A1 Penoke Bike Trail Task Order 2022_2023.docx
DOCX document 20 KB Posted
- Solicitation number
- 12445522Q0212
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A4 Penoke Maint section B.jpg | JPG image | |
| A5 Penoke Maint site 1.jpg | JPG image | |
| A13 Questions and answers for Allegheny Spring ATV Heavy Trail Maintenance.docx | DOCX document | |
| A11 Penoke Maint site 7.jpg | JPG image | |
| A12 DBA Wage Determination PA2022002 Elk Forest Mckean and Warren Counties.pdf | ||
| A6 Penoke Maint site 2.jpg | JPG image | |
| A7 Penoke Maint site 3.jpg | JPG image | |
| A2 ANF ATV trails maintenance SOW revised.docx | DOCX document | |
| A3 Penoke Maint section A.jpg | JPG image | |
| A9 Penoke Maint site 5.jpg | JPG image | |
| 12445522Q0212.pdf | ||
| A10 Penoke Maint site 6.jpg | JPG image | |
| A8 Penoke Maint site 4.jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Penoke Bike and ATV Trail Maintenance BPA Task Order Schedule of Items June 15, 2022
Scope of Work:
Work section A, can be accessed from Forest Rd 226 Goat farm Rd and Duhring Rd.
Work section B, can be accessed from state route 66 trail crossing and Duhring Rd.
Works sites section 1-7 from state route 66 trail crossing and Duhring Rd Forest Rd 226 Goat farm Rd.
Normal Tread Maintenance: Maintain trail tread, including pulling in material from undesirable berms and reincorporating into tread, correcting damage that corrupts drainage pattern. The work will include reshaping the rail to the original insloped /outsloped condition and controlling surface drainage to prevent further degradation of the trail and compact all disturbed areas. All dips will be reconstructed. Maintain all existing ditches, dips and leadoff ditches as part of the trail tread maintenance. Normal maintenance will include reconditioning of trails with not more than 6” deep ruts or holes in the tread surface. The depth will be measured using a 60” straight-edge across the drivable surface and measuring the depth of ruts/holes from the bottom of the straight edge to the deepest depth of the ruts or holes. If more than 20% of the ruts in a section are over 6” deep, the section will be evaluated under heavy tread maintenance.
Heavy Tread Maintenance: This item will be used for heavily damaged trail tread that would require more than normal maintenance to return to original shape. Heavy maintenance will include areas that are deeply rutted, have large waterholes and drainage has been significantly changed and where more than normal amount of work is needed to repair. In all cases the trail is still defined but has significant reshaping to be performed. Heavy tread maintenance will include the following: Remove and reshape berms as needed, pulling in material from undesirable berms and reincorporating into tread and compacting, correcting damage that corrupts drainage pattern, reshaping the trail to the original insloped/outsloped condition and controlling surface drainage to prevent further degradation of the trail. All dips will be reconstructed as directed by the COR. Maintain all existing ditches, dips, and leadoff ditches as part of the heavy trail tread maintenance. Use Heavy Tread maintenance if the ruts/holes are more than 6” and less than 18” deep as measured with a 60” straight-edge, and less than 30 CY of material needs to be moved over a 150’ length of trail
Work Description:
Section A Penoke Bike and ATV trail:
00+00 Start Normal Maintenance.
00+25872 End Normal Maintenance Section B Penoke Bike and ATV trail:
00+00 Start Normal Maintenance.
00+ 12672 End Normal Maintenance Section A Site 1:
00+00 Start Heavy Maintenance.
Start rip rap (R3) limestone. 22 tons.
Start 2A limestone. 22tons.
00+122 End Heavy Maintenance End rip rap (R3) limestone.
End 2A limestone.
Section A Site 2:
00+00 Start Heavy Maintenance.
00+150 End Heavy Maintenance
Section A Site 3:
00+00 Start Heavy Maintenance.
00+150 End Heavy Maintenance
Section A Site 4:
Start rip rap (R3) limestone 22 tons.
Start 2A limestone 10 tons.
Cover culvert with stone.
00+150 End Heavy Maintenance End rip rap (R3) limestone.
End 2A limestone.
Section A Site 5:
Section A Site 6:
Start rip rap (R3) limestone. 66 tons.
Start 2A limestone. 22tons.
End rip rap (R3) limestone.
Section B Site 7: