AD251066 Cost Abstract.pdf
PDF 230 KB Posted
- Contract number
- 505CAP-M25-AD251066-01
- Issued by
- Wisconsin
About this file
This document is a Request for Bids (RFB) cost abstract for RFB Number AD251066, awarded to Utility Energy Systems, LLC. The procurement was issued by what appears to be a Wisconsin state agency, given the Wisconsin correctional facilities listed, with a bid submission deadline of July 10, 2024, at 1:00 PM CT. The contract covers eight correctional facilities across Wisconsin including Fox Lake Correctional Institute, Lincoln Hills School, Oshkosh Correctional Institute, Kettle Moraine Correctional Institute, Columbia Correctional Institute, Jackson Correctional Institute, Sangor Power Correctional Institute, and Stanley Correctional Institute.
The contract provides propane air system startup testing and preventive maintenance inspection services across all eight facilities. Each facility is charged an identical annual rate of $2,245.00 in 2024, with annual cost increases: $2,424.60 in 2025, $2,618.57 in 2026, $2,828.05 in 2027, and $3,054.30 in 2028. The total annual costs escalate from $17,960.00 in the first year to $24,434.40 in the final year, representing a five-year contract term from 2024 through 2028. The total contract value over the five-year period amounts to $105,364.16, with the pricing structure reflecting consistent annual percentage increases across all facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB/RFP RFB
RFB/RFP Number AD251066
RFB/RFP Title
Propane Air System Start Up Testing and Preventive Maintenance Inspection
Service Due Date and Time July 10, 2024, 1:00 PM CT
Bidder's Name Utility Energy Systems, LLC.
Annual
Cost 2024 Annual
Cost 2025 Annual
Cost 2026 Annual
Cost 2027 Annual Cost
Faclilty Location
Fox Lake Correctional Institute Fox Lake 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Lincoln Hills School Irma 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Oshkosh Correctional Institute Oshkosh 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Kettle Moraine Correctional Institute Plymouth 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Columbia Correctional Institute Portage 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Jackson Correctional Institute Black River Falls 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Sangor Power Correctional Institute Oneida 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Stanley Correctional Institute Stanley 2,245.00 2,424.60 2,618.57 2,828.05 3,054.30 Total Annual Cost $17,960.00 $19,396.80 $20,948.56 $22,624.40 $ 24,434.40 Total Bid Cost (Sum of Total Annual Costs 2024-2028) $105,364.16
Cost Abstract
File details come from the government source that posted it. Updated .