Addendum No. 2 for the Town of Lyons Wastewater Treatment Facility Upgrades Project (Project Number: 25-WASTEWATER-01) provides details for a design engineering consultant procurement. The document outlines project upgrades including dewatering system replacement, increased blower capacity, modernized UV system, non-potable water capacity expansion, and odor control system repairs. Proposals are due Wednesday, July 16, 2025, by 2:00 P.M. at Town Hall, with a pre-RFP meeting held on June 12, 2025. The package must include one original submittal and one PDF copy on an external flash drive. Project questions were to be submitted by 4:00 P.M. on Thursday, June 26, 2025, with answers posted by 4:00 P.M. on Friday, June 27, 2024.

The addendum includes a comprehensive Q&A section addressing various technical and procedural aspects of the project. Key points include no defined design budget, anticipated Buy America (BABA) funding requirements for construction, and a preference for design-bid-build project delivery. The town's wastewater plant operating contractor will serve as the commissioning agent. The project involves specific technical considerations such as UV treated non-potable water usage, gravity flow into the plant, and potential testing for the dewatering system. Construction staging areas will be available at the plant, recycle center, and trail parking lot. The town will rely on the 2024 Wastewater Treatment Facility Master Plan for cost estimates.

View the file

Other files for this state and local contract opportunity

Other files attached to Wastewater Treatment Facility Upgrades - Design RFP, newest first.
File Type Posted
2013 PRELIMINARY ENGINEERING REPORT.pdf PDF
25-WASTEWATER-01_RFP 05302025.pdf PDF
ADDENDUM 3, 25-WASTEWATER-01.pdf PDF
Wastewater Treatment Facility Master Plan by JVA Oct 2024.pdf PDF
2018 SITE LOCATION APPLICATION.pdf PDF
2686.9c - PDR Submission to CPDHE 2020.04.24.pdf PDF
ADDENDUM 1, 25-WASTEWATER-01.pdf PDF
Lyons Influent BOD Data 2025.xlsx XLSX spreadsheet
2011 WASTEWATER FEASIBILITY STUDY.pdf PDF
General Permit Certification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

TO THE CONTRACT DOCUMENTS FOR

TOWN OF LYONS

WASTEWATER TREATMENT FACILITY UPGRADES PROJECT

TOWN PROJECT NUMBER: 25-WASTEWATER-01

THIS ADDENDUM IS HERBY MADE A PART OF THE CONTRACT DOCUMENTS TO

THE SAME EXTENT AS THOUGH IT WERE ORIGINALLY INCLUDED THEREIN.

BIDDERS MUST ACKNOWLEDGE RECEIPT OF ALL ADDENDA. BIDS THAT FAIL TO

ACKNOWLEDGE ALL ADDENDA MAY BE CONSIDERED IRREGULAR AND MAY BE

REJECTED.

ISSUED: 06/23/2025

ITEM NO. 1

Sign-in sheet and agenda from pre-proposal meeting attached.

ITEM NO. 2

Questions and answers from the pre-proposal meeting below.

Q1. Is there a page limit for the RFP?

A1: No

Q2. What is budget for design?

A2: No defined budget

Q3. Do anticipate BABA, Buy America funding requirements for construction

A3: Yes, at this time

Q4. Bypassing and shutdown plans required for the design

A4: Yes

Q5. Is the Town procuring commission agent?

A5: Besides the commissioning activities listed in the Scope of Work of the RFP, the Town’s wastewater plant operating contractor will act as the commissioning agent

Q6. For Construction Management scope, why is there a clause that it can be removed.

A6: In case construction is not funded or the Town feels a different consultant would be in the Town’s best interests.

Q7. Should design include support for bid phase?

A7: Town will bid the construction but likely need help from consultant for questions and supporting documentation.

Q8. Preference for project delivery?

A8: Design, bid, build

Q9. Dewatering system replacement, do we plan to do piloting?

A9: It is highly recommended that the consultant either do lab/bench-scale testing or onsite side-stream testing as part of their dewatering system selection design.

