This is Addendum No. 1, issued February 11, 2022, for a partial roof replacement project at Cass Middle School located at 195 Firetower Road, Cartersville, Georgia 30120, under the jurisdiction of the Bartow County School System. The project concerns roof areas A, B, C, and D and is referenced as Bid No. 10-2022-004, with Raymond LLC serving as the architectural and engineering consultant (Project No. 1210.023). The addendum modifies the original construction documents to clarify specifications for the roof replacement scope of work.
The addendum implements three primary modifications to the construction documents: it adds requirements for mechanically fastened tapered insulation at Roof Areas B and C to achieve positive drainage to existing gutters; it revises Unit Price No. 4 for Steel Deck Replacement from "N/A" to an allowance of 90 square feet in the Unit Prices and Allowances exhibit; and it replaces the specification for roof board insulation installation to require tapered polyisocyanurate insulation with associated fill units as a loose-laid system over new flat insulation. All other drawings and specification sections remain unchanged. The addendum references a pre-bid meeting with attached minutes and attendee sign-in sheet.
Text of this file
1224 Royal Drive Conyers, Georgia 30094
Office: 770-483-9592
Fax: 770-483-8082 www.RaymondLLC.com
Architectural, Interior Design, Engineering, Building Envelope and Consulting Services
PARTIAL ROOF REPLACEMENT
CASS MIDDLE SCHOOL
ROOF AREAS A, B, C, & D
195 FIRETOWER ROAD
CARTERSVILLE, GEORGIA 30120
BARTOW COUNTY SCHOOL SYSTEM BID NO: 10-2022-004
RAYMOND PROJECT NO. 1210.023
Addendum No. 1 February 11, 2022
In Summary, this addendum modifies the construction documents as follows:
1. Specification
1.1. Add paragraph 1.1.1.14 (a) in Section 01 11 00 Summary of Work which states: “At Roof Areas B and C furnish and install mechanically fastened ¼” per foot tapered insulation on top of the flat insulation to achieve positive drainage to the existing gutters.”
1.2. Replace Section 01 22 13 Unit Prices and Allowances “Exhibit A” with the attached: (Unit Price No.4, Steel Deck
Replacement, Allowance was changed from N/A to 90 SF)
1.3. Replace paragraph 3.5.3 of Section 07 22 16 Roof Board Insulation in its entirety with the following: “Furnish and install ¼” per foot tapered polyisocyanurate insulation and associated fill units as needed to install a loose laid tapered insulation system over the new flat insulation.”
No other drawings or sections of the specifications have been modified as a result of this addendum and all other drawings and sections of the specification shall remain in full force and effect.
Attachments to Addendum: Pre-Bid Meeting Minutes
Pre-bid Meeting Sign-in Sheet
Section 01 11 00 Summary of Work Add 1
Section 01 22 13 Unit Prices and Allowance Exhibit A Add 1 http://www.raymondllc.com/
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| CMS Roofing project | — | |
| Prebid minutes | — | |
| allowance 01 | — | |
| sign in sheet | — | |
| section 01 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .