Addendum No. 1_signed.pdf
PDF 221 KB Posted
- Attached to
- Citywide Trash Capture, Phase II
- Solicitation number
- 22-40
- Issued by
- Santa Clara County, California
About this file
Addendum No. 1 is an official document issued by the City of Mountain View, California, for the Citywide Trash Capture, Phase II Project (Project 22-40). The addendum modifies the original contract documents and specifications, specifically replacing the cover page with an attached signed copy. The project involves the procurement, delivery, measurement, and installation of 207 Triton Perf-Full Trash Capture Filter devices manufactured by Revel Environmental Manufacturing, Inc. (REM) in designated storm drain catch basins throughout the city. The contractor will be responsible for providing all necessary labor, materials, equipment, and incidentals to install the devices according to manufacturer specifications and regulatory requirements.
The addendum was distributed on April 3, 2025, via BidNet Direct and Prints Charles to existing and potential plan holders. Bidders are required to acknowledge receipt of this Addendum No. 1 in the Proposal Form, specifically on page 11-PF-4. The document was signed by Edward Arango, Assistant Public Works Director/City Engineer, on April 2, 2025. No specific pricing terms, set-asides, or funding sources are detailed in this addendum, which appears to be a procedural update to the original contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2_signed.pdf | ||
| copy_955-03-28-25F130.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF MOUNTAIN VIEW
MOUNTAIN VIEW, CALIFORNIA
ADDENDUM NO. 1
TO SPECIFICAT IONS
FOR
Citywide Trash Capture, Phase II
Project 22-40
The following addition and/or changes hereinafter set forth shall apply to the Specifications for this project and shall be made a part hereof and subject to all the requirements thereof, as if originally specified and/or shown:
Revision to the cover page of the contract documents and specifications:
1. Replace: Cover page with the attached signed copy (attachment 1)
This Addendum No. 1 contains a total of 2 pages, including attachments. All other provisions remain in effect.
Bidders shall acknowledge receipt of this Addendum No. 1 in Proposal Form, page 11-PF-4
Edward Arango
Assistant Public Works Director/City Engineer
Date: April 2, 2025
Distributed via Bid Net Direct and Prints Charles to existing and subsequent plan holders on April 3, 2025 cc: PCE- Tseng, PCE -Shah, SCE-Chou, ACE - Husaini