This is Addendum #3 to the bidding documents for the 2020 Improvement Projects in Adrian, Michigan, issued by the Lenawee Intermediate School District (LISD) on March 26, 2020, with engineering services provided by Dailey Engineering Inc. The addendum clarifies and modifies the original bidding documents issued March 23, 2020, and becomes an integral part of the project specifications. The projects involve improvements to the LISD Trenton Hills Learning Center and include electrical relocation work, flooring installation totaling 1,361 square feet across two areas, cabinet and countertop modifications with specific finishes (Wilsonart laminate and Karndean design flooring), vinyl base installation, and comprehensive network infrastructure upgrades. Network improvements require the installation of 126 total data drops: 52 new drops at TECH East Building and 74 new drops at Trenton Hills Learning Center, with no changes to TECH Main Building network closets.

The addendum specifies detailed technical requirements for network cabling and equipment, mandating Category 6 plenum-rated UTP and STP wiring throughout with strict installation standards including 6-foot bundling intervals, firewall sealing with Fire Stop red caulk, and EIA/TIA 568B compliance. Network equipment specifications include three Cisco 2960X 48-port switches with corresponding stack kits and cables, three Belkin 48-port Cat6 patch panels, and 126 1-foot blue non-booted Cat6 patch cords. All electrical outlets and raceways affected by cabinet and countertop installations must be relocated or modified to maintain usability in the new configuration, with outlets and raceways raised several inches above countertops. Cable certification testing must be performed using a Fluke DTX1800 tester, with comprehensive labeling requirements for all wiring components. Contractors must include in their bid amounts any cost changes resulting from this addendum.

View the file

Other files

File Type Posted
Addendum #1 LISD Improvement Project.pdf PDF
LISD Ad for Bid Trenton-TECH Center.pdf PDF
Specification Booklet.pdf PDF
Addendum #2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #3 – 2020 Improvement Projects A3.1 March 26, 2020

ADDENDUM #3

Project: 2020 Improvement Projects Adrian, Michigan

Engineer: Dailey Engineering Inc.

8485 Stephenson Rd.

Onsted, Michigan 49265

This addendum provides clarification and information regarding the Bidding Documents issued March 23, 2020 for the 2020 Improvement Projects, Adrian, Michigan, and hereby become a part of the Bidding Documents for the Project.

Each Contractor shall review this information and follow the instructions for any and all changes, and shall include in his Bid Amount any changes in cost due to this Addendum.

TECHNICAL ITEMS:

1) Wherever electrical outlets and/or raceway are present and will be affected by new cabinets/countertop, it is the intent to relocate/modify the outlets/raceway to be useable in the new configuration as it was prior to modifications. In most cases the electrical elements will need to be raised several inches. Drawing A1.2 Rev. 1 has been revised to show locations and is attached as Page A3.02 of this addendum.

2) The network equipment and cable specifications are attached as Page A3.3-A3.5 of this addendum.

LISD TRENTON HILLS LEARNING CENTER

FLOOR PLAN

A1.2

LENAWEE INTERMEDIATE SCHOOL DISTRICT

1008 W. MAPLE AVE.

ADRIAN, MICHIGAN 49221

DAILEY ENGINEERING, INC.

DAILEY ENGINEERING INC.

AutoCAD SHX Text

TA DAILEY

AutoCAD SHX Text

M. FOWLER

AutoCAD SHX Text 03/26/2020

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

REV.:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APP'D. BY:

AutoCAD SHX Text

CHK'D. BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text %%uQUIET

AutoCAD SHX Text

%%UAREA

AutoCAD SHX Text

PH. # (517) 467-9000

AutoCAD SHX Text

ONSTED, MI 49265

AutoCAD SHX Text

8485 STEPHENSON ROAD

AutoCAD SHX Text EMAIL - todddailey@me.com

AutoCAD SHX Text #210A

AutoCAD SHX Text

FLOOR PLAN

AutoCAD SHX Text

SCALE: Ê"=1'-0"

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

MONTESSORI

AutoCAD SHX Text

AutoCAD SHX Text

MONTESSORI

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

UNISEX

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text 180F

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

MONTESSORI

AutoCAD SHX Text

AutoCAD SHX Text

MONTESSORI

AutoCAD SHX Text

AutoCAD SHX Text

PRE-SCHOOL

AutoCAD SHX Text

COMMUNITY

AutoCAD SHX Text 10B

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 10A

AutoCAD SHX Text W.R.

