This solicitation requests proposals for a fixed-price construction contract to renovate asphalt paving at the Lyons Ferry Fish Hatchery. The U.S. Fish and Wildlife Service will award a contract valued between $1 million and $5 million to complete the work by November 1, 2021. The project involves cold milling, patching, and resurfacing asphalt surfaces. Offerors must be registered in the System for Award Management and this acquisition is set aside for small businesses as defined by NAICS code 237310 with a size standard of $39.5 million. Proposals are due in response to solicitation number 140F0321R0001. The agency will evaluate proposals based on recent relevant experience and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to WA Lyons Ferry Fish Hatchery Paving, newest first.
File Type Posted
Sol_140F0321R0001_Amd_0003.pdf PDF
Question and Answers_0002.docx DOCX document
Existing Grade Surface 8270-xgd_0002.pdf PDF
Updated Proposal Schedule_0002.pdf PDF
Sol_140F0321R0001_Amd_0002.pdf PDF
Updated Proposal Schedule_0002.xlsx XLSX spreadsheet
Updated Specification Table of Contents_0002.doc DOC document
Lyons Ferry_Geotech Report_0002.pdf PDF
Sol_140F0321R0001_Amd_0001.pdf PDF
Past Performance Questionnaire.pdf PDF
Sol_140F0321R0001.pdf PDF
A06 Lyons Ferry Paving 100 Drawings .pdf PDF
B03 DOL Wage Determination.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

LYONS FERRY NATIONAL FISH HATCHERY

ASPHALT PAVING RENOVATION PROJECT

TECHNICAL SPECIFICATIONS

August 2019

LYONS FERRY NATIONAL FISH HATCHERY

ASPHALT PAVING RENOVATION PROJECT

TABLE OF CONTENTS

01 00 00 – GENERAL REQUIREMENTS

02 41 00 – SITE DEMOLITION

03 30 00 – CAST-IN-PLACE CONCRETE

31 23 00 – EXCAVATION AND FILL

31 23 33 – TRENCHING BACKFILL & COMPACTION

31 25 00 – EROSION CONTROL

32 12 16 – ASPHALT PAVING

August 2019 01 00 00 - 1 FWS Lyons Ferry NFH

SECTION 01 00 00

GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

A. Work: Includes all necessary materials, labor superintendence, management, fees, assessments and costs to design and construct the project in accordance with the contract documents.

B. Ancillary Design

1. General

2. Documentation

3. Design Build elements

01 11 40 WORK RESTRICTIONS

A. Service outages: Limit service outages to maximum 4 hours unless written permission is obtained from COTR and Station Manager

B. Work Hours: For on-site construction work, hours shall be normal business hour of operation for that facility which are normally Monday through Friday, 7:00 AM to 5:00 PM, except federal holidays, unless approved otherwise.

C. Housing for workers and campsites are not available on site unless explicitly indicated otherwise in the Task Order.

D. Government buildings and other facilities are not available for storage of Contractors materials, equipment, and tools. Government owned equipment is not available for Contractors use to accomplish any Work.

E. Habitat Restrictions: Wildlife habitat issues may restrict building seasons. Coordinate with COTR for requirements.

01 20 00 PAYMENT PROCEDURES

A. Measurement: No measurement of the work will be made, unless unit prices are included in the project.

B. Payment: Payment will be made monthly for approved work performed in accordance with the contract requirements under the items listed in the Schedule of Items and based on the approved Schedule of Values.

C. Application for Payment:

1. Schedule of Values:

a. Prepare a Schedule of Values in the format (or approved equivalent format) of the American Institute of Architects (AIA) form number G702/703 Application and Certificate for Payment.

b. Submit a detailed Schedule-of-Values within 7 days prior to the start of on-site construction work. Format the schedule-of-values to match the Pricing Schedule and show sufficient additional detail to allow accurate calculation of monthly progress payments

2. Certified Payrolls: Submit certified payrolls current to within 1 week of payment application period.

3. Invoices: Electronically submit an invoice with updated Schedule of Values to:

U.S Fish & Wildlife Service, Region 1 911 NE 11th Avenue Portland, OR 97232-4181

01 31 00 PROJECT MANAGEMENT AND COORDINATION

August 2019 01 00 00 - 2 FWS Lyons Ferry NFH

A. The standard Government forms, specifications, associated plans, solicitation provisions, and contract clauses made a part of the contract are essential parts thereof, the requirements in one are as binding as though contained in all. They are intended to be mutually supplementary to describe and provide for a completed project.

