Addendum 4_LI-BL-2023-001_D006332, D006645-47.pdf
PDF 4 MB Posted
- Solicitation number
- 2138584
- Issued by
- Suffolk County, New York
About this file
This Addendum 4 document, issued by the New York State Office of Parks, Recreation and Historic Preservation (OPRHP), provides clarifications and modifications to bid documents for the Phase 2 Renovation of the Regional Administration Building at Belmont Lake State Park in West Babylon, New York. The addendum addresses Requests for Information (RFIs) submitted by Preferred Construction Inc. and EJ Electric Installation Co., as well as revisions to construction drawings. Key clarifications include confirmation that the 18" W x 21" D trench drain dimensions are correct (not the 12" W x 12" D shown in Detail 9/C-601); Door 115 is existing and to remain with frame preparation and painting per specifications, with wall demolition not occurring in this area; plywood underlayment is required for new LVT/RSF on the first floor with leveling per manufacturer requirements; wood repairs may be required where existing flooring is present; flooring will not be installed in herringbone or diagonal patterns; 10% attic stock must be provided for LVT/RSF and rubber cove base; project duration remains 420 days regardless of alternate selections; and sheet vinyl has been replaced with LVT flooring throughout. The addendum includes revised sheets AD-111, A-111, and C-600 as attachments and supersedes conflicting information in original bid documents. All bidders must acknowledge receipt of this addendum by inserting its number and date in the bid form or face potential disqualification.
The addendum also clarifies that New York State agencies are exempt from paying New York State sales tax, and contractors should complete and submit Form ST-120.1 (Contractor Exempt Purchase Certificate) to retailers once the contract is awarded to receive tax exemption on applicable purchases for construction, improvement, maintenance, service, or repair of real property. No specific pricing information, set-asides, or funding requirements are detailed in this addendum document, as it serves solely as a clarification and modification instrument to the original bid documents and RFI responses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPRHP-Pre-Bid Addendum Version 1, 8/28/2026 Page 1 of 2
ADDENDUM
PROJECT: Renovation of Regional Administration Building Phase 2 – Exterior/Electrical Infrastructure
Upgrades – LI-BL-2023-001
Belmont Lake State Park
General Construction Contract D006632
Mechanical Contract D006646
Electrical Contract D006645
Plumbing Contract D006647
ADDENDUM NO: 4
ISSUE DATE: 10/09/2026
ALL BIDDERS SUBMITTING A BID FOR THE ABOVE-NAMED PROJECT SHALL TAKE NOTE OF THE FOLLOWING CHANGES, ADDITIONS, INTERPRETATIONS, CLARIFICATIONS, ETC. IN CONNECTION WITH THE DRAWINGS AND SPECIFICATIONS
AND OTHER BID DOCUMENTS. THE FOLLOWING INSTRUCTIONS HAVE PRECEDENCE OVER ANYTHING CONTRARILY
SHOWN ON THE DRAWINGS OR DESCRIBED IN THE SPECIFICATION DOCUMENTS, AND ALL SUCH INFORMATION SHALL
BE TAKEN INTO CONSIDERATION AND BE INCLUDED IN THE BIDDERS BID AMOUNT. ACKNOWLEDGE RECEIPT OF THIS
ADDENDUM BY INSERTING ITS NUMBER AND DATE IN THE SPACE PROVIDED IN THE BID FORM. FAILURE TO DO SO
MAY SUBJECT BIDDER TO DISQUALIFICATION.
SUMMARY OF ADDENDUM ITEMS
RFIs: Responses to RFI questions from Preferred, and EJ Electric
• See attached RFI forms
Sheet AD-111: Clarified door 115 graphics to show it is existing to remain.
Sheet A-111: Clarified door 115 graphics to show it is existing to remain.
Sheet C-600: Revised trench drain sizing in note on detail 9.
List of Attachments:
A. LI-BL-2023-001 GC-D006632 - Preferred.pdf
B. LI-BL-2023-001 E-D006645 - EJ.pdf
C. Sheet AD-111
D. Sheet A-111
E. Sheet C-600
06/2025 OPR 103
NYS Office of Parks, Recreation and Historic Preservation Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
4 9.30.26 Refer to dwg. C101
An 18" W x 21" D trench drain is called;
however, Detail 9/C601 indicates a 12" W x 12" D trench drain.
Please clarify which trench drain dimensions are to be used
ADDENDUM 4
18" W x 21" D is the correct dimension. Detail 9 on sheet C-601 will be updated in Addendum 4.
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
5 9.30.26 Refer to dwg. AD111 and A701
Refer to dwg. AD111 In Room 115, the demolition legend indicates that the wall is to be removed.
However, Drawing A701 (Door Schedule) indicates an existing door and frame, with a door size provided.
Additionally, Detail 21/A400 on Drawing A400 states, “Prepare, prime and paint existing door frame to remain.”
Please clarify whether the door and frame is to be replaced or not. If replaced then provide type of door.
ADDENDUM 4
Door 115 is existing to remain. Frame to be prepared and painted per elevation on 21/A-400. AD-111 and A-111 graphics have been revised to clarify the door is existing, and wall demolition will not occur in this area as the door is existing.
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
7 10.05.26
1) Section #096500-4 para 3.4D. Plywood; Is plywood required for new LVT / RSF on the 1st floor for this bid scope ? Section #090160-2 para 2.1 Wood Materials Repair - Please confirm no wood repairs is required for this bid scope. Is the 1st Floor subfloor Wood or Concrete ? All new LVT / RSF on the 1st floor to get self level underlayment for this bid scope ? Thickness of self level underlayment for this bid scope ?
RWD refinish wood scope. No Staining, No Repairs; please confirm for this bid scope ? Transition Strip or Saddle for Room 113 to Corridor is which detail on Drawing A-702 ? Corridor 118 new LVT / RSF to existing corridor; Transition Strip or Saddle will be same as at Door 114A, please advise. No diagonal LVT / RSF flooring layout required for this bid scope, please confirm.No herringbone LVT / RSF flooring layout required for this bid scope, please confirm ?No Attic Stock Required for LVT / RSF or RBM Rubber Cove base for this bid scope, please confirm ? If Alternates 1 or 2 are not accepted, will the project still require 420 days to complete ?Drawing A-110, Landing at top of steps to Double Door; Please confirm no new flooring or wall base for this bid scope. Addendum #3 RFI on page 3 of 6 Answer: 6. Please confirm answer is void, no more sheet vinyl in this bid scope, please confirm.
Division 09 : Flooring Questions
ADDENDUM 4
1. Section #096500-4 para 3.4D. Plywood; Is plywood required for new LVT / RSF on the 1st floor for this bid scope?
2. Section #090160-2 para 2.1 Wood Materials Repair - Please confirm no wood repairs is required for this bid scope. Is the 1st Floor subfloor Wood or Concrete?
3. All new LVT / RSF on the 1st floor to get self level underlayment for this bid scope? Thickness of self level underlayment for this bid scope?
1. Provide minimum 1/4-inch-thick APA-rated plywood underlayment specifically intended for resilient flooring and acceptable to LVT manufacturer. Do not install LVT directly over wood planks. Underlayment shall not substitute for required subfloor repairs.
2. Wood repairs may be required where existing flooring is present. Refinishing is required per finish schedule and specifications. 1st floor is a wood sub floor.
3. Leveling required per manufacturers substrate and installation requirements and specifications.
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
7 10.05.26
1) Section #096500-4 para 3.4D. Plywood; Is plywood required for new LVT / RSF on the 1st floor for this bid scope ? Section #090160-2 para 2.1 Wood Materials Repair - Please confirm no wood repairs is required for this bid scope. Is the 1st Floor subfloor Wood or Concrete ? All new LVT / RSF on the 1st floor to get self level underlayment for this bid scope ? Thickness of self level underlayment for this bid scope ?
RWD refinish wood scope. No Staining, No Repairs; please confirm for this bid scope ? Transition Strip or Saddle for Room 113 to Corridor is which detail on Drawing A-702 ? Corridor 118 new LVT / RSF to existing corridor; Transition Strip or Saddle will be same as at Door 114A, please advise. No diagonal LVT / RSF flooring layout required for this bid scope, please confirm.No herringbone LVT / RSF flooring layout required for this bid scope, please confirm ?No Attic Stock Required for LVT / RSF or RBM Rubber Cove base for this bid scope, please confirm ? If Alternates 1 or 2 are not accepted, will the project still require 420 days to complete ?Drawing A-110, Landing at top of steps to Double Door; Please confirm no new flooring or wall base for this bid scope. Addendum #3 RFI on page 3 of 6 Answer: 6. Please confirm answer is void, no more sheet vinyl in this bid scope, please confirm.
Division 09 : Flooring Questions
ADDENDUM 4
4. RWD refinish wood scope. No Staining, No Repairs; please confirm for this bid scope?
5. Transition Strip or Saddle for Room 113 to Corridor is which detail on Drawing A-702?
6. Corridor 118 new LVT / RSF to existing corridor; Transition Strip or Saddle will be same as at Door 114A, please advise.
4. See specifications section 090160 for staining and repair requirements, and response #2 above.
5. Detail 17/A-702 applies to new to existing linoleum/vinyl transitions.
6. Detail 17/A-702 applies to new to existing linoleum/vinyl transitions.
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
7 10.05.26
1) Section #096500-4 para 3.4D. Plywood; Is plywood required for new LVT / RSF on the 1st floor for this bid scope ? Section #090160-2 para 2.1 Wood Materials Repair - Please confirm no wood repairs is required for this bid scope. Is the 1st Floor subfloor Wood or Concrete ? All new LVT / RSF on the 1st floor to get self level underlayment for this bid scope ? Thickness of self level underlayment for this bid scope ?
RWD refinish wood scope. No Staining, No Repairs; please confirm for this bid scope ? Transition Strip or Saddle for Room 113 to Corridor is which detail on Drawing A-702 ? Corridor 118 new LVT / RSF to existing corridor; Transition Strip or Saddle will be same as at Door 114A, please advise. No diagonal LVT / RSF flooring layout required for this bid scope, please confirm.No herringbone LVT / RSF flooring layout required for this bid scope, please confirm ?No Attic Stock Required for LVT / RSF or RBM Rubber Cove base for this bid scope, please confirm ? If Alternates 1 or 2 are not accepted, will the project still require 420 days to complete ?Drawing A-110, Landing at top of steps to Double Door; Please confirm no new flooring or wall base for this bid scope. Addendum #3 RFI on page 3 of 6 Answer: 6. Please confirm answer is void, no more sheet vinyl in this bid scope, please confirm.
Division 09 : Flooring Questions
ADDENDUM 4
7. No diagonal LVT /RSF flooring layout required for this bid scope, please confirm. No herringbone LVT / RSF flooring layout required for this bid scope, please confirm?
8. No Attic Stock Required for LVT / RSF or RBM Rubber Cove base for this bid scope, please confirm?
9. If Alternates 1 or 2 are not accepted, will the project still require 420 days to complete?
7. Flooring will not be installed in a herringbone or in a diagonal pattern.
8. Provide 10% attic stock.
9. Durations remain unchanged with or without the selection of alternates
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
D006632, D006645-47 Preferred Construction Inc estimating@prefconst.com
7 10.05.26
1) Section #096500-4 para 3.4D. Plywood; Is plywood required for new LVT / RSF on the 1st floor for this bid scope ? Section #090160-2 para 2.1 Wood Materials Repair - Please confirm no wood repairs is required for this bid scope. Is the 1st Floor subfloor Wood or Concrete ? All new LVT / RSF on the 1st floor to get self level underlayment for this bid scope ? Thickness of self level underlayment for this bid scope ?
RWD refinish wood scope. No Staining, No Repairs; please confirm for this bid scope ? Transition Strip or Saddle for Room 113 to Corridor is which detail on Drawing A-702 ? Corridor 118 new LVT / RSF to existing corridor; Transition Strip or Saddle will be same as at Door 114A, please advise. No diagonal LVT / RSF flooring layout required for this bid scope, please confirm.No herringbone LVT / RSF flooring layout required for this bid scope, please confirm ?No Attic Stock Required for LVT / RSF or RBM Rubber Cove base for this bid scope, please confirm ? If Alternates 1 or 2 are not accepted, will the project still require 420 days to complete ?Drawing A-110, Landing at top of steps to Double Door; Please confirm no new flooring or wall base for this bid scope. Addendum #3 RFI on page 3 of 6 Answer: 6. Please confirm answer is void, no more sheet vinyl in this bid scope, please confirm.
Division 09 : Flooring Questions
ADDENDUM 4
10. Drawing A-110, Landing at top of steps to Double Door; Please confirm no new flooring or wall base for this bid scope.
11. Addendum #3 RFI on page 3 of 6 Answer: 6. Please confirm answer is void, no more sheet vinyl in this bid scope, please confirm.
10. Painted steel stringer occupies space of wall base at stairs. Landing to be concrete to match stair construction.
11. Sheet vinyl has been replaced with LVT flooring. The wood base molding response and the integral cove as part of the epoxy flooring system responses are still applicable. Full previous response is not void.
Long Island Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: LI-BL-2023-001 Renovate Regional Administration Building Exterior/Electrical Infrastructure Upgrades (Phase 2) Contract Number:
Date:
Drawing No:
Request From:
Reply Email Address:
Email Request to: LIEngineeringContracts@parks.ny.gov Request Number:
Spec Section No.:
Remarks:
Question:
Answer:
ADDENDUM 4
DN
POLICE
POLICE
POLICE
POLICE
POLICE
BACKUP
ROOM
POLICE
COMMUNICATIONS
114A
ARREST
ROOM
POLICE
FOYER
114B
POLICE
WING
WOMENS
119A
MENS
ROOM
POLICE
ALTERNATE 1 ALTERNATE 2
REMOVE EXISTING PARTITION WALL,
DOOR, AND TRIM. REMOVE BASE
MOULDING AT BASE OF WALL (TYP.)
REMOVE EXISTING BUILT IN DESK
REMOVE EXISTING DOOR AND
FRAME (TYP.)
COORDINATE REMOVAL AND
TEMPORARY STORAGE OF POLICE
LIFE-SCAN EQUIPMENT AND
FURNITURE. EQUIPMENT AND
FURNITURE TO BE PROTECTED AND
REINSTALLED
REMOVE EXISTING UTILITY SINK
AND CAP PLUMBING. REFER TO
PLUMBING DRAWINGS FOR
ADDITIONAL INFORMATION
(CONTRACT P)
REMOVE EXISTING
CABINETRY
REMOVE EXISTING PANELED WALL
FINISH AT FULL ROOM
REMOVE EXISTING PANELED WALL
FINISH AT FULL ROOM
REMOVE AND STORE EXISTING
FURNITURE IN AREAS OF WORK
THROUGHOUT THE DURATION OF
CONSTRUCTION, REINSTALL
FOLLOWING COMPLETION OF WORK
AS DIRECTED BY OWNER (TYP.)
REMOVE EXISTING
SINK (CONTRACT P)
REMOVE EXISTING FLOORING
DOWN TO SUBFLOOR AT FULL
ALTERNATE 1 AREA.
IN ALTERNATE 2 AREAS REMOVE
EXISTING FLOORING DOWN TO
SUBFLOOR WHERE INDICATED ON
FINISH SCHEDULE ON A-701
CONTRACT NOTES:
1. ALL WORK ON THIS DRAWING IS CONTRACT GC, UNLESS
OTHERWISE NOTED AS CONTRACT M, CONTRACT E OR
CONTRACT P.
H :\ 2954_ N YSP - Term- D005883\ 2954.02- AdminB ldgExterior\ 2954.02_ D rawings
123456789
A
B
D
E
F
G
H
C
Description Date
SUBMISSIONS / REVISIONS
No.
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
Seal and Signature
BELMONT LAKE STATE PARK
RENOVATION OF REGIONAL ADMINISTRATION
BUILDING PHASE 2 - EXTERIOR/ELECTRICAL
INFRASTRUCTURE UPGRADES
BELMONT LAKE STATE PARK
WEST BABYLON
NEW YORK, 11704
LONG ISLAND DISTRICT
625 BELMONT AVENUE
WEST BABYLON, NY 11704
LONG ISLAND CAPITAL DISTRICT MANAGER
VESNA HADZIBABIC, PE, LEED AP BD+C
CONSULTANTS:
ARCHITECT
BEYER BLINDER BELLE ARCHITECTS & PLANNERS
120 BROADWAY, 20TH FLOOR, NEW YORK, NY 10271
STRUCTURAL ENGINEER
THORNTON TOMASETTI
120 BROADWAY, NEW YORK, NY 10271
CIVIL ENGINEER
CHA CONSULTING, INC.
3 WINNERS CIRCLE, ALBANY, NY 12205-0269
EXECUTIVE DEPUTY COMMISSIONER
DEPUTY COMMISSIONER, CAPITAL PROJECTS
TOM ALWORTH
BEVIN COLLINS, RA, LEED AP
LI-BL-2023-001 OF XX
MEP ENGINEER
LORING CONSULTING ENGINEERS, INC.
5 VAUGHN DRIVE, SUITE 307, PRINCETON NJ 08540
LIGHTING CONSULTANT
LUMEN ARCHITECTURE, LLC
108 E 16TH STREET, #602, NEW YORK, NY 10003
123456789
LONG ISLAND REGIONAL DIRECTOR
GEORGE GORMAN, JR.
CONTRACT #:
D# 006632 (GENERAL CONSTRUCTION)
T# 006647 (PLUMBING)
Bid Set 6/26/2026
KEY PLAN:
AD-111
JG
NA
AM
AM
06/26/26
DEMO 1ST FLOOR ENLARGED PLAN -
POLICE WING ALTERNATES 1 & 2
1/4" = 1'-0"AD-111
1 DEMO 1ST FLOOR ENLARGED PLAN - POLICE WING ALTERNATE 1 & 2
Addendum 3 10/01/2026
Addendum 4 10/09/2026
DN
POLICE
POLICE
POLICE
111POLICE
POLICE
BACKUP
ROOM
ARREST
ROOM
POLICE
FOYER
114B
POLICE
WING
WOMENS
119A
MENS
ROOM
POLICE
114A
112A
115A
114B.1
114B.2
BULLET RESISTANT
BACKGLAZING AT
BOTTOM SASH ONE-WAY
MIRROR (TYP.)
KITCHENETTE. REFER TO
INTERIOR ELEVATIONS
FOR ADDITIONAL
INFORMATION
PARTITION WITH ABUSE
RESISTANT GYPSUM BOARD AT
HOLDING CELL SIDE
FIXED BENCH AND PROTECTIVE
WALL PAD PROVIDED BY
OWNER, INSTALLED BY GC
BUILT IN COUNTERTOP
SUPPORTED ON WOOD
FRAMING
EVIDENCE STORAGE
LOCKERS
BULLET RESISTANT
WINDOW, SEE A-610
BUILT IN COUNTERTOP
WITH COUNTER BRACKETS
ALTERNATE 1 ALTERNATE 2
POLICE
WINDOW
4'
+/- 8' - 5 1/2"
5'
A4A
6' - 8"
3'
3' - 1"
STORAGE
CLOSET
112A
A-4
A-4
HOLDING
CELL
115A A-4
A-4
A-4
A-4
A4A-A
P4A
P4A A6A-A
A4A-A
A-4
111.3
INFILL WALL AT FORMER DOOR
LOCATION. REMOVE AND SALVAGE
EXISTING DOOR MOULDING.
INSTALL BASE MOULDING TO
MATCH EXISTING (TYP)
INFILL WALL AT FORMER DOOR
LOCATION. REMOVE EXISTING
DOOR MOULDING. INSTALL BASE
MOULDING TO MATCH EXISTING
A3A
EX
EX
EX
2'
COUNTER TO BE 2' - 6"
DEEP FROM FACE OF
WINDOW TRIM. SCRIBE
COUNTER TO FIT TIGHT
AGAINST EXISTING
WINDOW TRIM AND
BULLET RESISTANT
BACKGLAZING ADJACENT
TO WINDOWS, COUNTER
TO EXTEND FULL DEPTH
TO WALL (TYP.)
EQ
EQ
STORAGE
CLOSET
111B
A-551
LIFESCAN PROVIDED
BY PARKS, SHOWN
FOR REFERENCE
ONLY
N.I.C.
9'
/2
V
.I.
F.
A-551
A-551
EXISTING SHAFT
1'
1' - 6"
EX
EX
A4A
W.O.
CORR.
2' - 0"
REINSTALL FURNITURE
REMOVED AND STORED
DURING DEMOLITION
PHASE (TYP)
REINSTALL STORED FURNITURE
AND NEW FURNITURE AS
DIRECTED BY OWNER
FOLLOWING COMPLETION OF
WORK (TYP.)
REFRIGERATOR
KITCHENETTE SINK
(CONTRACT P)
1' - 0"
4' - 0"
GUN STORAGE CABINET
114B.3
A4A
POLICE
COMMUNICATIONS
114A
ARMORY
114C
4' - 7"
1' - 3"
1'
17' - 1"
FLUSH MOUNTED GUN
STORAGE LOCKER
LIMIT OF NEW FLOORING
INSTALLATION, TYP
EXISTING FLOORING AT
CORRIDOR TO REMAIN
WOMENS
TOILET
(W.T.)
W.T.
135A
W.T.
135B
CUST.
CLOSET
ENGINEERING
ENGINEERING
MENS
TOILET
CORRIDOR
147 REPLACE SINK IN KIND. REFER TO PLUMBING
DRAWINGS FOR SINK SPECIFICATIONS
(CONTRACT P)
PROPOSED METAL SHELVING BY OWNER,
TO BE INSTALLED BY THE PRIME
CONTRACTOR FOR GENERAL
CONSTRUCTION
EXISTING CART BY OWNER. COORDINATE
SHELVING TO ACCOMMODATE SPACE FOR CART
INFILL FLOOR OPENING AT LOCATION OF
REMOVED CHASE WALLS AT BASEMENT
AND 1ST FLOORS. PATCH PLASTER
WALLS AT FORMER WALL LOCATIONS,
FULL HEIGHT. REFER TO STRUCTURAL
DRAWINGS
EPOXY RESIN FLOORING
PROPOSED METAL SHELVING BY OWNER,
TO BE INSTALLED BY THE PRIME
CONTRACTOR FOR GENERAL
CONSTRUCTION
ALTERNATE 3
CONTRACT NOTES:
1. ALL WORK ON THIS DRAWING IS CONTRACT GC, UNLESS
OTHERWISE NOTED AS CONTRACT M, CONTRACT E OR
CONTRACT P.
1/4" = 1'-0"A-111
1 1ST FLOOR ENLARGED PLAN - POLICE WING ALTERNATE 1 & 2
H :\ 2954_ N YSP - Term- D005883\ 2954.02- AdminB ldgExterior\ 2954.02_ D rawings
123456789
A
B
D
E
F
G
H
C
Description Date
SUBMISSIONS / REVISIONS
No.
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
Seal and Signature
BELMONT LAKE STATE PARK
RENOVATION OF REGIONAL ADMINISTRATION
BUILDING PHASE 2 - EXTERIOR/ELECTRICAL
INFRASTRUCTURE UPGRADES
BELMONT LAKE STATE PARK
WEST BABYLON
NEW YORK, 11704
LONG ISLAND DISTRICT
625 BELMONT AVENUE
WEST BABYLON, NY 11704
LONG ISLAND CAPITAL DISTRICT MANAGER
VESNA HADZIBABIC, PE, LEED AP BD+C
CONSULTANTS:
ARCHITECT
BEYER BLINDER BELLE ARCHITECTS & PLANNERS
120 BROADWAY, 20TH FLOOR, NEW YORK, NY 10271
STRUCTURAL ENGINEER
THORNTON TOMASETTI
120 BROADWAY, NEW YORK, NY 10271
CIVIL ENGINEER
CHA CONSULTING, INC.
3 WINNERS CIRCLE, ALBANY, NY 12205-0269
EXECUTIVE DEPUTY COMMISSIONER
DEPUTY COMMISSIONER, CAPITAL PROJECTS
TOM ALWORTH
BEVIN COLLINS, RA, LEED AP
LI-BL-2023-001 OF XX
MEP ENGINEER
LORING CONSULTING ENGINEERS, INC.
5 VAUGHN DRIVE, SUITE 307, PRINCETON NJ 08540
LIGHTING CONSULTANT
LUMEN ARCHITECTURE, LLC
108 E 16TH STREET, #602, NEW YORK, NY 10003
123456789
LONG ISLAND REGIONAL DIRECTOR
GEORGE GORMAN, JR.
CONTRACT #:
D# 006632 (GENERAL CONSTRUCTION)
T# 006647 (PLUMBING)
Bid Set 6/26/2026
KEY PLAN:
A-111
JG
NA
AM
AM
06/26/26
1ST FLOOR ENLARGED PLANS
1/4" = 1'-0"A-111
2 1ST FLOOR ENLARGED PLAN - CUSTODIAN CLOSET ALTERNATE 3
118 CORRIDOR FLUSH MOUNTED GUN
CABINETY
SPACESAVER EDHGS04V 13" 26 1/8" 6 1/2" SELECTED FROM MANUFACTURERS 32 STANDARD COLORS
115 ARREST ROOM PROTECTIVE WALL PAD RESILITE MAT
COMPANY
KWIK-STIK 72" 48" 1" FROM MANUFACTURERS STANDARD COLORS. INCLUDE OPTION FOR CUSTOM LOGO PROVIDED BY OWNER
115 ARREST ROOM PRISONER RESTRAINT
BENCH
GLOBAL
INDUSTRIES
PB6-NB-STD
SOLID-STEEL-B
LACK
72" 19" 14" POWER COATED BLACK STEEL FINISH
115 ARREST ROOM EVIDENCE STORAGE
LOCKER
SPACESAVER 08(N) 36" 82" 24" 8-OPENING NON-PASS-THROUGH. SELECTED FROM MANUFACTURERS 32 STANDARD COLORS
115 ARREST ROOM EVIDENCE STORAGE
LOCKER
SPACESAVER 01(N) 36" 82" 24" 4-OPENING NON-PASS-THROUGH. SELECTED FROM MANUFACTURERS 32 STANDARD COLORS
