floors office area. The work will consist of the following: install new Variable Air Volume (VAV) Boxes, replace low-pressure ductwork distribution, replace slot diffusers, add perforated return grills into ceiling grid, re-balance new VAVs, reuse and reconnect thermostat to new VAV box, integrate new controls with the existing building temperature control system, install new hydronic control valves, new hydronic piping distribution with insolation, provide new 1” acoustically lined transfer ducts in ceiling plenum to establish return air pathway back to air handler.
The following items are requirements and points of clarification for the Project.
• If the Contractor's bid goes over $500,000.00 Prevailing Wage requirements need to be included in the bid.
• Mechanical Contractor can be the prime on this Project and will include cost bid allocation to secure drywall patching and repair and painting to match existing paint of all areas.
• All ceiling and wall-mounted fire sprinklers to be protected and remain in place during construction. There is no modification to the existing fire system assumed in the scope of work. If required, coordinate with facilities management for shut-off locations and local fire officials for jurisdictional requirements for temporarily disabling water to affected areas during construction, in order to temporarily disconnect and reconnect sprinkler heads. All duct runs are to be field coordinated with existing conditions.
• Temporarily remove, protect, and reinstall any lighting or ceiling-mounted fixtures as required to perform new work.
• Ensure all new fire/smoke dampers are installed, functioning, and readily accessible. Provide access panels where required.
• Coordinate any work that may disrupt adjacent offices or laboratories in advance with the Project Manager. It is anticipated the majority of work will be performed during normal operating business hours. If required, any work in areas that may not be disrupted shall be coordinated with the facilities PM and will need to be performed between the hours of 6:00 pm and 7:00 am or on weekends.
Minimum Requirements
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Provided General Contracting services within the last three (3) years for at least two (2) projects each over $ 600,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and
OSA-AFB-1 pg. 3
2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and
3. Demonstrated bonding capability up to $600,000.00 for an individual project coincidentally with current and anticipated workloads; provide a letter from the surety that affirms this capacity.
4) Per C.R.S. §24-92-115 unless prohibited by applicable federal law, a contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.
5) Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors.
Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.
Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements.
The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
Bid Documents
Available on Bidnet website:
https://www.bidnetdirect.com/colorado/universityofcoloradodesignandconstruction
OSA-AFB-1 pg. 4
Other Information
Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
Pre-Bid Meeting
A mandatory Pre-Bid Meeting will be held at:
Address: 13121 E. 17th Avenue, Aurora, CO 80045
Room: ED 2 Room L28-1102
Date/Time
September 23, 2024, 9:00 AM
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
DATE TIME
Advertisement 09/13/2024
Mandatory Pre-Bid Conference and Tour 09/23/2024 9:00 AM
Date Email Questions Due Thru Bidnet 09/30/2024 1:00 PM
Date Email Answers Issued 10/07/2024 1:00 PM
Sealed Bids Due 10/14/2024 1:00 PM
Public Bid Opening via Zoom 10/14/2024 1:30 PM
Negotiation of General Contractor Contract 10/14/2024
Contract Approval (projected) 10/28/2024
Anticipated Design Start Complete
Anticipated General Contractor Start 11/04/2024
Anticipated Construction Finish 01/10/2025
2. Bids are due 10/07/2024 and shall be received no later than 1:00 PM (MD/ST) and shall be submitted/accepted via Bidnet project Advertisement.