B. In cases of conflict between specifications, contract provisions, supplemental agreements, and provisions of Standard Government Forms; the provisions of Standard Government Forms shall govern. In all cases of dispute in respect to such conflict or as to what part or parts of the specifications apply to any given parts of the work, decisions shall be made by the Contracting Officer (CO).

C. Coordination

1. Coordinate scheduling, submittals, and work of the various sections of specifications to ensure efficient and orderly sequence of installation of interdependent construction elements.

2. Verify and confirm all dimensions and conditions shown or implied on the Drawings and specifications as well as the physical conditions of the site. Notify COTR of discrepancies prior to start of work for resolution.

3. Verify that characteristics of construction equipment are compatible with required direct and indirect construction activities necessary for completing all of the required improvements.

4. Provide field engineering and construction surveying, including but not limited to staking, to accurately establish the horizontal and vertical locations of the work.

5. Government furnished drawings shall not be scaled to obtain missing or conflicting dimensions. The Construction Contractor shall keep a check on dimensions and details as the work progresses and any errors or discrepancies discovered shall be promptly reported to the COTR.

D. Accomplish construction work in a manner that does not interfere with ongoing station operations, nor allow any construction material or debris to enter waters of the State.

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

A. Schedule:

1. Distribution: At Preconstruction Meeting, submit initial schedule.

2. Develop schedule on commercially available computer scheduling software

3. Provide schedule showing work break down structure or precedence diagram.

4. Identify day, date, duration, and float for each work activity.

5. Break down activities by, skill set or trade, geographic location within project, separation in time, work hours, (80-100) or cost ($5000.00-$10,000.00 maximum)

6. Identify all interfaces with government that may impact schedule. Keep government interfaces from critical path to maximum extent practical.

7. Update schedule to reflect changes/delays in the work.

8. Provide 3-4 week look ahead Schedules. Update Schedule every week and submit to COR.

Coordinate activities with Station manager.

B. Notification: Provide Station Manager 48 hours written notice prior to all service outages. Coordinate timing of outage to minimize conflicts with normal operations.

C. Project meetings

1. Preconstruction Meeting: Project Manager/COR will arrange a Preconstruction Meeting prior to start of any construction. Require attendance by all parties affected by the work. Take and distribute meeting notes to all affected parties.

2. Progress Meetings: As required by the progress of the project, Contractor will coordinate progress job meetings. Require attendance by all parties affected by the work

3. Contractor will take and distribute meeting notes to all affected parties. Notes should be distributed within 48 hours of meetings.

01 33 00 SUBMITTALS

August 2019 01 00 00 - 3 FWS Lyons Ferry NFH

A. Master Submittal List: Submit Master submittal list identifying all submittals required. Submit list at Pre-construction meeting. Identify each submittal by title and appropriate specification section.

Sequentially number each submittal.

B. Electronically transmit submittals with the Government-furnished Submittal Form R1-67 that will also be used as the document for approving or disapproving submittals. Government will furnish R1-67 in Word format for interactive use. Submit R1- 67 form in Word format for transmittal sheet of each submittal. Obtain written approval before items are ordered. Use a separate R1-67 form for each broad category of material to avoid confusion should a re-submittal be necessary.

C. Submit all submittals to the COTR signed by the Contractor indicating they comply with the contract requirements. Submittals without the Contractor’s signature will be returned without action.

D. Submittals shall contain detailed product literature, shop drawings, material samples, and/or finish samples fully describing the items proposed for installation.

E. Conspicuously mark the item submitted to explicitly indicate the specific options, models, mechanical/electrical characteristics, trim styles, colors, sizes, etc. Annotate the submittal to cross reference to the mark numbers/group numbers shown on the drawings and/or specification.

F. Tab and index submittals containing more than ten pages.

G. Explicitly and clearly indicate all features that differ from the contract requirements.

H. Submittals will be returned to the Contractor within 14 working days of the date received by the

COTR.

I. Submit documentation for all products, materials, and equipment proposed for use.

J. Material Certifications:

2. Submit manufacturer’s certificate indicating material or product conforms or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

3. Certificates may be recent or previous test results on material or product but must be acceptable to COTR.

K. Samples:

1. Submit exact product or material to be used.

2. Submit product sample of size specified and of sufficient size to clearly show the characteristics, integral parts, and attachment of the product or system.

3. Submit interior and exterior color and texture samples at one time for coordinated review by

COTR.

