Addendum No. 1.pdf
PDF 484 KB Posted
- Solicitation number
- IFB-123202
- Issued by
- Henrico County, Virginia
About this file
This is Addendum No. 1 to Invitation to Bid (ITB) No. 26-2963-5JL issued by the County of Henrico, Virginia Department of Finance, Purchasing Division for Three Chopt Road Improvements. The project involves construction of a realigned Three Chopt Road for 2.174 miles, including existing road widening, reconstruction and realignment with new road construction featuring curb and gutter, sidewalk, enclosed and open storm drainage, box culvert construction, and water and sewer improvements and pavement. The addendum revises critical project dates: the bid receipt date and opening date are both changed to August 20, 2026 at 2:00 PM, representing a significant extension from the originally stated due date of July 30, 2026. The extension was granted to allow prospective bidders adequate time to evaluate and estimate the large scope of work. Bidders must acknowledge receipt of this addendum on their bid forms, as failure to do so may result in bids being declared non-responsive. The contract specifies a completion timeline of 1,278 calendar days after issuance of the Notice to Proceed, with liquidated damages enforceable by the County for failure to meet this deadline.
The addendum includes substantive project manual revisions, including a change to Item 35 quantities on the Schedule of Bid Items to 42 units and the addition of a Stormwater Management Facility Construction Record Drawing and Final Conformance Acceptance Inspection Administrative Policy as Item #93 under the appendix. A revised Unit Price Bid Sheet Price Schedule (AD-01) replaces the original pricing document, requiring all bidders to submit pricing on the revised schedule. The addendum addresses bidder questions regarding the provision of CAD files, which will be made available to the successful bidder only after project award. All other general terms, conditions, and specifications from the original ITB remain unchanged unless specifically modified by this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF HENRICO, VIRGINIA – Department of Finance, Purchasing Division 8600 Staples Mill Road / P.O. Box 90775 / Henrico, VA 23273-0775
Phone: (804)501-5660 Version 4.13.26
Addendum No. 1
Date: July 21, 2026 Invitation to Bid: 26-2963-5JL – Three Chopt Road Improvements Receipt Date/Time: August 20, 2026 (Changed) Opening Date/Time: August 20, 2026 (Changed) Subject: Bid Receipt and Opening Date Revision, Questions & Anwers, Project
Manual Revisions, and Revised Unit Price Bid Sheet Price Schedule
Prospective Bidder and Others Concerned, The following changes, corrections, deletions, clarifications, and/or additions constitute Addendum No. 5:
Bid Receipt and Opening Date Revision
1. The Bid Receipt Date is changed to August 20, 2026 at 2:00 PM.
2. The Bid Opening Date is changed to August 20, 2026 at 2:00 PM.
Questions & Anwers
1. Question: Would the County provide electronic/Cad files?
Answer: Cad files will be provided to the Successful Bidder after the award of this project.
2. Question: The ITB Notices states bids are due 8/6/2026 as does the County website.
However, the ITB, page ITB-1, states bids are due 7/30/2026. Please confirm 8/6/2026 is the correct due date.
Answer: New bid receipt date is changed to August 20, 2026 at 2:00 PM.
3. Question: Has there been a decision on providing additional time for preparation of bids for the Three Chopt Road Improvements Project? We have interest, but it is a large scope of work that requires time to evaluate and estimate.
Answer: Bid receipt date is extended to August 20, 2026, at 2:00 PM.
Project Manual Revisions:
1. DELETE first paragraph under Time of Completion in Bid Form, page BF-2 in its entirety and
REPLACE it with the following:
The Work shall be completed Contractor and certified by the Owner within 1,278 calendar days after the date of the written Notice to Proceed from the Owner to the Contractor. If work is not completed by the deadline established in the sentence immediately preceding this one, the Owner shall enforce Liquidated Damages on the Contractor.
2. DELETE eighth paragraph in Sample Unit Price Contract, page UPC-1 in its entirety and REPLACE it with the following:
The Work shall be completed Contractor and certified by the Owner within 1,278 calendar days after the date of the written Notice to Proceed from the Owner to the Contractor. If work is not completed by the deadline established in the sentence immediately preceding this one, the Owner shall enforce Liquidated Damages on the Contractor.
3. CHANGE quantity of Item 35 on Schedule of Bid Items, page SB-2, to 42.
4. ADD Stormwater Management Facility Construction Record Drawing and Final Conformance Acceptance Inspection Administrative Policy as Item #93 under Appendix. Policy is attached in Addendum No. 1.
