Addendum___1_Radiator_Cover.docx.pdf
PDF 87 KB Posted
- Attached to
- Radiator Cover Project at various BPS Phase 4
- Solicitation number
- EV00017970
- Issued by
- Suffolk County, Massachusetts
About this file
This is an addendum to bid documents issued by Boston Public Schools Office of Facilities Management for the Radiator Cover Project at various Phase 4 school locations under IFB Event ID #EV00017970. Addendum No. #1, dated October 2, 2026, modifies the original bidding documents dated September 23, 2026, and must be acknowledged by all bidders on the bid form to avoid disqualification. The addendum provides critical clarifications and updates to the contract documents, including the addition of radiator width specifications for Bates School that were omitted from the original plans, covering ten radiators across multiple floors and rooms with widths ranging from 3 feet to 8 feet.
The addendum addresses five substantive questions and answers that clarify bidder requirements and project specifications. Key clarifications include: the DCAMM bidder certification requirement is for General Building Construction/Carpentry, not electrical work; the school will clear radiators of teacher and student items prior to installation; the unit price is calculated in linear feet rather than one-inch increments; and the unit price on the general bid form covers both fabrication and installation of the radiator covers. These clarifications ensure all bidders submit proposals based on consistent understanding of the project scope and requirements, with the updated specifications forming an integral part of the contract documents that all prospective bidders must acknowledge upon submission.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOSTON PUBLIC SCHOOLS
OFFICE OF FACILITIES MANAGEMENT
1216 Dorchester Avenue Dorchester, Massachusetts 02125
ADDENDUM NO. #1
Radiator Cover Project at various BPS Phase 4 Event ID #EV00017970
10/02/26
To: Prospective Bidders:
The attention of bidders submitting proposals for the above project is called to the following addendum to the Contract Bid Documents. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted.
THIS ADDENDUM FORMS A PART OF THE CONTRACT DOCUMENTS AND
MODIFIES THE ORIGINAL BIDDING DOCUMENTS DATED 9/23/26, AS NOTED
BELOW.
ALL BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE
PROVIDED ON THE BID FORM. FAILURE TO DO SO MAY SUBJECT THE BIDDER TO
DISQUALIFICATION.
Questions
1. In reviewing the plans provided, specifically pertaining to the Bates School sheet A1.3A no radiator widths were provided for this school group, plan excerpt attached for reference.
Please review and provide widths accordingly.
Answer: Below is the updated table for Bates School
FLOOR
ROOM
NAME
# OF
RADIATORS
SILL
HEIGHT
RADIATOR
HEIGHT
TOP OF
RADIATOR
TO SILL
WALL TO
BACK OF
RADIATOR
WALL TO
FRONT OF
RADIATOR
RADIATOR
WIDTH
1 Corridor 3 30" 28" 2" 1" 6" 8' 1 Stair A 1 NA 28" NA 1" 6" 4' 1 Stair B 1 NA 30" NA 1" 6" 3' 2 Stair A 1 36" 30" 6" 1" 6" 8' 2 Stair B 1 36" 30" 6" 1" 6" 8' 2 Corridor 1 NA 30" NA 1" 6" 4' 2 Corridor 2 30" 28" 2" 1" 6" 8'
Total 10
2. Spec 00 11 00 pg2 states DCAMM bidder certified in “electrical”. We assume this is in error. Please confirm.
Answer: That is correct, it should have read “DCAMM bidder certified in General Building Construction/Carpentry”
3. Since the work is being done during the school year, we (from experience) expect radiators will be covered in teacher and student items. Can we assume these items to be cleared by the school in order for us to install and paint the new covers we will be installing?
Answer: Yes, the radiators will be cleared by the school.
4. On the form of general bid the unit price states 1”(or one inch) radiator cover installation.
The unit price is then called out as LF (lineal foot) Can you clarify the unit price?
Answer: The unit price is linear foot.
5. Please confirm the unit price on the general bid form is for Fabrication and installation. The description only describes installation (“ 1” Radiator Cover Installation ”).
Answer: The unit price on the general bid form is for fabrication and installation.
END OF ADDENDUM NO. #1