Comments: Late sealed bids will be rejected without consideration. The University of Colorado – Anschutz Medical Campus and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on Bidnet website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
OSA-AFB-1 pg. 5
Point of Contact/Clarification
Name: Andy Madsen
Agency: University of Colorado Anschutz Medical Campus (GFE)
Phone: 303-880-7569
Email: Andy.madsen@cuanschutz.edu
This Notice is also available on the web at:
Media of Publication(s): Bidnet
Publication Dates: 9/13/2024
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13)
Appendix B1: Bid Alternates (SBP-6.131) N/A
Appendix B2: Unit Pricing (SBP-6.133) N/A
Appendix B3: Bid Bond (SBP-6.14)
Appendix B4: SCPP Subcontractor Verification Form N/A
Appendix B5: Prevailing Wage and Apprenticeship Acknowledgement (If applicable)
Appendix C: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe Rates
(If Applicable)
Appendix E: Apprenticeship Utilization Certifications (SBP-6.17) N/A
Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s Agreement and
General Conditions of the Contract)
Exhibit A
Appendix A
INFORMATION FOR BIDDERS
(SBP-6.12)
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
INFORMATION FOR BIDDERS
Institution or Agency: University of Colorado Denver – Anschutz Medical Campus
Project No./Name: PN24-173129 / Dental School Revisit 3rd and 4th Fix Cooling Issues
1. BID FORM: Bidders are required to use the Bid form attached to the bidding documents. Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, also in calendar days. Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
INSTRUCTIONS FOR ELECTRONIC BID SUBMISSION
Bids shall be submitted/accepted via Bidnet Project Advertisement. Address for the Bidnet Project Advertisement website:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of an addendum.
3. APPLICABLE LAWS AND REGULATIONS: The bidder’s attention is called to the fact that all work under this
Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the
General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of
Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The bidder’s attention is called to the fact that the Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing.
Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two (2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal
Representative. Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with deductible alternates, deducted in numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid plus all additive alternates added in the numerical order in which they are listed in the alternates bid form provided by the
Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
10. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation
(Advertisement for Bids, Documented Quotes, or Requests for Proposals) whether settlement will be advertised in newspapers or electronic media.
Exhibit B
Appendix B
BID FORM
(FORM SBP-6.13)
State Form SBP-6.13
Rev 07/2022
STATE BUILDINGS PROGRAMS
BID
Institution/Agency: University of Colorado / Anschutz Medical Campus
Bidder Acknowledges Receipt of Addenda Numbers:
Bidder Anticipates Services outside the United States or Colorado:* No ☐ Yes ☐ If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes☐ No ☐ If No see 3B below Bidder is a Service-
Disabled Veteran Owned Small Business:* No ☐ Yes ☐ If Yes see 3C below
Base Bid $
(Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable)
Bidder’s Time of Completion
a. Time Period from Notice to Proceed to Substantial Completion: 60 Days
b. Time Period from Substantial Completion to Final Acceptance: 10 Days
c. Total Time of Completion of Entire Project (a + b): 70 Days
1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
A. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *
B. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project. Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *
C. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs. Attach proof of certification along with the bid submission. *
D. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S. 24-92-115
E. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than
State Form SBP-6.13
Rev 07/2022 thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above.
If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.
Dated this Day of , 20
THE BIDDER:
Company Name Address (including city, state and zip)
Phone number:
Name (Print) and Title Signature
Exhibit B3
Appendix B3
BID BOND
(FORM SBP-6.14)
STATE BUILDINGS PROGRAM
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.
WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.
NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, wi thin the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, and Certificates of Insurance, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.
IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this day of , A.D., 20 .
(Corporate Seal) THE PRINCIPAL
Company Name
ATTEST
Address (including city, state and zip)
Secretary Phone number:
Name (Print) Signature
Name (Print) and Title
SIGNATURES If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.
If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.
(Corporate Seal) THE SURETY
By
Secretary Attorney-in-Fact
THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.
FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER OF ATTORNEY
WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.
SBP-6.14
Rev. 7/2022
Exhibit B4
Appendix B4
SCPP SUBCONTRACTOR VERIFICATION
madseand Text Box Not Required
Exhibit B5
Appendix B5
PREVAILING WAGE AND APPRENTICESHIP ACKNOWLEDGEMENT
August 9, 2024 Page 1 of 1
Acknowledgement of Prevailing Wage and Apprenticeship Requirements
Institution/Agency: University of Colorado | Anschutz Medical Campus
Project No./Name: PN24-173129 | Dental School Revisit 3rd and 4th Fix Cooling Issues
If the Bid amount exceeds $500,000, the Bidder acknowledges that applicable Prevailing Wages have been included in the Bid and Bidder will comply to Certified Payroll Transcript (SBP-7.21) reporting requirements
If the Bid amount exceeds $1,000,000, the Bidder acknowledges that the applicable subcontractors included in their Bid comply with Apprenticeship Utilization requirements and Bidder will provide with the Apprenticeship Utilization Certification (SBP-2.1).
THE BIDDER:
Company Name
Signature Date
Exhibit C
Appendix C
Direct Labor Burden Calculation
(FORM SBP-6.18)
(SAMPLE)
STATE BUILDINGS PROGRAM
DIRECT LABOR BURDEN CALCULATION
Contractor/Subcontractor Name:
Percent of Salary Paid
Payroll Taxes
Pension Costs
Health Insurance
Dental Insurance
Life Insurance
Other (Specify) Description:
Other (Specify) Description:
Total Labor Burden: 0%
State Form SBP–6.18 Issued 7/2022
This form is required to be submitted for review prior to execution of a construction agreement.
List items below by the percentage of what makes up the total labor burden; Items include benefits that a contractor pays to employees on their payroll. Examples include taxes, pension cost, health and dental insurance etc. The Labor Burden amount must be agreed to by both the contractor and Principal Representative and will be included in the contract as part of Exhibit A and will be used in the calculation of any future Change Order Proposals (SC-6.312) Line 2.
Major sub-contractors defined as electricians, plumbers, mechanical contractors, excavators, millwork, concrete, block layers etc. Please provide one (1) Labor Burden Calculation Sheet per contractor and for each sub-contractor. These labor burdens shall be used in the calculation of any future Change Order Proposals (SC-6.312) Line 10.
State reserves the right to require back-up confirmation of all information included in this calculation.
Exhibit D
Appendix D
APPLICABLE PREVAILING WAGE and APPRENTICESHIP and FRINGE RATES
"General Decision Number: CO20240015 05/31/2024
Superseded General Decision Number: CO20230015
State: Colorado
Construction Type: Building
County: Adams County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 02/23/2024 2 05/17/2024 3 05/31/2024
* CARP0055-004 05/01/2024
Rates Fringes
CARPENTER (Includes Acoustical Ceiling Installation and Drywall Hanging; Excludes Metal Stud Installation)....................$ 35.10 13.41
CARP1607-001 06/01/2023
Rates Fringes
MILLWRIGHT.......................$ 41.19 16.74
ELEC0068-012 06/01/2023
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 43.20 18.38
ELEV0025-001 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 54.20 37.89
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0009-017 05/01/2023
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane) 141 tons and over...........$ 38.63 14.25 50 tons and under...........$ 34.77 14.25 51 to 90 tons...............$ 35.07 14.25 91 to 140 tons..............$ 36.27 14.25
IRON0024-009 11/01/2023
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 37.23 12.50
IRON0024-010 11/01/2023
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 37.23 12.50
PAIN0079-006 08/01/2022
Rates Fringes
PAINTER (Brush, Roller and Spray; Excludes Drywall Finishing/Taping)................$ 25.11 10.95
PAIN0419-001 06/01/2022
Rates Fringes
SOFT FLOOR LAYER (Vinyl and Carpet)..........................$ 18.25 14.33
PAIN0930-002 07/01/2023
Rates Fringes
GLAZIER..........................$ 33.51 12.65
PLUM0003-009 06/01/2023
Rates Fringes
PLUMBER (Excludes HVAC Duct, Pipe and Unit Installation)......$ 42.98 19.77
PLUM0208-008 06/01/2023
Rates Fringes
PIPEFITTER (Includes HVAC Pipe and Unit Installation;
Excludes HVAC Duct Installation)....................$ 41.50 21.90
SFCO0669-002 04/01/2024
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 45.44 26.98
SHEE0009-004 07/01/2023
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation;
Excludes HVAC Pipe and Unit Installation)....................$ 38.47 20.83
* SUCO2013-001 07/31/2015
Rates Fringes
BRICKLAYER.......................$ 21.96 0.00
CARPENTER (Metal Stud Installation Only)...............$ 17.68 0.00
CEMENT MASON/CONCRETE FINISHER...$ 20.33 6.76
DRYWALL FINISHER/TAPER...........$ 18.77 6.37
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 21.49 5.20
LABORER: Common or General......$ 14.93 ** 4.24
LABORER: Mason Tender - Brick...$ 15.99 ** 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 16.00 ** 0.00
LABORER: Pipelayer..............$ 16.96 ** 3.68
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.78 5.78
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 19.10 3.89
OPERATOR: Grader/Blade..........$ 21.50 0.00
ROOFER...........................$ 16.96 ** 0.00
TRUCK DRIVER: Dump Truck........$ 17.34 0.00
WATERPROOFER.....................$ 16.94 ** 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