Revised Unit Price Bid Sheet Price Schedule:
1. Replace the Unit Price Bid Sheet Price Schedule with the Revised Unit Price Bid Sheet Price Schedule (AD-01).
All other general terms, conditions and specifications shall remain the same.
Bidders must take due notice and be governed accordingly. Acknowledgement of the receipt of this addendum shall be made on your Bid Form.
Failure to acknowledge this addendum may result in your bid being declared non-responsive.
Sincerely, Jianchong Luo Purchasing Manager Luo001@henrico.gov mailto:Luo001@henrico.gov
C O M M O N W E A L T H OF V I R G I N I A
C OUNTY OF H ENRICO
Department of Public Works
Environmental Services Division Stormwater Management Facility Construction Record Drawing and Final Conformance Acceptance Inspection Administrative Policy
I. PURPOSE
A. This policy provides guidance outlining the requirements for submission, review, and acceptance of the Construction Record Drawing (CRD) set and the Final Conformance Acceptance Inspection for Best Management Practices (BMP) permanent Stormwater Management (SWM) facilities constructed within Henrico County, Virginia.
B. The policy ensures compliance with the requirements of State Water Control Law, Chapter 3.1, Code of Virginia, § 62.1 et seq. (1950 as amended); Environment, Title 9, Virginia Administrative Code, Agency 25, 9VAC25-875 et seq., "Virginia Erosion and Stormwater Management Regulation"; Environment, Chapter 10, Code of the County of Henrico, Virginia, Division 4, “Maintenance and Financial Guarantees”,§ 10-46(d), “Financial guarantee” and § 10-47 et seq., “Stormwater management facility construction record drawing”; the Virginia Department of Environmental Quality (DEQ) Stormwater Management Handbook, v1.1, 7/1/2024; and the Henrico County Environmental Compliance Manual (HCECM).
II. WHEN TO SUBMIT THE CONSTRUCTION RECORD DRAWING SET
A. Prior to conducting the Final Conformance Acceptance Field Inspection by the Henrico County BMP New Construction Acceptance Inspector, the CRD set shall be submitted. The Final Conformance Acceptance Field Inspection will review the following criteria for compliance with approved plans and revisions thereto:
recorded BMP maintenance agreement, if required, adequate underground system fill, and minimum top cover are placed, i.e., sod, stone, substrate, and pavement along with any required inspection ports and control structures, pre-cast concrete proprietary hydrodynamic treatment device components or filtering units are installed, permanent uniform and mature stabilization of slopes and embankments is present, and uniform and mature aquatic bench or bioretention plantings are present, and principal spillway risers are in final configuration. The Final Conformance Acceptance Field Inspection will verify the following: the BMP is constructed per the approved plan and applicable standard(s), either Virginia Stormwater Management Handbook (2024), Virginia Stormwater BMP Clearinghouse or HCECM and is functioning per the approved SWM plan specifications and SWM computations.
B. Submit final, attested CRDs only; preliminary submissions are not accepted or reviewed.
Policy Issued: March 22, 2024 1st Revision April 11, 2025 Page 2 of 7
DPW Environmental Services Division Administrative Policy- Stormwater Management Facility Construction Record Drawing and Final Conformance Acceptance Inspection
III. MAINTENANCE AGREEMENT AND CONSTRUCTION RECORD DRAWING SET
REQUIREMENTS
A. The BMP maintenance agreement, if required, must be recorded prior to acceptance.
B. The CRD set shall be redlined copies of the most recent approved plan sheets, sealed, and attested by a Commonwealth of Virginia Department of Professional and Occupational Regulation Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects regulant per the requirements of 9VAC25-875-535(A) and Sec. 10-47 (c) of the Henrico County Code, with the following statement on each sheet:
Pursuant to 9VAC25-875-535, I certify that to the best of my professional knowledge, the construction record drawing shows all adjustments and revisions to the stormwater management plan made during construction and serves as a permanent record of the actual location of all constructed elements per 9VAC25-875-480, Part V Technical Criteria, Article 3 (post 7/1/2024), Article 3 (formerly 2 B), or Article 4 (formerly 2 C).
Name
Signature
Virginia License
No.
