This is Addendum 1 to the Request for Qualifications and Request for Proposal (RFQ/RFP ZEA-039-040826) issued by the City of Torrington, Connecticut, for the Zeller Assessment Project. The City seeks an environmental consultant team to conduct comprehensive assessments of three combined parcels located at 52 Norwood Street, Torrington, Connecticut. The scope of work encompasses Phase II and Phase III environmental site assessments, a hazardous building materials (HBM) assessment, development of a remedial action plan (RAP), a building structural analysis and renovation feasibility study, and public meeting attendance. Key tasks include soil and groundwater investigation, evaluation of ADA accessibility and building systems, recommendations for historic property designation eligibility, and assessment of potential off-site contamination. The original RFQ/RFP was issued on March 4, 2026, with a question submission deadline of March 23, 2026, at 12:00 PM EDT and a bid opening scheduled for April 8, 2026, at 11:00 AM at City Hall, Room 206, 140 Main Street, Torrington, Connecticut. A site walk was conducted on March 19, 2026. All assessment deliverables must be completed within one year following contract execution.
This addendum addresses 37 questions submitted by prospective bidders regarding technical scope clarifications, submission requirements, site conditions, and regulatory compliance obligations. Pricing shall be submitted on an hourly rate sheet and expense schedule that remains in effect for the project duration; Connecticut DAS bill rates are not required. The City of Torrington is using grant funding of $200,000 from the Connecticut Department of Economic and Community Development (DECD) dedicated entirely to environmental consulting and building feasibility study activities. Respondents must demonstrate the ability to meet the proposed project timeline and include a detailed schedule for completing each task. The City reserves the right to accept or reject any or all bids and to award the contract based on the bid that best serves the public interest rather than the lowest price. Minority-Owned Businesses (MBEs), Women-Owned Businesses (WBEs), and Small Businesses (SBEs) are encouraged to apply. Inquiries should be directed to Pennie Zucco, Purchasing Agent, at 860-489-2225 or pennie_zucco@torringtonct.org.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Torrington
REQUEST FOR QUALIFICATIONS (RFQ) & PROPOSALS (RFP)
ZELLER ASSESSMENT PROJECT
52 Norwood Street
Torrington, CT
RFQ/RFP ZEA-039-040826
REQUEST FOR QUALIFICTIONS ADDENDUM
RFQ ID RFQ/RFP ZEA-039-040826
RFQ Title: Zeller Assessment Project RFQ Issue Date: March 4, 2026 Addendum # 1 Addendum Issue Date March 23, 2026
Bid opening: April 8, 2026 Time: 11:00 A.M. Location: City Hall, Room 206, 140 Main St., Torrington, CT
Must Submit signed addenda with bid.
The City of Torrington reserves the right to accept or reject any or all bids or any portion thereof, to waive technicalities, and to award the contract as will best serve the public interest.
Purchasing Agent___________________________ Pennie Zucco
Contact Name_________________________________ Phone:________________________ Authorized Representative: _______________________________________________________ Authorized Signature: ___________________________________________________________ Company Name: _______________________________________________________________ Address: ______________________________________________________________________ City, State, Zip: ________________________________________________________________ Fax: ___________________________ Email: ________________________________________ Federal Tax Identification Number (FEIN): __________________________________________
The Brunswick Site Environmental Assessment Project RFQ/RFP (RFQ/RFP ZEA-039-040826) received the following questions and is hereby amended with the following responses:
Questions received in response to RFQ/RFP ZEA-039-040826:
1. QUESTION: Per the proposal requirements, firms must provide Attachment 3 – Acceptance of Terms of this Agreement. Can the City please provide a copy of the terms and conditions to review?
o ANSWER: The terms are contained within the RFQ/RFP itself. By submitting a bid response that includes a signed copy of Attachment 3: Acceptance of Terms of Agreement, the bidder acknowledges understanding all requirements in the
ZELLER ASSESSMENT PROJECT
52 Norwood Street
RFQ/RFP, including those in Attachment 3. There are no additional terms or conditions to provide for this RFQ/RFP.
2. QUESTION: Per the scope of work, Task 5: Building Structural Analysis and Renovation Feasibility Study. Item 1 references a “building structural analysis”. Please confirm this is intended to be a “structural evaluation” not an analysis of the lateral and/or gravity forces on the structure that would require calculations.
o ANSWER: Task 5 is to evaluate the building structure to determine suggestions for building stabilization and any improvements needed to repurpose the building for residential use.
3. QUESTION: Per the scope of work, Task 5: Building Structural Analysis and Renovation Feasibility Study. Item 2C – Please confirm if this item refers to ADA accessibility. If not, please clarify this task.
o ANSWER: Yes, ADA accessibility is one component that would be a requirement of Item 2C. Additional considerations for Item 2C could include the evaluation of fire and smoke monitoring and suppression, sewer & water connections, etc.
4. QUESTION: Per the scope of work, Task 5: Building Structural Analysis and Renovation
Feasibility Study. Item 2E – The eligibility of historic designation would not be determined by the structural consultant.
o ANSWER: The City of Torrington is not requesting a structural consultant to make a determination on eligibility for historic designation as part of this project. The City is seeking a qualified consultant to provide a recommendation on eligibility for historic property designation and, if eligible, to recommend potential funding sources and the necessary steps to achieve historic designation.
5. QUESTION: Per the proposal submission requirements, Envelope A is to contain the original Qualification Package, original Cost Proposal, and the thumb drive containing the entire bid package. Envelope B is to contain the Cost Proposal. Could you please confirm where the required “Exact Copy” of the Qualification Package and Cost Proposal should be placed? Should the copy be included in Envelope A, Envelope B, or submitted separately?
o ANSWER: Envelope A must contain one (1) original and one (1) exact copy of the Qualification Package. Refer to Page 13 – ATTACHMENT 1: Proposal Checklist.
6. QUESTION: Per the Envelope A requirements, firms are asked to provide “Demonstrated ability to meet the Proposed Project Timeline.” The Proposal Checklist references a “Proposed schedule and project timeline,” and the Evaluation Criteria indicates that firms will be evaluated on a proposed schedule. Please confirm whether Envelope A should
ZELLER ASSESSMENT PROJECT
52 Norwood Street include a proposed project schedule, a narrative explanation of our ability to meet the timeline, or both.
o ANSWER: The project narrative should contain a proposed timeline for completing the project and should demonstrate the respondent’s ability to complete the project within the proposed timeline. Per the RFQ/RFP, the project is expected to kick off immediately after the consultant is chosen and the project is awarded.
Proposed Project Timelines should indicate the timeframe for completing each Task as described in the Scope of Work.
7. QUESTION: Is there a concrete subfloor, and if so, how thick?
o ANSWER: Yes, the building has a concrete subfloor. The thickness of the concrete is unknown.
8. QUESTION: Is there a basement or crawlspace?
o ANSWER: Yes, the south end of the building does have a basement area. There is no crawlspace.
9. QUESTION: Is there a plan to demolish the building?
o ANSWER: There is no plan to demolish the building.
10. QUESTION: Was there a fire in the building?
o ANSWER: Unknown
11. QUESTION: Can the City please send a list of attendees from the sitewalk on 3/19?
o ANSWER: Yes.
12. QUESTION: Is Task 1 and/or Task 2 to include any off-site investigation, or is the intent of the work scope to just identify if off-site investigation is needed?
o ANSWER: Bid responses should anticipate the possibility of off-site investigation, and if deemed appropriate by the respondent, should be included in the response.
The final determination for off-site investigation will be made by project requirements and in coordination with the City, Property Owner, and any off-site property owners with potential impacts.
13. QUESTION: If off-site investigation is requested, should the RAP, Task 3, include off-site parcels?
o ANSWER: Any off-site investigation requirements will be determined as part of the assessment project.
ZELLER ASSESSMENT PROJECT
52 Norwood Street
14. QUESTION: Who will coordinate legal access to off-site parcels if this is requested?
o ANSWER: The City of Torrington will not provide guidance on pricing.
15. QUESTION: If Task 2 (Phase III) is to build upon Task 1 (Phase II), how should the consultant price out the Phase III without the Phase II findings?
o ANSWER: The city and the consultant will coordinate access agreements if necessary. The consultant will have to provide an estimate based on certain assumptions with the provided environmental documentation.
16. QUESTION: Was the awarded CTDEED grant $200,000 for all three parcels, or was funding provided for the individual parcels, which could exceed $200,000 total?
o ANSWER: The DECD Grant was for the entire assessment project.
17. QUESTION: Is an updated Phase I requested to support the CSM process, due to the fact that the last Phase I was done in 2009 (under a previous ASTM standard)?
o ANSWER: Consultants may recommend an updated Phase I ESA as part of this project.
18. QUESTION: Will development plans be available to support the RAP development, or should the RAP be considered "Conceptual"?
o ANSWER: The goal of this project is that the Phase II & Phase III ESAs will guide decision-making for the reuse options of the property. There is no development plan as of publishing the RFQ/RFP.
19. QUESTION: Will development plans include the footprint of the current building structures without any additional proposed structural development on the currently undeveloped parcels?
o ANSWER: The consultant should assume that the development plan will include the footprint of the building.
20. QUESTION: Please confirm if no PCB HBM material sampling is to be conducted.
o ANSWER: Respondents should provide a plan for PCB sampling as part of the bid response.
21. QUESTION: Will a licensed roofing contractor be required to repair areas of the roof affected by the HBM assessment, or will localized repairs by the consultant be acceptable?
Or will the owner make the repairs?
ZELLER ASSESSMENT PROJECT
52 Norwood Street o ANSWER: The consultant shall plan to take care of all roof repairs with either a subcontracted licensed roofing contractor or with other roof repair plans that are acceptable to the property owner.
22. QUESTION: For Task 6, how many "Public Meetings" should be included in the proposed budgets?
o ANSWER: Public meeting attendance will be at the request of the city.
Respondents should plan to attend at least 1 public meeting.
23. QUESTION: The Task 2 descriptions on the cost proposal Form (RFP page 24), Phase III ESA describes three parcels; however, the Task 2 description (page 8) indicates that the Phase III is for the " Manufacturing Parcel and North Parcel". Please confirm whether Phase III investigation activities are to be conducted on two or three parcels?
o ANSWER: Refer to the map on the cover page that clearly indicates the three parcels associated with this project. Parcels A, B, & C are the only areas covered under this assessment project.
24. QUESTION: Is the City retaining any administrative fees from the grant, or will the entire grant be used for environmental consulting?
o ANSWER: The grant funding is entirely dedicated to the environmental consulting and building feasibility study activities.
25. QUESTION: As part of the Task 4 Hazardous Building Materials Assessment, an inspection/sampling of the roofing materials on the buildings would typically be included.
Could you please clarify whether the City requires that any roof cuts and patching be performed by a Licensed Roofing Contractor, or if it is acceptable for the Consultant to perform these activities directly?
o ANSWER: The consultant shall plan to take care of all roof repairs with either a
26. QUESTION: We note that roof cuts and patching performed by the Consultant may void any existing roof warranties. Please advise on the City’s preference and any applicable requirements.
o ANSWER: The consultant shall plan to take care of all roof repairs with either a
ZELLER ASSESSMENT PROJECT
52 Norwood Street
27. QUESTION: The RBCRs include mandatory reporting requirements for Emergent Reportable Releases, Significant Existing Releases (SERs), and other historical releases subject to tiered reporting timelines (e.g., 24-hour, 72-hour, 120-day, and 365-day deadlines). Please clarify whether the consultant should include, within the scope and fee for Tasks 1–3, the evaluation of RBCR reporting triggers and the preparation/submittal of any required release notifications to CT DEEP, or whether the City intends to handle regulatory reporting directly.
o ANSWER: Respondents should include in the proposal a plan to comply with any required release notifications as a result of the RBCR.
28. QUESTION: The RFP requires all assessment deliverables to be completed within a one-year period following contract execution. Under the RBCRs, historical releases that are not remediated within certain timeframes, particularly the 120-day and 365-day deadlines, must be reported and may subsequently enter the RBCR tiering system. Please clarify whether the City anticipates initiating remediation within RBCR reporting timeframes, or whether consultants should assume that releases identified during Phase II/III may become subject to RBCR tier assignment while the City pursues funding, design, and procurement for subsequent remediation work. Because RBCR tier assignment may trigger additional regulatory oversight requirements, including potential Licensed Environmental Professional (LEP) certification, reporting, and compliance tracking, should consultants include potential LEP compliance costs associated with RBCR tiering in their pricing, or will the City address these costs under a future phase?
o ANSWER: Respondents should include in the proposal all cost estimates and recommendations for the city and property owner to make informed decisions to meet reporting requirements and remediation timeline requirements under the
RBCR.
29. QUESTION: Are CT DAS bill rates required?
o ANSWER: No. Refer to P. 5 of the RFQ/RFP: Envelope B must contain an Hourly Rate Sheet and Expense Schedule that will remain in effect for the duration of the project.
30. QUESTION: Would the City consider a proposal that includes minor comments or requested clarifications to certain contractual terms and conditions? If so, is there an opportunity for the City to review and provide feedback on these items prior to submission?
o ANSWER: No. The city will accept comments and clarifications as part of the full bid response package, but will not evaluate or respond to any other comments or clarifications beyond those submitted prior to the questions due date. The city
ZELLER ASSESSMENT PROJECT
52 Norwood Street will conduct interviews with qualified applicants and will entertain minor comments and requested clarifications during those interviews.
31. QUESTION: For HBM work, are sampling practices that may require minor disturbance to select building features (e.g., walls, roofs) allowable, or would any disturbance need to be repaired upon completion?
o ANSWER: The consultant shall plan to take care of all repairs and disturbances with either a licensed subcontractor or internal services provided by the consultant firm.
32. QUESTION: For HBM work involving roof areas, would a licensed roofing contractor be required to perform any necessary repairs following sampling or assessment activities?
o ANSWER: The consultant shall plan to take care of all roof repairs with either a
33. QUESTION: It appears that blueprints and/or as-built drawings may be available. Can these documents be provided for review?
o ANSWER: If available, Blueprints and/or as-builts will be provided to the selected consultant.
34. QUESTION: Are there any existing building condition assessment reports available?
o ANSWER: There are no building condition assessment reports available for this project.
35. QUESTION: The “Resources” section of the RFP references several reports and associated documents. Can these materials be made available for review?
o ANSWER: The resources listed in the RFQ/RFP are all clickable links that can be downloaded at each respondent’s discretion for review.
36. QUESTION: Are the groundwater monitoring wells previously installed on-site still accessible and viable for use?
o ANSWER: The status of groundwater monitoring wells is unknown.
37. QUESTION: Is the interior of the building accessible for completion of soil borings?
o ANSWER: Yes. The hired consultant will have access to the building's interior for soil borings.