Addendum 1.pdf
PDF 346 KB Posted
- Solicitation number
- RFB 785 2700000085 2
- Issued by
- Kentucky
About this file
This addendum, issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration, modifies Invitation to Bid No. RFB-67-27 for interior renovations at the Prestonsburg Readiness Center under the Department of Military Affairs. Addendum No. 1, dated September 1, 2026, clarifies project requirements through architectural drawings and specifications prepared by alt32 Architecture | Design. The addendum provides elevation drawings of the lobby and detailed specifications for door head installations, which are binding upon the contract to be issued in response to the invitation to bid. Bidders are required to acknowledge receipt of the addendum in their proposal forms, as the addendum constitutes part of the contract documents and governs contractor work as if the information were included in the original plans.
The addendum includes technical drawings at scales of 1/2" = 1'-0" and 3" = 1'-0" depicting the lobby section and door head details with specifications for blast resistance entry systems, new light fixtures, exit signage with Braille characters, new vinyl base, and structural components including steel angles, HSS tubing, metal stud framing, and wood blocking. The drawings specify mechanical fastener requirements, ceiling repairs, and integration with existing CMU walls and lay-in ceiling systems. No pricing information, set-asides, funding sources, or contract term details are addressed in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2700000085_1_SO_FORM.PDF | ||
| Final_RFB_785_2700000085_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-67-27
FOR: Interior Renovations Prestonsburg Readiness Center Department of Military Affairs Prestonsburg, Kentucky
DATE: September 2, 2026
RFB-785-2700000085
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-67-27 For: Interior Renovations Prestonsburg Readiness Center Department of Military Affairs Prestonsburg, Kentucky
Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO.1
9/1/2026
To: All Planholders
From: alt32 Architecture | Design 310 Old Vine Street, Suite 300 Lexington, KY 40507-1582
Re: RFB-67-27 DMA – Prestonsburg RC Interior Renovation
The purpose of this addendum is to clarify further the requirements of the plans. The contractors are governed by the information in the addendum as if included in the plans.
The addendum is part of the contract documents. The bidders shall acknowledge receipt of the addendum in their form of proposal.
1) Attached is the elevation drawing of the Lobby and additional details related to the door heads.
End of Addendum.
LOBBY
CORRIDOR
A P
P R
O X
IM
A
T E
E X
IS
T
IN
G
C
O N
F
IR
M
100 100A
NEW VINYL
BASE
BLAST
RESISTANCE
ENTRY SYSTEM
AS SPECIFIED
NEW DOOR SYSTEM
AS SPECIFIED
EXIT
NEW LIGHT
FIXTURE AS
SPECIFIED
NEW LIGHT
FIXTURE AS
SPECIFIED
EXIT SIGN AS
SPECIFIED
B-1
B-1
EXIT SIGN
WITH BRAILLE
CHARACTERS
Scale
Project number
Date
Drawn by
Checked by 1/2" = 1'-0"
/1
/2
:2
:0
P M
A-1
SECTION - LOBBY 100
RFB-67-27
DMA - PRESTONSBURG RC
INTERIOR RENOVATIONS
9-1-2026
TD
MS
No. Description Date
1/2" = 1'-0"A-1
1 SECTION - LOBBY 100
ADDENDUM 1
3/4" ANCHOR BOLTS (2) TWO
PER VERTICAL LEG. INTO
EXISTING CMU WALL
6" X 6" X .25" STEEL
ANGLE EACH END
WELD STEEL ANGLE
TO STEEL TUBE
4" X 6" X .25" H.S.S. (STEEL TUBE)
HEAD CONTINUOUS
NEW LAY-IN CEILING
MECHANICAL
FASTENERS AS
REQUIRED BY
MANUFACTURER TO
ACHIEVE STRESS
RESISTANCE NEEDED
PATCH & REPAIR
EXISTING CEILING
AS NEEDED FOR
INSTALL OF ENTRY
NEW TREATED
WOOD BLOCKING
AS NEEDED
BLAST RESISTANCE
ENTRY SYSTEM AS
SPECIFIED
EXTERIOR INTERIOR
NEW LAY-IN CEILING
ALUMINUM ENTRY
SYSTEM AS
SPECIFIED
NEW LAY-IN CEILING
CEILING GRID
PERIMETER ANGLE
METAL CLIP ANGLE FOR
EACH STUD
22 GA. METAL STUD
FRAMING 16" O.C.
MECHANICAL
FASTENERS
WOOD
BLOCKING
CONTINUOUS
Scale
Project number
Date
Drawn by
Checked by 3" = 1'-0"
/3
/2
:4
:1
P M
B-1
DETAILS
RFB-67-27
DMA - PRESTONSBURG RC
INTERIOR RENOVATIONS
9-1-2026
TD
MS
No. Description Date
3" = 1'-0"B-1
1 SECTION DETAIL - DOOR HEAD
3" = 1'-0"B-1
2 SECTION DETAIL - DOOR HEAD
ADDENDUM 1
| ADDENDUM NO. 1.pdf |
| ADDENDUM NO 1.pdf |
| ADDEMDUM 1.pdf |
| A-1 - SECTION - LOBBY 100 |
| Sheets |
| A-1 - SECTION - LOBBY 100 |
| B-1 - DETAILS |
| B-1 - DETAILS |
| Sheets |
| A-1 - SECTION - LOBBY 100 |
| B-1 - DETAILS |
File details come from the government source that posted it. Updated .