Addendum #1- Ice Arena New Scoreboards.pdf
PDF 107 KB Posted
- Attached to
- Ice Arena New Scoreboards
- Solicitation number
- 2137661
- Issued by
- Chautauqua County, New York
About this file
This Addendum #1 modifies the Ice Arena New Scoreboards solicitation issued by the State University of New York at Plattsburgh under IFB 26MG0720-D000961. The addendum addresses nine clarifying questions submitted by potential bidders regarding the new scoreboard installation project. Key responses confirm that the new video board will be used for scoring, establish a 30 3/4" minimum doorway dimension on the upper level to accommodate a GS-1930 scissor lift (weighing 3,209 lbs), and specify a 100 Amp disconnect as the current power source for the video board. The addendum indicates that detailed information regarding low voltage cabling types, distances from displays to the control room, and connections from center ice to the control room and hockey goal light locations remains unknown at the time of issuance. Most significantly, the addendum updates the bid due date to Wednesday, August 26, 2026 at 3:30 p.m. local time, extending the original deadline of August 20, 2026.
All other specifications, requirements, and terms outlined in the original Invitation for Bids remain unchanged. These include the mandatory pre-bid meeting scheduled for August 12, 2026 at 11:00 a.m. at the SUNY Plattsburgh Field House Lobby, the project completion deadline of February 1, 2027, required bid security of not less than 5% of the total bid amount, and the MWBE participation goals of 11.00% for MBE, 19.00% for WBE, and 6.00% for SDVOB. No incumbent contractor has been awarded an identical or substantially similar contract within the past five years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 26MG0720-D000961 - Ice Arena New Scoreboards.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
Ice Arena New Scoreboards
26MG0720-D000961
1. Will the new video board need to be used for scoring?
Response: Yes, the new scoreboards will need to be used for scoring.
2. What is the weight restriction on the upper level for a scissor lift.
Response: Unknown. We use a GS-1930 on the upper level, which weighs 3,209 lbs.
3. Do you have the dimensions of the doorway on the upper level for a lift to come through?
Response: 30 3/4" minimum. We are able to get a GS-1930 through the doorway. It is only a single door.
4. What size (Amperage) is the current disconnect feeding the video board?
Response: 100 Amp disconnect
5. What type of low voltage cabling is running to each video display. Do we know the distance to the control room from each display.
Response: This is not known at this time.
6. What type of low voltage cabling is running to each locker room clock?
7. What type of low voltage cabling is running from center ice to the control room?
8. What type of low voltage cabling is running from center ice to each hockey goal light location?
9. Bid due date is being updated to Wednesday, August 26, 2026 at 3:30pm local time.
All other specifications in the IFB remain otherwise unchanged.