AutoCAD SHX Text

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

AutoCAD SHX Text

MEN

AutoCAD SHX Text 180D

AutoCAD SHX Text

AutoCAD SHX Text 180E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

R. ZONE

AutoCAD SHX Text 180C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

6-8 GRADERS

AutoCAD SHX Text

AutoCAD SHX Text

8-10 GRADERS

AutoCAD SHX Text

AutoCAD SHX Text

10-12 GRADERS

AutoCAD SHX Text

AutoCAD SHX Text

COMMONS

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 180B

AutoCAD SHX Text 180A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

R. ZONE

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text A7

AutoCAD SHX Text

AutoCAD SHX Text

GIRL'S

AutoCAD SHX Text

AutoCAD SHX Text

BOY'S

AutoCAD SHX Text 160A

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text

AutoCAD SHX Text

NEW FLOORING IN THIS ROOM

AutoCAD SHX Text

(SHADED AREA = 1,148 SQ. FT.)

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

EXISTING ITEMS / CONSTRUCTION

AutoCAD SHX Text

NEW ITEMS / CONSTRUCTION

AutoCAD SHX Text

SEE ENLARGED PLAN

AutoCAD SHX Text

ON DRAWING A2

AutoCAD SHX Text

NEW FLOORING IN THIS ROOM

AutoCAD SHX Text

(SHADED AREA = 213 SQ. FT.)

AutoCAD SHX Text

%%UFINISHES:

AutoCAD SHX Text

VINYL BASE =

AutoCAD SHX Text

JOHNSONITE (TRADITIONAL WALL BASE)

AutoCAD SHX Text

COUNTERTOP =

AutoCAD SHX Text

WILSONART - PREMIUM LAMINATE

AutoCAD SHX Text

COLOR #84 - BLUE JEANS

AutoCAD SHX Text

COLOR - PHANTOM PEARL B211K-28

AutoCAD SHX Text

GLOSS LINE FINISH

AutoCAD SHX Text

CABINETS =

AutoCAD SHX Text

WILSONART - STANDARD LAMINATE

AutoCAD SHX Text

COLOR - ATLANTIS D25-60

AutoCAD SHX Text

FLOORING =

AutoCAD SHX Text

KARNDEAN - DESIGN FLOORING

AutoCAD SHX Text

COLORADO - LLT201

AutoCAD SHX Text (24"x19.625")

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

RACEWAY ABOVE

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

RACEWAY ABOVE

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

OUTLET ABOVE

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

RACEWAY ABOVE

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

RACEWAY ABOVE

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

RELOCATE EXIST.

AutoCAD SHX Text

DATA CONNECTION

AutoCAD SHX Text

RAISE EXISTING

AutoCAD SHX Text

OUTLET ABOVE

AutoCAD SHX Text

NEW COUNTERTOP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Network Specifications

Cabling Cabling and connections must be consistent with exiting data cabling and terminations.

The UTP and STP wiring, jacks, patch cables, and patch panels shall be Category 6 plenum rated throughout the entire installation (NO Substitutions allowed without documented written approval).

All cables being run for horizontal distribution within the plenum areas must be bundled together with cable ties every 6 feet, and supported by cable trays, and/or structures attached directly to the building structure/upper decking in the plenum areas or crawl spaces. Where cable trays and conduit is not provided, wiring shall be attached and supported to upper decking by way of J-hooks or bent steel rods installed between decking grooves, or comparable support devices, attached directly to the existing building structure decking or like framework. Wiring will not be supported by ceilings, ceiling hangers, or to existing electrical, plumbing, or air ventilation structures or to existing conduit.

No single Cat6 run shall exceed 100 meters.

