Wastewater Treatment Facility Upgrades - Design RFP

Solicitation # 25WASTEWATER01
Posted 5/30/25, 2:00 AM
No Updates
Due 7/16/25, 6:00 PM
Source
No public source available
Similar Opportunities
The City of Longmont, located in Boulder County, Colorado, is seeking a qualified contractor for the Nelson-Flanders Water Treatment Facility Forebay Repairs project (RFP-425026), which involves comprehensive rehabilitation of a jurisdictional dam. The project requires extensive earthwork, utility work, and dam embankment reconstruction, including perimeter drain installation, sediment removal, riprap replacement, and road and access improvements. Minimum qualifications mandate that...
The Town of Wellington, located in Larimer County, Colorado, is seeking proposals from qualified engineering and design firms for a Water Treatment Plant Administration and Laboratory Building Design Alternatives project. The procurement involves planning, conceptual design, and preliminary engineering for a new administration and laboratory building that meets Colorado Department of Public Health and Environment (CDPHE) drinking water regulations. The project requires firms to develop three...
The state of Colorado is seeking contractors for a comprehensive 3-year Wastewater Infrastructure Program Support contract, with proposals due by August 19, 2025. This procurement opportunity involves multiple potential contract awards for supporting infrastructure improvement projects across city-owned facilities and rights-of-way. Specific work activities include sanitary and storm sewer infrastructure replacement, cured-in-place pipe lining, environmental site investigations, utility...
The City of Fort Collins is seeking construction services for the NPT Blower Replacement Project at the Drake Water Reclamation Facility (DWRF), issuing Request for Proposal (RFP) 10193 for qualified contractors. The project requires comprehensive services including equipment procurement, design phase services, and construction for replacing two 350 HP Turbo Blowers, along with associated blow-off valve replacement, air flow metering, piping, electrical, instrumentation, and control...
The City of Glenwood Springs is seeking a professional engineering firm to design a comprehensive water and sewer line reroute project through a Request for Proposal (RFP) 2025-28P. The project involves relocating the main sewer line from 6th Street to a new alignment along West 1st Street and adjacent to the I-70 right of way, with specific infrastructure upgrades including upsizing water pipes from 12" to 16" C900 and replacing existing 8" DIP lines. Deliverables will include...

The Town of Lyons, Colorado, located in Boulder County, is seeking a consultant through a Request for Proposals (RFP) to design comprehensive upgrades for its Wastewater Treatment Facility (WWTF). The project, identified as 25-WASTEWATER-01, requires a qualified engineering consultant to prepare detailed design drawings, specifications, cost estimates, permitting documents, and construction administration for multiple facility improvements. Specific upgrade requirements include sludge dewatering system replacements, blower system modifications, UV system modernization, non-potable water piping design, flow split structure improvements, odor control system repairs, and centrate return line realignment. Proposals are due on July 16, 2025, by 2:00 PM, with a pre-proposal conference and site visit scheduled for June 12, 2025, at 11:00 AM. The project evaluation will focus on company qualifications, recent project experience, approach to scope of work, project control, and proposed fees, with an anticipated project timeline from August 1, 2025, to December 31, 2026.

No specific set-aside designations or restrictions on respondent types were explicitly mentioned in the documentation. The project will potentially be funded through various sources, including the Water Pollution Control Revolving Fund (WPCRF) and may involve Buy America (BABA) funding requirements for construction. While no incumbent vendors were identified, the town's current wastewater plant operating contractor will serve as the commissioning agent. The 2024 Wastewater Treatment Facility Master Plan estimated total improvement costs at approximately $18.5 million, with potential funding sources including Bipartisan Infrastructure Law funds, State Revolving Fund low-interest loans, USDA Rural Development grants, and Department of Local Affairs grants. The facility currently serves a population of 2,145 and is projected to grow to 2,702 by the end of the planning period, with the selected consultant expected to design upgrades that can accommodate future growth and meet evolving environmental regulations.

Generated 7/17/25, 3:44 PM