Date
"Certify” means to state or declare a professional opinion based on sufficient and appropriate onsite inspections, material tests, as-built survey data, and information provided by other professionals and the contractor, conducted during or after construction.
C. The certified CRD sheet(s) must be architectural “D” size, landscape orientation, in a Portable Document Format (pdf) digital file with a digital certificate (Adobe™, Bluebeam™, Docusign™ or equivalent, not a digital image facsimile signature), submitted to the BMP New Construction Acceptance Inspector or the Environmental Compliance Specialist assigned to the project via electronic submission (email preferred); digital certificates are required to preclude misuse of sealed and attested as-built information by third parties and eliminate the need for paper copies with original signatures and seals. As-built certification forms are no longer accepted by the County of Henrico. Apart from a narrative explaining field changes not reflected in the latest approved plans, as-built certification letters are not accepted; field change explanatory letters will require graphical exhibits with seal and digital certificate affixed.
D. Each facility shall be identified by the HCECM SW Facility Designation Number per
Chapter 9 or the Stormwater Pollution Prevention Plan (SWPPP) Tab 14, for the
1st Revision April 11, 2025 Page 3 of 7
Virginia Pollution Discharge Elimination System (VPDES) permit Part 2 B Technical Criteria; VPDES Part 2 C Technical Criteria facility numbers are found in HCECM Chapter 14 or SWPPP Tab 14 (proprietary device and system facility numbers are assigned prior to the pre-construction meeting due to changing manufacturers and trademark names).
1st Revision April 11, 2025 Page 4 of 7
E. The drawings must accurately depict, presented to scale, all as-built details such as, but not limited to the following: inverts, lengths, depths, material types and sizes, grading (as-built contours with indices), and the schematic location of all required components, including weir orifices and tops, utilizing schematic details or manufacturer’s shop drawings in approved plans with the latest revision information.
F. Utilize storm profile sheets, BMP grading sheets, and details sheets (schematics) to present the required CRD information:
1. For all facilities, Virginia State Plane Coordinate System South Zone northings (y) and eastings (x) and project vertical datum elevations (z), per the project’s stated NAD83 horizontal iteration and NAVD88/geoidal vertical iteration data, shall be shown in red color with the intent to increase GIS mapping accuracy and aid in the recovery of access covers and inspection ports during facility maintenance inspections.
2. The nominal BMP overall center of footprint for all graded earthwork facilities, i.e. basins and ponds, bioretention, level spreaders, permeable pavement, rooftop gardens, swales, etc., shall be horizontally located to the nearest foot with a box (callout) northing and easting comment with a leader.
3. All graded earthwork facilities shall present as-built contours in red color, with index contours, superimposed upon the approved plan sheet grading plan which shows the BMP, including all constructed elements, e.g., forebays, channelization features; if the BMP type is a swale or incorporates concrete low flow channels, spot elevations on the swale or channel centerline are required at 25’ stations from outflow end to inflow(s) and at all intersecting channel centerlines:
a) Dry basins must drain to the low flow channel and/or orifice;
standing water is not permitted in the basin bottom; inspection criterion is 3-5 days after a measurable event.
b) Provide a benchmark with corresponding northing (y), and easting (x).
4. All basins and ponds shall have stage/storage tables redlined on the approved plan sheet on which the tables are presented to certify compliance with design storm computations.
5. All graded earthwork facilities shall present proof that there are no woody stem landscaping encroachments interfering with maintenance access or in fill
1st Revision April 11, 2025 Page 5 of 7 embankments, and that all required setbacks and screening requirements per the HCECM design criteria found in Tables 9.2 and 9.3 were met; proof is affixing and attesting the required statement, section III, B.
6. Permeable pavement curb and gutter spot elevations controlling the pavement sheet flow shall be redlined to show the as-built condition.
7. All control structures, inspection ports, permeable pavement monitoring wells, and all first upstream structures from the proprietary device or system and first downstream structure from the proprietary device or system control structure shall be located horizontally by the access (manhole or handhole) nominal centerline to 0.1’ (tenth); the overall nominal center of underground system footprint (chambers, modules, or vaults) shall be stated to 0.1’, multiple bay underground systems may require multiple coordinate pairs if the layout is not a straight alignment without deflection. Show the required information in box comments with leader lines pointing to the respective control structure, manhole, inspection port, or underground system footprint.