Q10. Format on proposal document, is 11x17 ok?

A10: Yes

Q11. If a contractor is on design team, can the contractor bid construction (integration and controls, specifically)?

A11: A contractor can be part of the design team as a subconsultant but contractor must separate themselves from the consultant Team after design is completed and prior to any bidding activities and construction. Consultant should explain in their proposal how they would accommodate this and avoid any conflicts of interest, including the construction management scope of work.

Q12. Do Town have a preferred integrator for SCADA?

A12: No

Q13. Does the scope include upgrading or changing the existing switch for backup power? Ask because scope specifically mentions switchgear.

A13: No, not included in the scope. That language is generic to try capturing all necessary electric components needed for upgrades.

Q14. Everything is using potable water even if labeled non-potable?

A14: Yes

Q15. Can splitter modification be a pumped system?

A15: Potentially, if there is good reasoning for it.

Q16. Does the Town prefer raw non-potable water versus UV treated non-potable water for plant use.

A16: UV treated non-potable is preferred and required anywhere it could become in contact with operators. Raw non-potable can be used for enclosed processes.

Q17. Gravity flow to plant?

A17: Yes, gravity flow into the plant. There are four lift stations throughout Town.

Q18. Construction staging area available?

A18: Yes, at the plant, recycle center, and trail parking lot.

Q19. Construction estimate available?

A19: Town has used the cost in the 2024 Wastewater Treatment Facility Master Plan that was included in Addendum #1 for estimates to date.

Q20. Can you explain the proposed plan for modifying the wet-well capacity?

A20: The Town does not currently have a proposed design or concept and will be relying on the consultant for guidance.

Q21. Has the Town changed the Odor Control Media?

A21: No.

Q22. Is the odor control microbiologic or chemical?

A22: Believed to be microbiologic.

Acknowledge Receipt of Addendum #2

PRINT OR TYPE YOUR INFORMATION AND INCLUDE ANY AND ALL

ADDENDUMS.

Name of Company:

Authorized Representative’s Signature: Date:

Printed Name: Title:

TOWN OF LYONS

WASTEWATER TREATMENT FACILITY UPGRADES PROJECT

TOWN OF LYONS PROJECT NUMBER: 25-WASTEWATER-01

PRE-RFP MEETING AGENDA

JUNE 12, 2025 11:00 A.M.

PROJECT TEAM

Justin Doles – Town Engineer and Project Manager Aaron Caplan – Engineering, Building & Utilities Director

OVERVIEW

The Town of Lyons is seeking to procure an engineering consultant to provide permitting, design and analysis, and construction administration and management for the proposed WWTP upgrades as described in the RFP. In general, these upgrades include:

• Dewatering system replacement

• Increased blower capacity

• Modernized UV system and increased non-potable water capacity

• Replace use of potable water with non-potable water to the bio-scrubber, headworks spray system, and dewatering press

• Improved flow split structure

• Necessary odor control system repairs/upgrades

• Rerouting centrate return line realignment so that the centrate reenters the facility downstream of the influent flow meter

• Smaller WAS pumps in SBR basins

• Increase volume of wet well and add odor control for wetwell

WWTF site visit after this meeting. Address: 198 2nd Ave, Lyons, CO 80540

CONTRACT AND BIDDING DOCUMENTS

1. Proposals are due Wednesday July 16, 2025, and need to be submitted to Town Hall at 432 5th Avenue, Lyons, CO prior to 2:00 P.M. (our clock).

2. Package must include one (1) original submittal, identified as “Original”, one (1) copy of submittal in PDF format on an external flash drive.

3. Project questions will be cut off at 4:00 P.M. Thursday June 26, 2025. Answers will be posted by 4:00 PM Friday June 27, 2024.

QUESTIONS

ADDENDUM 2, 25-WASTEWATER-01
Prebid Signin
WWTP Upgrades - Plan Pre-RFP Agenda
PRE-RFP MEETING AGENDA

File details come from the government source that posted it. Updated .