114C ARMORY GUN STORAGE LOCKER STORE MORE
STORE SMS-01-V128-0
50-13488-AL
34" 74" 12.75" 13-COMPARTMENT HANDGUN AND LONG GUN CABINET, WITH INDIVIDUAL LOCKING COMPARTMENTS AND A
MASTER DOOR.. SELECTED FROM MANUFACTURERS STANDARD COLORS
FIRST FLOOR (ALTERNATE #1)
ROOM # ROOM NAME ITEM MANUFACTURER MODEL # WIDTH HEIGHT DEPTH NOTES
LOCATION
REGIONAL ADMINISTRATION BUILDING - FURNISHING AND FIXTURE SCHEDULE
113 POLICE BACKUP ROOM SINK ELKAY LK1410 N/A N/A N/A REFER TO PLUMBING DRAWINGS FOR PLUMBING FIXTURE SCHEDULE (CONTRACT P)
113 POLICE BACKUP ROOM SINK ELKAY
ELUHAD211545
23 1/2" 18 1/4" 4 3/8" REFER TO PLUMBING DRAWINGS FOR PLUMBING FIXTURE SCHEDULE (CONTRACT P)
112A STORAGE CLOSET SHELVING NOT SPECIFIED NOT
SPECIFIED
6' - 8" VARIES 1' - 6" REFER TO CLOSET ELEVATIONS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
111B STORAGE CLOSET SHELVING NOT SPECIFIED NOT
SPECIFIED
9' - 9 1/2" VARIES 1' - 6" REFER TO CLOSET ELEVATIONS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
FIRST FLOOR (ALTERNATE #2)
ROOM # ROOM NAME ITEM MANUFACTURER MODEL # WIDTH HEIGHT DEPTH NOTES
LOCATION
REGIONAL ADMINISTRATION BUILDING - FURNISHING AND FIXTURE SCHEDULE
136 CUST. CLOSET UTILITY SINK REFER TO PLUMBING DRAWINGS FOR PLUMBING FIXTURE SCHEDULE (CONTRACT P)
FIRST FLOOR (ALTERNATE #3)
ROOM # ROOM NAME ITEM MANUFACTURER MODEL # WIDTH HEIGHT DEPTH NOTES
LOCATION
REGIONAL ADMINISTRATION BUILDING - FURNISHING AND FIXTURE SCHEDULE
NOTE: ANY PRODUCT MEETING OR EXCEEDING THE CRITERIA OR THE SPECIFIED PRODUCTS MAY BE USED.
NOTE: ANY PRODUCT MEETING OR EXCEEDING THE CRITERIA OR THE SPECIFIED PRODUCTS MAY BE USED.
NOTE: ANY PRODUCT MEETING OR EXCEEDING THE CRITERIA OR THE SPECIFIED PRODUCTS MAY BE USED.
SUBMITTALS:
1.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL DATA AND
INSTALLATION INSTRUCTIONS FOR EACH TYPE OF SIGN REQUIRED.
2. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS FOR FABRICATION AND
ERECTION OF SIGNS. INCLUDE PLANS, ELEVATIONS, AND LARGE-SCALE
DETAILS OF SIGN WORDING AND LETTERING LAYOUT. SHOW ANCHORAGE
AND ACCESSORY ITEMS. FURNISH LOCATION TEMPLATE DRAWINGS FOR
ITEMS SUPPORTED OR ANCHORED TO PERMANENT CONSTRUCTION.
3. SAMPLES: SUBMIT SAMPLES OF EACH SIGN SHOWING FINISHES, COLORS,
SURFACE TEXTURES AND QUALITIES OF MANUFACTURE AND DESIGN OF EACH
SIGN COMPONENT, INCLUDING GRAPHICS.
1. INTERIOR PANEL SIGNS: PROVIDE 1/4-INCH-THICK ACRYLIC SIGN PANEL,
PROVIDE TEST AS INDICATED ON DRAWINGS. SMOOTH SIGN PANEL SURFACES
CONSTRUCTED TO REMAIN FLAT UNDER INSTALLED CONDITIONS WITHIN A
TOLERANCE OF PLUS OR MINUS 1/16 INCH MEASURED DIAGONALLY FROM
CORNER TO CORNER, MANUFACTURED FROM MANUFACTURER'S STANDARD
ACRYLIC SHEET, UNFRAMED. COMPLY WITH REQUIREMENTS INDICATED FOR
FINISHES, COLORS, DESIGNS, SHAPES, SIZES, AND DETAILS OF
CONSTRUCTION (AS SELECTED BY THE ARCHITECT).