8. All level spreader facilities shall show as-built spot elevations along the weir and for all level spreaders in the County of Henrico BMP Maintenance Program, a 10’ width cleared and grassed turf access strip must be maintained around the entire level spreader footprint per the Chapter 14 Minimum Design Standard, 14.01:
a) The HCECM Chapter 14, Henrico County Minimum Standard 9.01
Energy Dissipator, Design “A” or “B”, shall show elevations at 5 stations along the weir: ends (2), deflection points (2), and midpoint (1).
b) Other linear designs without deflection points shall show spot elevations at weir ends and at the midpoint with station intervals not to exceed 25’.
9. All level spreaders shall show profile and cross-sectional information presented in the approved plans on the relevant sheets; the Henrico standard design shall show sections A, B, and C.
10. All rim, riser, weir, and orifice elevations shall be stated to 0.01’ (hundredth), including all underground system inspection ports (handholes or trapdoors);
all structure inverts shall be stated to 0.01’.
11. Cross-sections, details (schematics), and manufacturer’s shop drawings from the relevant approved plan sheets shall be redlined to present the as-built elevations and depths for all growing media and underground system cross-sectional fill heights.
1st Revision April 11, 2025 Page 6 of 7
12. Bioretention facilities and rooftop gardens must include a schedule stating the soil amendments and/or engineered filter media installed with certification that the growing medium meets the requirements of the specification (may require the engagement of a separate discipline other than that of the certifying regulant).
13. Bioretention facilities and rooftop gardens or facilities with aquatic plantings shall present a redlined planting schedule certifying that the stated species were planted in the types and quantities required per the spacing interval plan (may require the engagement of a separate discipline other than that of the certifying regulant).
G. NAD83 and NAVD88 data realizations will be utilized until adoption and acceptance of the new US National Geodetic Survey (NGS) National Spatial Reference System (NSRS) and American Vertical Datum (GRAV-D) by the County of Henrico.
H. For all manufactured treatment devices and systems, regardless of type, a letter is required from the manufacturer stating that all required training for proper installation of the proprietary device or system was conducted with the installing contractor’s employees and all required device or system components were delivered to the site.
Training shall be conducted at the site with the BMP Acceptance Inspector or Environmental Services Division staff attending.
I. A separate manufacturer’s activation letter is required for all proprietary filtering systems stating the date the filtering device was placed in service (filtered devices only, sediment chamber systems and hydrodynamic separation devices are excluded).
J. Geotechnical reports are required for all basin and pond embankments with over 3’ of fill height and for all chamber, oversized pipe, and module underground system excavations. Proprietary filtration systems, precast control structures and cast in place control structures will follow VDOT and Henrico County Public Works Design Manual stone bedding standards for precast concrete structures, all oversize pipe installations for underground detention, HCECM SW Facility Designation Numbers 6 and 178, will follow the pipe bedding standards.
K. All resubmissions must bear the revision date in the certification statement with an updated digital certificate.
1st Revision April 11, 2025 Page 7 of 7
IV. REVIEW AND ACCEPTANCE
A written review for each final, attested CRD set submission will be issued within a window of 15 business days after digital receipt (email or file transfer site), inspection workload permitting. Final BMP facility acceptance occurs after confirmation of recorded maintenance agreement(s), if required, receipt of a satisfactory CRD set and resolution of any noted deficiencies with facility construction, facility plantings, or facility stabilization. Environmental bond release is recommended by the Environmental Compliance Inspector assigned to the project.
The Environmental Compliance Inspector determines if overall site erosion and sediment control stabilization for the project were achieved per plan. Then, the Inspector requests submission of the completed Notification of Termination (NOT) for the VPDES permit if one was required for the project. The Environmental Compliance Inspector requests confirmation that all BMP facilities were accepted prior to initiating NOT or filing bond release paperwork for submittal to the Erosion and Sediment Control Program Manager. Confirmation of VPDES termination from DEQ is required for environmental bond release if a permit was required for the project.
| BMP_Acceptance_and_CRD_Policy_2025-04-11_1st_Rev-1.pdf-2.pdf-2-UA-1.pdf |
| I. PURPOSE |
| II. WHEN TO SUBMIT THE CONSTRUCTION RECORD DRAWING SET |
| III. MAINTENANCE AGREEMENT AND CONSTRUCTION RECORD DRAWING SET REQUIREMENTS |
| b) Provide a benchmark with corresponding northing (y), and easting (x). |
| IV. REVIEW AND ACCEPTANCE |