About this file
This document is Addendum No. 1 to the Florida Department of Environmental Protection's Bid No. BDC02-24/25 for the Sand Placement project at Stone Memorial St. Joseph Peninsula State Park. The addendum notifies bidders that the requirement to wash the sand has been removed, and instead, the contractor must make 3,000 cubic yard stockpiles available at the mine for sampling and analysis by the engineer at least 14 days in advance. The engineer reserves the right to reject any stockpile based on the analysis results. As long as no rejection is received within 14 days, the contractor may proceed with loading and transporting the material to the project site for placement on the beach. All other contract documents remain in full force and effect.
The addendum also requires that the signed acknowledgment of receipt be included with the bid submission, and failure to do so may be grounds for bid rejection.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BDC Bid No. BDC02-24/25, Addendum #1, Page 1 of 1
FLORIDA DEPARTMENT OF
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard Tallahassee, FL 32399
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
August 8, 2024
NOTICE TO APPLICANTS
ADDENDUM NO. ONE (1)
Stone Memorial St. Joseph Peninsula State Park – Sand Placement
DEP BID NO. BDC02-24/25
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED
PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH
YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
1. The requirement to wash the sand has been removed from the Technical Specifications (Section 4.03.E). In lieu of washing the sand, all material to be used for the project shall be made available at the mine in 3,000 cubic yards stockpiles for sampling and analysis by the ENGINEER. The stockpiles shall be created at least 14 days in advance of scheduled loading and transport to accommodate the sampling and analysis. The CONTRACTOR shall notify the ENGINEER when a stockpile has been created and ready for sampling. The ENGINEER reserves the right to reject the stockpile based on the results of the analysis. No material from a rejected stockpile shall be incorporated into the work. If no such rejection is received after 14 days of the CONTRACTOR’s notice of stockpile availability, the CONTRACTOR may proceed with loading and transporting the material to the project site for placement on the beach.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
NOTICE