Use provided sleeves for all firewall and/or floor interconnects. Seal all wall penetrations with Fire Stop red caulk (MetaCaulk 1000) or other pre-approved fire stop installation.

Wiring must be routed so that it does not interfere with access to panels, switches, valves or other maintenance systems.

The punch down jacks and punch down patch panel cross connects shall be designed so installer will always punch down the cable pairs according to EIA/TIA 568B specifications.

TWISTED PAIRS MUST REMAIN TWISTED TO WITHIN 1/4" OF CONNECTOR. This is required for high-speed data networks.

Wiring will not be installed near fluorescent lighting, high-voltage sources, electrical motors, or other sources of interference. Recommended distances for UTP cabling shall be at least 1 ft. for florescent lighting (unshielded), and 3 ft. for transformers or motors (unshielded). If STP cabling is required, vendor must request in writing to owner.

Splices within cable runs are not acceptable because it may compromise the integrity of the wiring for high-speed data transmission.

Contractors must adhere to manufacturers’ requirements for bending radius and pulling tensions for all cable runs.

All conduits must have bushings at the end of the conduit to prevent cable jacket tears. Where cable is being run from one conduit to another, the cable vendor must insure that twists do not occur during the cable installations as this can cause kinking and tangling of the cabling within the cable run.

After installation is complete, any debris resulting from cable installation must be removed, with the area left as clean as before the installation started.

Raceway The Contractor shall furnish and install; white, metal raceway, wiremold brand cable pathways, Addendum #3 - 2020 Improvement Projects

A3.3 mechanically affixed .

Patch Panel/Cables The Contractor shall furnish and install 48 port patch panels. All cables labeled on the back of each patch panel. Use one 1 foot Cat6 non-booted patch cables, blue in color in the racks in each MFD or IDF rooms.

The wiring components shall consist of jacks, faceplates, wire and all accessories required to properly install the wiring and devices.

Cable Certification Tests and Labeling UTP cable certification must be performed with a Fluke DTX1800 tester. Tests results shall be identified by the corresponding labeled Cable ID and must include wire map, resistance, length, propagation delay, impedance, return loss, attenuation, and cross-talk.

UTP wiring will be labeled on both ends of the outlet, 3 inches back from punch down panel, and 3 inches back from the face plate punch down. Labels for all UTP wiring shall be white, self laminating, adhesive labels.

EXAMPLE: RACK-SHELF-PORT 00-C-27

Cable contractor identification tags shall be attached above conduit stub-up, and at each end of every UTP installation.

Network Equipment:

TECH Main Building

We are only relocating drops so no change in the network closets.

TECH East Building:

Adding new 52 network drops.

Item Qty Part

Switch 1 2960X-48FPS-L

Stack Kit 1 C2960X-STACK

Stack Cable 1 CAB-STK-E-0.5M

Patch Panel 1 Belkin 48 Port Cat6 (unloaded)

Patch Cords 52 1ft Blue non-boot Cat6

Addendum #3 - 2020 Improvement Projects

A3.4

Trenton Hills Learning Center (THLC)

Adding 74 new drops.

Item Qty Part

Switch 2 2960X-48FPS-L

Stack Kit 2 C2960X-STACK

Stack Cable 1 CAB-STK-E-0.5M

Stack Cable 1 CAB-STK-E-3M

Patch Panel 2 Belkin 48 Port Cat6 (unloaded)

Patch Cords 74 1ft Blue non-boot Cat6

In total for TECH Main, TECH East and THLC:

Item Qty Part Description

Switch 3 2960X-48FPS-L Cisco 2960X 48 port switch, 740 W PoE

Stack Kit 3 C2960X-STACK Cisco Stack kit to connect to the other switches

Stack Cable 2 CAB-STK-E-0.5M Cable to connect the switches

Stack Cable 1 CAB-STK-E-3M Cable to connect top and bottom switch at THLC

Patch Panel 3 Belkin 48 Port Cat6 Unloaded, to be used with keystones

Patch Cords 126 1ft Blue non-boot Cat6 High quality and grade patch cords