A04191_1.PDF
PDF 7 MB Posted
- Attached to
- TX-GAOA ATTWATER PRAIRIE CHICKEN NWR D/
- Solicitation number
- 140F0821R0010
About this file
This document outlines proposed facility improvements and maintenance needs at the Attwater Prairie Chicken National Wildlife Refuge. The scope of work includes replacing HVAC units, doors, air handlers, and reconfiguring interior spaces at the maintenance shop building. Additional projects involve adding concrete aprons, insulation, heating and air conditioning to portions of the equipment barn. The equipment shed scope includes installing concrete floors, enclosing bays with roll-up doors, and an extension to provide covered vehicle parking and fuel pump shelter.
The related federal contract opportunity is a solicitation from the U.S. Fish and Wildlife Service seeking design/build services for a new maintenance facility and administration building at the Attwater Prairie Chicken National Wildlife Refuge.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attwater Prairie Chicken NWR
Maintenance facility repairs and upgrades
Entrance road looking SE showing main intersection with public road, parking area, maintenance facility and service road.
Maintenance shop building (NW side)
Maintenance shop building (NE side)
Replace five HVAC units with three high efficiency units and relocate along NW side of building
Replace all exterior doors and door frames (SE corner of the Maintenance shop building shown here)
Replace five air handlers (propane) with three high efficiency electric units in the NW corner of the building
Install interior access doors to the current oil and pesticide storage rooms
Remove interior wall between SW bays and wood shop
Install two full-height roll up doors in SW corner bays
Install two full height roll-up doors in the SE corner bay (what is now the wood shop) to provide for pull-through access in West bays.
Remove old wash room and relocate pressure washer into SE corner of building
These two full-height roll up doors can be moved to the SW end of the building and replaced with shorter doors that are in those bays now.
Equipment storage barn
Add concrete apron around the equipment barn.
Refurbish “YCC” portion of equipment barn to include storage loft, insulate and add heat/air conditioning.
Add insulation, heat and air conditioning and a storage loft in YCC portion of the equipment barn
Add pesticide storage, eyewash station, outdoor wash rack with drainage containment and enclosed parking with power receptacles for three UTV’s to the east end of the equipment storage building
Equipment storage shed
Add concrete floors, enclose the East two bays and install roll-up doors in the equipment shed
Add an extension/addition to the equipment shed that provides enclosed parking for five FWS vehicles, covered parking for four farm implements and a shade covering for the fuel pumps
Add an extension/addition to the equipment shed that provides enclosed parking for five FWS vehicles, covered parking for four farm implements and a shade covering for the fuel pumps
(L to R) Maintenance shop, Equipment barn, Equipment shed, Fuel storage tanks
File details come from the government source that posted it. Updated .