2. ENGRAVED COPY: MACHINE ENGRAVE LETTERS, NUMBERS, SYMBOLS, AND
OTHER GRAPHIC DEVICES INTO PANEL SIGN ON FACE INDICATED TO PRODUCE
PRECISELY FORMED COPY, INCISED TO UNIFORM DEPTH. FILL ENGRAVED
COPY WITH ENAMEL.
3. TACTILE CHARACTERS: CHARACTERS AND GRADE 2 BRAILLE RAISED 1/32
INCH ABOVE SURFACES, IN CONTRASTING COLOR.
4. INSTALL UNITS AND COMPONENTS AT THE LOCATIONS DIRECTED BY THE
ARCHITECT, SECURELY MOUNTED WITH CONCEALED THEFT-RESISTANT
FASTENERS. ATTACH TO SUBSTRATES IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS.
5. INSTALL LEVEL, PLUMB, AND AT THE PROPER HEIGHT. COOPERATE WITH
OTHER TRADES FOR INSTALLATION OF SIGN UNITS TO FINISH SURFACES.
REPAIR OR REPLACE DAMAGED UNITS AS DIRECTED BY THE ARCHITECT.
SPECIFICATIONS NOTES:
114B POLICE FOYER DOOR 114B.2 MAX 18" MAX 18"
118 CORRIDOR DOOR 115 MAX 18" MAX 18"
FIRST FLOOR (ALTERNATE 1)
ROOM # ROOM NAME LOCATION WIDTH HEIGHT
LOCATION FINISH AND PREPARATION
REGIONAL ADMINISTRATION BUILDING - SIGNAGE SCHEDULE
Addendum 3 10/01/2026
Addendum 4 10/09/2026
123456789
A
B
D
E
F
G
H
C
SUBMISSIONS / REVISIONS
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet Title:
Drawing Number:
Seal and Signature
123456789
Project Title:
Project Location:
BELMONT LAKE STATE PARK
RENOVATION OF REGIONAL ADMINISTRATION
BUILDING PHASE 2 - EXTERIOR/ELECTRICAL
INFRASTRUCTURE UPGRADES
BELMONT LAKE STATE PARK
WEST BABYLON
NEW YORK, 11704
CONTRACT #:
D# 006632 (GENERAL CONSTRUCTION)
D# 006645 (ELECTRICAL)
KATHY HOCHUL KATHY MOSER
LONG ISLAND DISTRICT
625 BELMONT AVENUE
WEST BABYLON, NY 11704
LONG ISLAND CAPITAL DISTRICT MANAGER
VESNA HADZIBABIC, PE, LEED AP BD+C
CONSULTANTS:
ARCHITECT
BEYER BLINDER BELLE ARCHITECTS & PLANNERS
STRUCTURAL ENGINEER
THORNTON TOMASETTI
CIVIL ENGINEER
CHA CONSULTING, INC.
EXECUTIVE DEPUTY COMMISSIONER
DEPUTY COMMISSIONER, CAPITAL PROJECTS
TOM ALWORTH
BEVIN COLLINS, RA, LEED AP
MEP ENGINEER
LORING CONSULTING ENGINEERS, INC.
LIGHTING CONSULTANT
LUMEN ARCHITECTURE, LLC
LONG ISLAND REGIONAL DIRECTOR
GEORGE GORMAN, JR.
KEY PLAN:
C-600
SB
SB
JJE
JJE
10/09/26
| Question: Please advise on the tax status of this project. |
| Answer: New York State (NYS) agencies are exempt from paying NYS sales tax. Contractors working for NYS Office of Parks, Recreation and Historic Preservation (OPRHP) that make purchases to construct a building, structure, improve real property or to maintain, service, or repair a building, structure, or real property, should complete and provide the Form ST-120.1 to retailers to receive tax exemption once the contract is awarded. |
The Contractor Exempt Purchase Certificate ST-120.1 can be found at the Department of Taxation and Finance website: https://www.tax.ny.gov/pdf/current_forms/st/st120_1_fill_in.pdf. The form itself further explains what purchases are applicable to receive tax exemption.
| Contract Number: D006645 |
| Request From:: E-J Electric Installation, Co. |
| Reply Email Address: kulmschneider1@ej1899.com |
| Request Number: 1 |
| Spec Section Number: |
| Remarks: Tax Status |
| Date3_af_date: 10/2/2026 |
| Drawing Number: |
File details come from the government source that posted it. Updated .