This is Addendum 1 to an Invitation for Bid (IFB) issued by the Town of Holliston, Massachusetts for the Wastewater Treatment Plant Concrete Tank Installation as part of the Holliston Wastewater System Upgrades Phase 1A project, dated July 1, 2026. The project involves the installation of three wastewater treatment tanks (1st Stage RMF Effluent Tank, 1st Stage Denitrification Tank, and 2nd Stage RMF Effluent Tank, each with capacities of 3,000 to 6,000 gallons) and a force main system. The bid form includes five line items: Mobilization, Demobilization & Site Restoration; the three tank installations; and Force Main installation, all quoted as lump sum prices. Contractors are not required to bid on all items, and the Owner reserves the right to select different contractors for combined bid items. Work must be completed within two weeks of contract authorization for tank items and four weeks for mobilization and force main items.
The addendum makes two key modifications to the original IFB: it reduces a specified quantity from 18 to 7 units on page 7, Section 9, and it adds general requirements regarding completion schedule compliance and bidding options flexibility. Contractors must acknowledge receipt of Addendum 1 and confirm their understanding that Items 2.1, 2.2, and 2.3 (tank installations) have a two-week completion deadline while Items 1 and 3 (mobilization and force main) have a four-week deadline from contract authorization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB - Holliston WWTP_Tank Installation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID - HOLLISTON WASTEWATER SYSTEM UPGRADES – PHASE 1A
Addendum # 1, Issued: 07/01/2026
The Invita�on for Bids (IFB) -Wastewater Treatment Plant Concrete Tank Installa�on dated July 1, 2026 and Holliston Linden St. Wastewater System Upgrades Phase 1A - Project Specifica�ons, 3-6,000 Gallon Tanks & Force Main Specifica�ons dated June 30, 2026 are hereby amended as follows:
IFB
Page 7, Sec�on 9, 1st bullet, delete “18” and insert “7”
1. Page 2, Insert into General Requirements:
“16. Comple�on Schedule Compliance with the schedule as presented in the Specifica�ons is required.
17. Bidding Op�ons
Contractors are not required to bid all Items on the Bid Tab. Owner reserves the right to select different Contractors for combined Bid Items 2.1 through 2.3 and combined Bid Items 1 and 3.”
Specifica�ons
1. Delete Bid Form and insert updated Bid Form pasted below.
END OF ADDENDUM # 1
Item Description Qty. Unit Total Price
Mobilize, Demobilize & Site Restore
1 LS
2.1 1st Stage RMF Effluent Tank 1 LS
2.2 1st Stage DeniteTank 1 LS
2.3 2nd Stage RMF Effluent Tank 1 LS
3 Force Main 1 LS
Grand Total Bid (in numbers)
Total BID (in words):
Contractor's Printed Name & Signature Date
HOLLISTON WASTEWATER SYSTEM UPGRADES - PHASE 1 A - BID FORM
By submitting a Bid Contractor acknowledges that Items 2.1, 2.2 and 2.3 must be completed within two (2) weeks of contract authorization and that Items 1.0 and 3 work must be completed within four (4) weeks of contract authorization
Contractor acknowledges receipt of Addendum # 1