This Addendum #1 modifies the Request for Qualifications (RFQ) for roof replacement services at the Legislative Services Building (LSB) issued by the Colorado Department of Personnel & Administration's Capitol Complex Architects office. The project, identified as RFQ 2027-037M26, requires architectural and engineering (A/E) firms to design the replacement of the building's roof system, which includes the upper EPDM roof (originally installed 11 years prior), standing seam metal roofing on two towers, and clay tile roofing. The scope addresses active leaks currently present on the west and south sides of the building in the tiled portion and lower trim areas. A mandatory pre-bid conference and walk-through was held on July 14, 2026, with an attached sign-in list of attendees. The RFQ evaluation criteria allocates 100 total points across six categories: Project Team (20 points), Firm/Team Capabilities (20 points), Prior Experience (20 points), Project Approach (20 points), Equity, Diversity, and Inclusion (15 points), and Work Location (5 points). The submission must not exceed 10 pages and should not include pricing information, as the awarded A/E firm will enter into hourly rate negotiations with the State using State Form SC-5.1 Exhibit B.

The project is subject to the Colorado Buy Clean Act if the contractor's bid exceeds $500,000. Roof coring samples will be taken at locations to be determined with the awarded A/E firm, with the Owner responsible for all asbestos, lead paint, and hazardous materials testing prior to coring. The scope includes fall protection measures but excludes repairing failed mortar joints at the roof perimeter, stone member repairs, Denver Green Roof Initiative requirements, and clay tile reuse. Sub-consultants may be employed, though evaluation of team experience focuses on the vendor's internal team only.

View the file

Other files

File Type Posted
2027-037M26 Roof Replacement, LSB-RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Personnel & Administration- Capitol Complex Architects 1525 Sherman St Denver, CO 80205

June 23, 2026

ADDENDUM 1

Roof Replacement, LSB Project #: 2027-037M26

Addendum #1 This Addendum is issued before the responses are received for Request for Qualifications. This Addendum forms a part of the RFQ and modifies the original documents as noted below.

All requirements contained in the Bidding Documents shall apply to the Addendum. The work called for in this Addendum shall be the same as set for in the applicable portions of the Bidding Documents unless otherwise specified in the Addendum. All incidental work necessitated by this Addendum as required to properly complete the work, shall be included in the Bids even though not specifically stated in the Addendum.

July 14, 2026 - Pre-Bid Conference and Walk-Thru Notes:

• Mandatory Pre-Bid Meeting sign-in list (see attached – pdf)

State of Colorado – Office of the State Architect – Response to questions

1. Should proposals include a front cover? If so, will the cover count against the overall 10-page limit? Please refer to VIII, 2, a of the RFQ for format and page count.

2. Does this project expect to be applicable to the Colorado Buy Clean Act?

Buy Clean Colorado Act is applicable to any projects in which a contractor(s) bid is over $500,000.

https://osa.colorado.gov/energy-environment/buy-clean-colorado-act

3. Is hourly rate sheet needed to be provided with this submission? No.

RFQ should not include any pricing. Awarded A/E will enter into to negotiations with the State. An hourly rate sheet will be required to enter into State Contract per State Form SC-5.1 Exhibit B.

4. Will roof coring samples be taken, and if so- how many or where? Yes, roof coring samples will be taken. Final locations to be determined with the awarded A/E firm based on need. Owner will be responsible for any asbestos, lead paint, hazardous materials, etc. testing with a third-party agency prior to any roof coring samples.

5. Can you provide clarification regarding the evaluation criteria of “experience on projects as a team”, is this regarding to vendors internal team, or regarding external sub-contractor’s team (should sub-consultants be applicable)? Only vendors internal team is required for RFQ. The scoring matrix is as follows:

Total 100 Pts Eval 1 Eval 2 Eval 3 Project Team (20 pts) Firm/ Team Capabilities (20 pts) Prior Experience (20 pts) Project Approach (20 pts) Equity, Diversity, and Inclusion (15 pts) Work Location (5 pts)

6. Are there active leaks currently, and have there been attempts to repair them? the RFQ states active leaks. Yes, the DPA Structure shop is as follows: There are currently active leaks on the west and south sides all located within the tiled portion and lower trim area of the roof, the lower trim area fills up with water like a balloon when we get consistent rains.

7. Are there any existing reports on the roof? No, but DPA Structure shop reported the upper EPDM roof was replaced 11 years ago. Owner expects this portion to be within scope for design to be replaced at this point.

8. Is the standing seam metal roof, on the two towers, part of the scope? Yes

9. Are you all intending/requiring the reuse of the clay roofing tiles? No reuse of existing tiles.

10. There is observation of failed mortar joints between the stones at the perimeter edge of roof, will repairing those joints or stone members be included in the scope? No

11. Will the roof be required to meet the Denver Green Roof Initiative? No

12. Do you all intend on having fall protection as part of the scope? Yes

END OF ADDENDUM #1