January 2024
TRADE
Local Union #101
Geographic Region: Colorado Apprenticeship Rate $ 1.50
International Union of Bricklayers and Allied Craft Workers (CO/WY)
Local Union #07
Geographic Region: Colorado unless noted otherwise
Refractory Projects Apprenticeship Rate $ 0.25
Tile, Terrazzo, Marble Stone, Finishers Apprenticeship Rate $ 0.35
Apprenticeship Rate $ 0.25
Apprenticeship Rate $ 0.25
Carpet, Linoleum and Resilient Tile Layers (IUPAT)
Local Union #419
Geographic Region: Apprenticeship Rate $ 0.29
Glazier, Architectural Metal and Glass Workers, (IUPAT)
Local Union #930
Geographic Region: Colorado Apprenticeship Rate $ 0.80
COLORADO APPRENTICE/JOURNEYMEN TRAINING
International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers and Helpers
Any member of The International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers and
Helpers may call himself or herself a Boilermaker, and many do even though they do not actually work in boiler construction and repair. Many also refer to themselves by some other trade our union represents through its many divisions. So you may hear our members refer to themselves as blacksmiths, forgers, ship builders, cement workers, stove workers, metal polishers, or numerous other job descriptions.
Our members fabricate, erect and repair systems and components throughout the commercial and industrial sector of the Power Generation, Pollution Control, Petro-Chemical, Steel, Pulp & Paper, Ship Repair, Mining, Storage Tanks, Towers & Pressure Vessels, Cement and other related industries.
description here
Masonry - Northern Counties
Masonry - Southern Counties
Floor and decorative covering workers’ work will includes measuring, cutting, fabricating, fitting, installing to be cemented, tacked or otherwise applied to its base and/or underlayment(s); whether used either as a decorative covering, topping or as an acoustical appliance such as carpets, sheet rubber, sheet linoleum, sheet vinyl, laminate floors and laminate floor systems, rubber tile, linoleum tile, asphalt tile, cork flooring, interlocking tile, vinyl tile, vinyl composition tile, composition in sheet or tile form, top set base of any kind including profile rubber base, and all derivatives of above; artificial turf and its derivatives which includes the operation, maintenance and repair of the following equipment when used in the installation of artificial turf and its derivatives (forklifts, air compressors and any attachments, skid steer, skip loader, utility cart/top dresser and lay-more ride on sweeper); all resilient seamless materials such as epoxy, polyurethane, plastics, resinous and liquid flooring and their derivatives; installation of solid wood and solid glue down wood;
The fitting of all devices for the attachment of the above materials and the fitting of all decorative or protective trim to and adjoining the above materials this also includes but is not limited to sanding, substrate preparation and the application of all self-leveling, trowelable and board underlayments; the removal of the aforementioned installed material from its base and/or underlayments as required; the cleaning of rugs or carpets and all drapery, make-up and the installation of drapes and window treatments; the application of moisture barrier and/or membrane in connection with the installation and flooring covered above.
The Glazing industry is comprised of many facets and applications of construction technology. Glaziers cut, install and replace all types of glass related products in commercial and residential window, storefront, skylight, architectural panel and curtain wall systems. They are proficient in the installation of all types of aluminum and glass doors, understand the intricacies of waterproofing and flashing, as well as the ability to perform quality custom shower door and mirror work.
The Journeyman Glazier possesses an understanding of math and layout skills, an ability to read shop drawings and blueprints and is trained to feel comfortable with a builder’s level, laser level or the use of today’s most sophisticated power tools to perform their work. Naturally the Glazier is safely at home in or on most scaffoldings, aerial stages, lifts and platforms. Journeyperson status is achieved after completion of a three (3) year- state certified apprenticeship.
SBP-Apprenticeship 07/2021 1 of
Painters and Drywall Finishers (IUPAT)
Local Union #79
Geographic Region: Colorado Apprenticeship Rate $ 0.30
Operative Plasterers and Cement Masons International Association
Local Union #577
Geographic Region: Colorado Apprenticeship Rate $ 0.60
International Brotherhood of Electrical Workers (IBEW)
Local Union #111
IBEW-Grand Junction Electrical Apprenticeship
Geographic Region: Zone 1 Apprenticeship Rate $ 0.84
Geographic Region: Zone 2 Apprenticeship Rate $ 0.84
Geographic Region: Zone 3 Apprenticeship Rate $ 0.84
International Brotherhood of Electrical Workers (IBEW)
Local Union #68
Geographic Region: Commercial Apprenticeship Rate $ 0.63
Residential Apprenticeship Rates $ 0.17
International Brotherhood of Electrical Workers (IBEW)
Local Union #12
Geographic Region: Commercial Apprenticeship Rate $ 0.60
Residential Apprenticeship Rate $ 0.23
International Brotherhood of Electrical Workers (IBEW)
Local Union #113
IBEW-Colorado Springs Joint Electrical Apprenticeship
Geographic Region: El Paso County Apprenticeship Rate $ 0.75
International Union of Elevator Constructors
Painters apply paint, stain, varnish, and other finishes to residential, commercial and industrial structures. They are able to choose the right paint or finish for the surface to be covered by taking into account durability, ease of handling, method of application and customer desires.
Drywall finishers (or tapers) prepare unfinished interior drywall panels for painting by taping and finishing joints and imperfections.
Concrete: The following are but a few examples of the wide range of job descriptions for concrete and concrete finishers who place and finish, including all types of repairing of this solid rock material. Concrete tradespeople work on commercial residential and heavy & highway construction, curb and gutter, decorative concrete, concrete flatwork, epoxy coatings, waterproofing, grouting and shotcrete, including but not limited to the setting of concrete forms.
Plasterer: The following are examples of the various plaster products and the skill sets of OPCMIA members that utilized in the walls and ceiling industry today: exterior insulation finish systems (EIFS), fireproofing, free form & theme plastering, historical restoration, interior gypsum plaster, motion picture & special effects, Portland cement plaster (Stucco), specialty & colored finishes.
Outside Linemen: Electrical linemen build and maintain power lines. They work on high-voltage transmission lines, substations, distribution lines.
Inside Wiremen: Inside Wiremen install conduit, electrical wiring, fixtures, and electrical equipment inside commercial buildings and in industrial settings, digging, climb ladders and work in cold and hot environments.
Telecommunications Installer-Technicians, also known as VDV and equipment for telephones, computer networks, video distribution systems, security and access control systems, and other low voltage systems in residential, commercial and industrial settings.
description here
Outside Linemen: Electrical linemen build and maintain power lines. They work on high-voltage transmission lines, substations, distribution lines.
Inside Wiremen: Inside Wiremen install conduit, electrical wiring, fixtures, and electrical equipment inside commercial buildings and in industrial settings, digging, climb ladders and work in cold and hot environments.
Telecommunications Installer-Technicians, also known as VDV and equipment for telephones, computer networks, video distribution systems, security and access control systems, and other low voltage systems in residential, commercial and industrial settings.
SBP-Apprenticeship 07/2021 2 of
Local #25
Geographic Region: Colorado Apprenticeship Rate $ 0.70
International Association of Heat and Frost Insulators and Allied Workers
Local Union #28
Geographic Region: Colorado Apprenticeship Rate $ 1.00
International Association of Bridge, Structural, Ornamental, and Reinforcing Iron Workers
Local Union #24
Industrial Apprenticeship Rate $1.84
Commercial Apprenticeship Rate $0.48
Geographic Region: Colorado
Laborers’ International Union of North America (LIUNA)
Local Union #720
Geographic Region: Colorado Apprenticeship Rate $ 0.68
International Union of Operating Engineers
Local Union #9
Geographic Region: Colorado Apprenticeship Rate $ 1.00
Pipefitters (United Association-UA)
Local Union #208
Geographic Region: Denver & Northern Colorado
Commercial Apprenticeship Rate $ 0.78
Industrial Apprenticeship Rate $ 0.78
Service Apprenticeship Rate $ 0.80
Plumbers &…