About this file
This Additional Terms and Conditions document outlines the bidding procedures and requirements for the Alabama Department of Transportation's procurement of one Gyratory Compactor and Cooling Door Kit to be delivered to the ALDOT Material and Test Bureau in Montgomery, Alabama. Prospective suppliers must submit bids through the Alabama Buys supplier portal by selecting the sourcing project, completing all required tabs and questionnaires, and validating their submission. Questions regarding the ITB must be submitted through the Discussions tab of the portal by Monday, August 3, 2026. Award will be made on an "all or none" basis to the lowest responsible bidder meeting all specifications. All equipment, parts, and consumable items must be new, unused, and eligible for full manufacturer warranty; reconditioned, remanufactured, or refurbished items are not acceptable unless demo units are disclosed in writing and accepted by the using agency with full factory warranty provided. Bidders must provide complete descriptive and technical literature with their bid submission, as references to previous bid literature will not be accepted.
Awarded suppliers must submit E-Verify documentation as required by Section 13 of the ITB Standard Boilerplate and must complete a Vendor Disclosure Statement upon notice of intent to award. All awarded suppliers must maintain full registration and active status in the Alabama Buys system. Suppliers have five days from receipt to provide any additional requested information; failure to respond may result in bid rejection. Line seven of the item grid, designated for Freight, must be entered as 0.00 as this line item will not be included in the evaluation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB Standard Boilerplate.pdf | ||
| Agency Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Terms and Conditions
Bid Submission Instructions:
Beginning on the Alabama Buys supplier portal page, select the desired sourcing project.
Once project is opened, make sure the left panel is expanded. If not, click on small double arrows to expand. Click the “Participate in RFX button”. You will be prompted to log in and register. Be sure to review each tab for necessary information and enter bid amounts on item grid as needed. After you have checked and completed each tab, as well as any applicable questionnaire, you can validate and submit your bid.
Requested Information:
If any additional requested information related to this ITB is requested from the suppliers, the information must be provided within five (5) days from receipt of request. Failure to provide the requested information may result in bid rejection.
Questions:
Questions must be submitted through the supplier portal in Alabama Buys from the Discussions tab by Monday, August 3, 2026.
Award:
Award will be made "all or none" to the lowest responsible bidder meeting all specifications.
Suppliers must enter 0.00 in the unit price field of line seven (Freight), as this line will not be included in the evaluation.
New equipment:
All equipment, parts, and consumable items provided by the supplier as part of the fulfillment of the resulting contract must be new, unused, and eligible for full manufacturer warranty. Equipment and parts provided cannot be reconditioned, remanufactured, or refurbished in any manner and cannot have been used in any capacity, outside of factory testing and transport. Demo units are only acceptable upon full disclosure to and written acceptance by the using agency and when provided with a full factory warranty.
Descriptive Literature:
Suppliers must provide complete descriptive/technical literature for consideration and evaluation with their bid. Reference to literature with a previous bid will not satisfy this requirement. Failure to provide the required literature may result in the rejection of the bid response.
Requirements:
Awarded suppliers will be required to submit E-Verify documentation – see section 13 of the ITB Standard Boilerplate Awarded suppliers will be required to submit a completed Vendor Disclosure Statement, which will be provided to the awarded suppliers upon notice of intent to award.
Awarded suppliers must be fully registered and active in Alabama Buys.