01 35 00 SPECIAL PROCEDURES

A. Rollover Protection and Seat Belts: In addition to the Safety and Health requirements of clause Federal Acquisition Regulation (FAR) 52.236-13 of Part 2, Section I of this Contract, rollover protection and seat belts required by 29CFR 1926 (OSHA) shall be extended to include equipment regardless of the year of manufacture.

B. Immediately stop work if paleontological, archaeological or historical remains (including burials or skeletal material) are encountered, immediately stop the work and notify the Inspector, Contracting Officer’s Technical Representative, or Contracting Officer. The Contracting Officer will notify the Regional Archaeologist so the provisions of 36 CFR 800.7 (Resourced Discovered During Construction) and other relevant laws are followed. Work will cease in the immediate vicinity until permitted to resume by written order from the Contracting Officer. Work in other areas may proceed as approved by the regional Archaeologist.

August 2019 01 00 00 - 4 FWS Lyons Ferry NFH

C. Hazardous Materials: The proposed work areas are believed not to contain any hazardous materials.

Should any unknown hazardous materials be encountered, stop work immediately and notify COTR in writing of condition.

01 40 00 QUALITY REQUIREMENTS

A. Contractor Quality Control:

1. The contractor is responsible for the overall quality of all its own work and the work performed by their subcontractors working under this contract.

2. The quality of any part of the work installed must not be less than that required by the technical divisions of this specification.

3. If the CO determines that the quality of work does not conform to the applicable specifications and drawings, the contractor will be advised in writing of the areas of nonconformance, and within 7 days the contractor must correct the deficiencies and advise the CO in writing of the corrective action taken.

4. Supervision: At all times when onsite work is underway, provide an onsite Project Manager or Project Superintendent who has a good working knowledge of the project work and who is able to converse (read, write, and speak) fluent English.

B. Noncompliance with Quality Control Requirements: Failure of the contractor to comply with the above requirements may be cause for termination for default.

C. Quality Control Procedures

1. Monitor quality control over Contractor staff, subcontractors, suppliers, manufacturers, products, services, site conditions, and workmanship.

2. Comply fully with manufacturer's published instructions, including each step in sequence of installation.

3. Should manufacturer's published instructions conflict with Contract Documents, request clarification from Contracting Officer before proceeding.

D. Comply with specified standards as a minimum quality for Work, except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform Work by persons who are thoroughly qualified and trained in their respective trade, to produce workmanship of specified quality.

F. Perform tests required by governing authorities having jurisdiction and utilities having jurisdiction.

G. Maintain check-off list of Work that does not comply with Contract Documents, stating specifically what is non-complying, date faulty Work was originally discovered, and date Work was corrected. No requirement to report deficiencies corrected same day it was discovered. Submit copy of Non- Compliance Check-Off List of non-complying work items to Contracting Officer on a weekly basis.

H. Prior to final acceptance by Contracting Officer, submit a certification signed by Contractor to

Contracting Officer stating that all Work has been inspected and all Work, except as specifically noted, is complete and in compliance with Contract Documents.

I. Project Safety:

1. The Contractor is responsible for safety on the project site at all times, from issuance of the Notice to Proceed until final completion and acceptance of the project by the Contracting Officer.

2. The Contractor is responsible for ensuring that all onsite activities, equipment, and facilities constructed by the Contractor, subcontractor, or supplier conform fully to the standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1926 and 1910; and DOI and FWS policies.

3. Adhere to all current Federal, State and local safety requirements. In the event where any safety standard referenced herein conflicts with another, the more stringent shall govern.

August 2019 01 00 00 - 5 FWS Lyons Ferry NFH

4. Initiate and maintain, throughout the performance of this contract, an effective safety program that provides adequate policies, procedures, and practices to protect their employees from, and allow them to recognize, job-related safety and health hazards.

5. Include in safety program, provisions for the identification, evaluation, prevention and control of general work site hazards, specific job hazards, and potential hazards that may arise from foreseeable construction methods and conditions, as well as providing a competent person to conduct frequent and regular inspections.

6. Each employee for all contractors and subcontractors must be instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment.

7. Provide barricades and warning devices as necessary to safeguard the public, workers, and government personnel.

8. Where project work affects public roads, provide signage in accordance with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) as published by the US Department of Transportation, Federal Highway Administration.

01 41 00 REGULATORY REQUIREMENTS

A. Regulatory Requirements:

1. Comply with all applicable federal, state, and local environmental laws and regulations. This condition applies to, but is not limited to, laws and regulations governing noise levels, air and water quality standards, and cultural resources.

2. Comply with the current edition of the National Fire Protection Association (NFPA) 101 Life Safety Code, International Building Code, Architectural Barriers Act (ABA), National Electric Code, International Plumbing Code, and International Mechanical Code

3. If the code provisions conflict, the more stringent code provision shall govern.

4. In any instances where the drawings and specifications do not specify explicit materials or methods, then perform the work in accordance with the minimum requirements of the code applicable to the work.

B. Permit Responsibility:

1. In general, customary building permits, mechanical and electrical permits are not required.

2. The Contractor shall, arrange for, obtain, and pay for any permits, licenses, government charges, connection fees, assessments, and inspection fees necessary for interface connections with serving utilities or other agencies having jurisdiction for prosecution of the Work.

3. Include fees for items above as a line item in the Schedule of Values

01 42 00 REFERENCES

A. Acronyms

1. USFWS, US FWS, US & FWS, FWS, Owner, Government, and Service, are all intended to mean U.S Fish & Wildlife Service, Region 1 911 NE 11th Avenue Portland, OR 97232-4181

2. CO: Contracting Officer

3. COTR or COR: Contracting Officers Technical Representative

4. CGS: Division of Contracting and General Services, Region 1, U.S. Fish & Wildlife Service.

5. DOI: Department of Interior

5. EN: Division of Engineering, Region 1, U.S. Fish & Wildlife Service.

6. D/B: Design Builder or Design Build entity

7. FF&E: Furnishings, Fixtures, and Equipment

8. NWR: National Wildlife Refuge

9. NWRC: National Wildlife Refuge Complex

10. NFH: National Fish Hatchery

11. NFHC: National Fish Hatchery Complex

B. Definitions

1. Allowance(s): A specific monetary sum included in the basic contract amount for a contract element that is undefined. Allowance includes all labor, materials, incidental expenses, taxes, August 2019 01 00 00 - 6 FWS Lyons Ferry NFH and contractor markups for incorporation of the element into the project. Allowances will be paid for on a time and materials basis after submittal and approval of a detailed cost break down and a contract modification has been issued. Should the allowance amount exceed the actual cost, savings will accrue to the Owner. Should the allowance not cover the cost an equitable contact modification will be issued.

2. Authority Having Jurisdiction: Division of Engineering, Region 1, U.S. Fish & Wildlife Service

3. Industry Standard: A reference standard that establishes a level of quality, performance or other characteristic of a material or system.

4. Local Authority Having Jurisdiction: Duly adopted local code authority, agency, or serving utility governing or serving the location of the project.

5. Remove and Replace (RR): Remove existing component or assembly and replace in kind with new materials of same type, design, quality, and operating characteristics.

6. Remove and Salvage (RSALV): Remove component, equipment or assembly intact and turn over to government for their use.

7. Refurbish (RFR): Restore component, equipment, or assembly “as new”. Refurbishing includes, but is not limited to, cleaning, restoring finishes, making inoperable items operable, rewiring, re-lamping, custom manufacturing unavailable parts, and replacing missing parts. If necessary for refurbishment, remove component, equipment, or assembly intact, refurbish, and reincorporate it into the project.

8. Remove and Reinstall (RSR): Remove component, equipment, or assembly intact. Store and protect removed items, reincorporate into project in same condition prior to removal.

9. Unit Price: Establishment of a price based on a per unit basis or task basis for work to be provided in the project. Unit prices will be good for the duration of the project. Quantities will be measured and only actual quantities installed will be paid for. Unit prices should include all costs including taxes and fee for furnishing and installing into the project. When unit prices are within 10% of estimated amounts the initial unit price will be valid. When unit price quantity exceeds 10% of estimated amounts unit price may be renegotiated.

01 4 00 TESTING AND INPECTION

A. Employ and pay for services of an independent testing agency or laboratory acceptable to Owner to perform specified testing.

1. Prior to start of Work, submit testing laboratory name, address, and telephone number, and names of full time [registered Engineer] [specialist] and responsible officer.

2. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection.

B. The independent firm will perform tests, inspections and other services specified in individual specification sections and as required by Engineer. Refer to sheet S-001 for additional Special Inspection requirements.

1. Laboratory: Authorized to operate in State of Oregon.

2. Laboratory Staff: Maintain full time specialist on staff to review services.

3. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to

National Bureau of Standards or accepted values of natural physical constants.

C. Testing, inspections and source quality control may occur on or off project site. Perform off-site testing as required by Owner’s Representative.

D. Reports will be submitted by independent firm to Engineer, Contractor, and authority having jurisdiction, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.

E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.

F. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

August 2019 01 00 00 - 7 FWS Lyons Ferry NFH

G. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by Engineer.

H. Agency Responsibilities:

1. Test samples of mixes submitted by Contractor.

2. Provide qualified personnel at site. Cooperate with Owner’s Representative and Contractor in performance of services.

3. Perform specified sampling and testing of products in accordance with specified standards.

4. Ascertain compliance of materials and mixes with requirements of Contract Documents.

5. Promptly notify Owner’s Representative and Contractor of observed irregularities or non-conformance of Work or products.

6. Perform additional tests required by Architect/Engineer.

7. Attend preconstruction meetings and progress meetings.

I. Agency Reports: After each test, promptly submit two copies of report to Owner’s Representative, Contractor, and authority having jurisdiction. When requested by Engineer, provide interpretation of test results. Include the following:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and specifications section.

6. Location in Project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents.

J. Limits On Testing Authority:

1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents.

2. Agency or laboratory may not approve or accept any portion of the Work.

3. Agency or laboratory may not assume duties of Contractor.

4. Agency or laboratory has no authority to stop the Work.

01 51 00 TEMPORARY FACILITIES

A. Provide temporary facilities and utilities needed including heat, light, power, water, telephone, sanitary facilities, job offices, storage enclosures, safety devices, construction aids, and support equipment.

B. If suitable FWS power and water is present on the site, those utilities may be used for construction purposes at no cost to the Contractor.

C. Coordinate on site parking and access with Station Manager.

D. Maintain all fire access lanes and fire parking areas clear of all construction materials, vehicles, and equipment.

E. Comply with all applicable federal, state, and local environmental laws and regulations. This condition applies to, but is not limited to, laws and regulations governing noise levels, air and water quality standards, and cultural resources.

F. Protect adjacent vegetation, property, structures, and improvements from damage.

G. Coordinate with the local FWS staff to select a construction staging area

August 2019 01 00 00 - 8 FWS Lyons Ferry NFH

H. Provide safety equipment and methods as necessary to perform the work in a safe manner in accordance with federal and state health and safety regulations. Provide temporary fencing, barricades, and warning devices as necessary to safeguard the public and government personnel.

01 61 00 BASIC PRODUCT REQUIREMENTS

A. Definition: “Product” means new material, machinery, components, equipment, fixtures, and systems of current manufacturer included in the work, and not including machinery and equipment used for preparation, fabrication, conveying and erection of the work. Products may include existing materials or components required for reuse.

B. Provide Products that comply with Contract Documents, are undamaged and new at time of installation.

I. Provide Products complete with accessories, trim, finish, safety guards, and other devices and details needed for complete installation and intended use and effect.

J. Substitutions may be considered when Contractor becomes aware of a product or procedure that is more environmentally sensitive.

K. Provide interchangeable components of the same manufacturer, for similar components.

L. Use of asbestos or lead containing products is prohibited.

M. Product Selection

1. Comply with specified industry standards.

2. Provide products in size, type, and quantity indicated and specified, unless, variations are accepted by CO in writing.

3. Provide products with capacities, sizes, and performance ratings indicated and specified, unless, variations are accepted by CO in writing.

4. Two or more products of the same kind shall be identical and by the same manufacturer.

01 63 00 PRODUCT SUBSTITUTION PROCEDURES

A. Product Options

1. For Products specified by Reference Standards or by description only, select any Product meeting those standards or description.

2. For Products specified by naming one or more manufacturers and allowing no options for substitutions, use products of manufacturers named and meeting specifications.

3. For Products specified by naming one or more manufacturers with a provision for substitutions, Contractor must submit a Request for Substitution for any manufacturer not specifically named.

4. Use of the terms “or equal”, “approved”, or approved substitution”, means substitutions are allowed.

5. When a single product or material is identified and substitutions are allowed it is the intent of the specified product or material to provide a level of quality, design and performance for evaluation of substitutions.

B. Substitution Representations

1. A substitution request constitutes a representation that the Contractor has investigated the proposed product and determined that it meets or exceeds the quality level of the specified product or system.

2. The contractor will provide the same warranty for the substitution as for the specified product

3. The contractor will coordinate the installation and make changes to the work, which may be required for the work to be completed with no additional cost to the government.

4. Waive claims for additional costs or time extensions which may subsequently become apparent.

5. Reimburse the government for review or redesign services associated with re-approval.

C. Substitution Procedures

1. Submit substitution requests on a copy of the CSI Substitution Request Form.

August 2019 01 00 00 - 9 FWS Lyons Ferry NFH

2. Submit a separate request for each product, supported with complete data, drawings, and samples as appropriate.

3. Substitution requests for a multiple list of mechanical and electrical components in one category of work by one manufacturer may be listed on one Substitution Request Form.

4. COTR will notify Contractor, in writing, of decision to accept or reject substitution request.

01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Transport and handle Products in accordance with manufacturer's instructions, using means and methods that will prevent damage, deterioration and loss, including theft.

B. Schedule Product delivery to minimize long-term storage at Project site and prevent overcrowding of construction spaces.

C. Coordinate Product delivery with installation schedule to assure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

D. Deliver Products to Project site in undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

E. Promptly inspect shipments to ensure that Products comply with project requirements, quantities are correct, Products are undamaged, and properly protected.

F. Store and protect Products in accordance with manufacturers' published instructions, with seals and labels intact and legible.

G. Store Products subject to damage by elements above ground, under cover in weather tight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer's published instructions.

H. For exterior storage of fabricated Products, place on sloped supports, above ground.

I. Provide off-site storage and protection when Project site does not permit on-site storage or protection.

J. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation or potential degradation of Product.

K. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

01 71 00 EXAMINATION

A. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive Work.

B. Report in writing to COTR prevailing conditions that will adversely affect satisfactory execution of the

Work. Do not proceed with Work until unsatisfactory conditions have been corrected.

C. By beginning Work, Contractor accepts conditions and assumes responsibility for correcting unsuitable conditions encountered at no additional cost to the US Fish and Wildlife Service.

01 73 00 EXECUTION

A. Manufacturer’s Instructions

1. Handle Store, fabricate, erect, install, connect, apply, clean, condition and adjust products and systems in accordance with manufacturer’s printed instructions and in conformance with requirements specified herein.

August 2019 01 00 00 - 10 FWS Lyons Ferry NFH

3. Obtain and distribute copies of manufacturer’s printed fabrication, installation, and application instructions to parties involved in the construction.

4. Review and resolve conflicts between manufacturer’s instructions and contract documents with COTR prior to fabrication and installation of products and systems

B. Perform the work in accordance with the technical specifications and other provisions of this contract.

01 73 00 CUTTING AND PATCHING

A. Accomplish cutting and patching to:

1. Incorporate new work into existing work,

2. Remove defective non complying work,

3. Uncover defective work or work not installed in proper sequence.

4. Observe work covered by contractor prior to acceptance.

5. Provide openings in elements of work for penetration of mechanical and electrical and other utility work.

6. Remove samples of work for testing.

B. Employ original or skilled and experienced installer to perform cutting and patching.

C. Execute cutting and remove materials by methods which will prevent damage to other work and provide proper substrate for installation of repairs or new work

D. Submit written request in advance of cutting or altering elements that may effect:

1. Structural integrity of element

2. Integrity of weather exposure or moisture resistant elements

3. Efficiency, maintenance, or safety of element

4. Visual qualities of sight exposed elements

5. Work of owner or separate contractor

E. Identify any hazardous material or hazardous condition exposed during the cutting to the COTR for decision or remedy.

F. Provide shoring, bracing, and support to maintain structural integrity of the project.

G. Restore work with new products in accordance with specified requirements.

H. Patch and repair adjacent surfaces to comply with specified tolerances and finishes.

I. Refinish exposed surfaces to natural breaks in the existing finished surface

J. Refinish continuous surfaces or elements to nearest intersection.

K. Refinish entire unit or assembly.

L. Fill openings made oversized to install equipment, utility lines, and sleeves until finished surface is tight against penetrating material allowing for movement of penetrating member.

M. Maintain integrity of fire rating of any element, wall assembly, floor assembly, or roof /ceiling assembly.

01 74 00 CLEANING

A. Cleaning During Construction:

1. Maintain areas free of waste materials, debris, and rubbish. Maintain work areas and site in a clean and orderly condition.

2. Collect and remove waste materials, debris, and rubbish from work areas periodically

August 2019 01 00 00 - 11 FWS Lyons Ferry NFH

3. Upon Substantial Completion of the Work, or a portion of the Work, remove all debris, trash, construction wastes, materials, equipment, machinery, and tools arising from the Work to permit Government to occupy the Project or a portion of the Project for its intended use.

4. Restore Contractor used areas to their original or better condition.

5. Minimize creation of construction, deconstruction, and demolition waste. Minimize factors that contribute to waste such as over-packaging, improper storage, ordering error, poor planning, breakage, mishandling, and contamination.

6. Develop a Waste Management Plan to ensure that existing site and building materials are reused, salvaged, or recycled.

7. Unless modified by the CO, divert 50%, minimum, of total project waste from landfills. Dispose of all materials not salvaged, reused, or recycled legally, off-site, in licensed disposal facilities.

B. Final Cleaning:

5. Leave project broom clean and ready for occupancy.

6. Remove temporary protection and facilities installed during construction to protect previously completed installations during remainder of construction.

7. Dispose of all debris and rubbish legally in licensed disposal facilities

01 77 00 CLOSEOUT PROCEDURES

A. Thoroughly familiarize the local Field Station staff with the improvements and train them to be proficient in operation and maintenance.

B. Deliver to the project site any specialty tools, spare materials, maintenance materials, or similar devices such that the Field Station staff is able to operate and maintain the work.

C. Pre-final Walk Through:

1. Notify the COTR and schedule a preliminary walk through at an appropriate time prior to the anticipated date of completion of all work.

2. From this walk through COR will develop a punch list of items yet to be completed or deficiencies to be corrected.

3. The Contractor representative responsible for the work shall be present at the preliminary walk through and shall submit a preliminary list of unfinished work

D. Final Walk Through: Schedule final walk through upon completion of the work identified on the punch list.

E. The time required for walk-throughs and for making any corrections as a result thereof shall be included in the contract performance time.

F. Adjust operating products and equipment to ensure smooth unhindered operation.

H. Identify all closeout procedures on the project schedule.

01 78 00 CLOSEOUT SUBMITTALS

A. Submit a full size set of red-lined drawings and complete set of specifications that clearly indicates the as-constructed work. Submit one set of marked up record drawings, one set of reproducible CAD drawings showing as-constructed conditions, and one electronic copy on a CD complying with FWS CAD Standards.

B. Submit fully executed manufacturer’s standard material, product, and equipment warranties, assigned to U.S Fish & Wildlife Service.

C. Submit all regulatory-agency clearance documents indicating the work complies with their requirements, including but not limited to, finalized plumbing/gas/electrical inspections, septic system approvals, well approvals, and material testing and inspection reports.

August 2019 01 00 00 - 12 FWS Lyons Ferry NFH

D. After completion of the work and prior to final payment, submit a Release of Claims (Form DI-137 provided by USFWS), properly executed by the Contractor, releasing claims against the United States arising out of this contract, other than claims specifically excepted from the operation of the release.

END OF SECTION

SECTION 31 00 00

SITE CLEARNING

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Protecting existing trees and vegetation to remain.

2. Removing existing trees and other vegetation.

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Removing above- and below-grade site improvements.

6. Disconnecting, capping or sealing site utilities.

1.2 SUBMITTALS

A. Product Data for each type of product indicated.

1.3 MATERIAL OWNERSHIP

A. Except for stripped topsoil and other materials indicated to remain on Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site and disposed of properly.

1.4 PROJECT CONDITIONS

A. Traffic: minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

B. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated..

C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-control measures are in place.

E. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

1.5 DEFINITIONS

A. Topsoil: Natural or cultivated surface-soil layer containing organic matter, sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 2 inches in diameter; and free of weeds, roots, and other deleterious materials.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Note used this Section.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated.

C. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion- and sedimentation-control measures. Requirements for temporary erosion-and-sedimentation-control are specified in Section 31 25 00 “Erosion and Sedimentation Controls.”

3.3 TREE AND VEGETATION PROTECTION

A. General: Protect trees and plants remaining on-site according to requirements below.

B. Erect and maintain temporary fencing around tree protection zones before starting site clearing.

Remove fence when construction is complete.

C. Do not excavate within tree protection zones, unless otherwise indicated.

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

D. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Owner.

E. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation as possible.

1. Cover exposed roots with burlap and water regularly.

2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

3. Coat cut faces of roots more than 1-1/2 inches in diameter with an emulsified asphalt or other approved coating formulated for use on damaged plant tissues.

4. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

3.4 UTILITIES

A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.

1. Arrange with utility companies to shut off indicated utilities.

B. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner's written permission.

C. Excavate for and remove underground utilities indicated to be removed.

3.5 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction. Removal includes digging out stumps and obstructions and grubbing roots.

1. Do not remove trees, shrubs, and other vegetation indicated to remain or be relocated.

2. Cut minor roots and branches of trees indicated to remain in a clean and careful manner where such roots and branches obstruct installation of new construction.

3. Completely remove stumps and remove roots, obstructions, and debris to a depth of 18 inches below exposed subgrade.

4. Use only hand methods for grubbing within protection zones.

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground.

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

3.6 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.

B. Remove slabs, paving, curbs, and gutters at existing full-depth joints unless indicated otherwise.

Neatly saw-cut length of existing pavement to remain with vertical faces prior to removing existing pavement.

3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

B. Separate recyclable materials produced during site clearing from other nonrecyclable materials.

Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.

END OF SECTION 31 10 00

SECTION 31 20 00

EARTH MOVING

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

SECTION 31 20 00 - EARTH MOVING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Preparing subgrades

2. Drainage course for concrete slabs-on-grade.

3. Base course for concrete walks and pavements.

4. Base course [and subbase course] for asphalt paving.

5. Excavating and backfilling for utility trenches.

1.2 SUBMITTALS

A. Product Data.

B. Aggregate Sieve Analysis.

1.3 DEFINITIONS

A. Backfill: Soil material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Course placed between the subbase course, or subgrade, and concrete, or hot-mix asphalt paving.

C. Bedding Course: Course placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by FWS. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by FWS. Unauthorized excavation, as well as remedial work directed by FWS, shall be without additional compensation.

F. Fill: Soil materials used to raise existing grades.

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

G. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

H. Subbase Course: Course placed between the subgrade and base course for hot-mix asphalt pavement, or cement concrete.

I. Subgrade: Surface or elevation remaining after completing excavation, or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

J. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

K. Unified Soil Classification System:

1. GW: Well-graded gravels; gravel/sand mixtures with little or no fines.

2. GP: Poorly-graded gravels; gravel/sand mixtures with little or no fines.

3. GM: Silty gravels; poorly-graded gravel/sand/silt mixtures.

4. GC: Clayey gravels; poorly-graded gravel/sand/clay mixtures.

5. SW: Well-graded sands’ gravelly sands with little or no fines.

6. SP: Poorly-graded sands; gravelly sands with little or no fines.

7. SM: Silty sands; poorly, graded- sand/gravel/silt mixtures.

8. SC: Clayey sands; poorly-graded sand/gravel/clay mixtures.

9. ML: Inorganic silts; sandy, gravelly, or clayey silts.

10. CL: Lean clays; inorganic, gravelly, sandy, or silty, low to medium-plasticity clays.

11. OL: Organic, low-plasticity clays and silts.

12. MH: Inorganic, elastic silts; sandy, gravelly or clayey elastic silts

13. CH: Fat clays; high-plasticity, inorganic clays.

14. OH: Organic, medium to high-plasticity clays and silts

15. PT: Peat, humus, hydric soils with high organic content.

1.4 PROJECT CONDITIONS

A. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth moving operations.

B. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by COTR and then only after arranging to provide temporary utility services according to requirements indicated.

C. Site Information: Research public utility records and verify existing utility locations prior to ordering any material. Notify the COTR immediately if any discrepancies are found in the project survey.

D. See Geotechnical information included in the project drawings for additional information and requirements.

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487, or a combination of these groups; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

D. Subbase Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a ¾-inch sieve and not more than 5 percent passing a No. 200 sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 3-inch sieve and not more than 12 percent passing a No. 200 sieve.

G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25-mm) sieve and not more than 8 percent passing a No. 200.

H. Backfill and Fill:

1. Satisfactory soil materials

2. Initial trench backfill: Use WSDOT gravel backfill for pipe zone bedding.

I. Drainage Fill: Angular, granular material with a maximum particle size of 2 inches and shall meet WDOT Standard Specifications. The material shall be free of roots, organic material, and other unsuitable materials; have less than 2 percent passing the No. 200 sieve (washed analysis); and have at least two mechanically fractured faces.

2.2 ACCESSORIES

A. Detectable Warning Tape: Acid- and alkali-resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick, continuously inscribed with a description of the utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep; colored to comply with local practice or requirements of authorities having jurisdiction or as follows:

August 2019 FWS Lyons Ferry NFH Construction Documents Asphalt Paving Renovation Project

1. Red: electric.

2. Yellow: Gas, oil, steam, and dangerous materials.

3. Orange: telephone and other communications.

4. Blue: Water systems.

5. Green: Sewer systems.

B. Tracer Wire: 12 AWG minimum solid copper…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .