A04 SOW HORSE PADDOCK FENCE.pdf
PDF 274 KB Posted
- Attached to
- PMIS 241662 LE PASTURE FENCE
- Solicitation number
- 140P3020Q0027
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P3020Q0027_Amd_0002.pdf | ||
| B03 UPDATED Wage Determination_0002.pdf | ||
| B09 AMEND 2 140P3020Q0027_0002.pdf | ||
| B08 Price Schedule Amend 2_0002.pdf | ||
| Sol_140P3020Q0027_Amd_0001.pdf | ||
| B08 Price Schedule Amend 1_0001.xlsx | XLSX spreadsheet | |
| B03 UPDATED VA20200162 7 10 2020.pdf | ||
| B11 Pre-proposal Site Visit Agenda 07 15 2020.pdf | ||
| A06 Horse Paddock Spec Sheet-3-24-2020.pdf | ||
| A06 vertical_face_board.jpg | JPG image | |
| B08 Price Schedule.pdf | ||
| Sol_140P3020Q0027.pdf | ||
| A06 Fence Map .jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 13
Replace Visitor Protection Pasture Horse Fencing Manassas National Battlefield Park
10606 Lee Highway, Manassas, VA 20109
PMIS No. 241662 PEPC Project ID: 71050 Compliance: Completed
March 3, 2020
STATEMENT OF WORK FOR
REPLACE VISITOR PROTECTION PASTURE HORSE FENCING
I. PURPOSE
The purpose of this project is to replace the horse paddock fence enclosing three large pastures, encompassing two small paddocks and a small corral area adjoining the park’s Visitor Protection Office. The fence has passed its normal use life and poses a hazard to the horses, employees, and park visitors. The existing fencing is coated, electric wire that is tightened at the fence corners with specialized tools and equipment. Small sections from an older, three-rail oak board fence are incorporated into the existing fence in different locations and are in poor condition. The existing fence posts have started to rot and break at the base. Poor visibility of the wire has caused numerous deer to crash into it, causing it to fail in large sections.
II. PROJECT OBJECTIVES
The project calls for the removal of the old fence and replacing it with a fence constructed of larger, 7-inch diameter posts and four (4)-rail oak boards on eight (8)-foot intervals between posts. Fill and tamp holes left by fence removal.
Once the fencing is installed, the top of the fence shall be strung with coated electric wire and one (1) electric box shall be installed to power the wire. The project includes the addition of a section of new fencing to divide one of the large pastures. Twelve, 12-foot gates will be replaced, with an additional one (1) 12-foot gate will be added for a total of thirteen (13) gates.
Since the new fence posts will be set 8 feet apart; not all of the old postholes can be re-used as existing posts are on 10-foot intervals.
The work shall be completed in two phases in order to provide for containment of the horses throughout the project. See the attached map for reference and clarification.
P a g e 2 | 13
III. PROJECT LOCATION
Visitor Protection Office 10606 Lee Highway Manassas, VA 20109
IV. SCOPE OF WORK
A. Remove all of the old fence and replace it with a fence constructed of larger, 7-inch diameter posts and four (4)-rail oak boards on eight (8)-foot intervals between posts.
The work includes the addition of a section of new fence that does not currently exist dividing one of the large pastures. Fill and tamp holes left by fence removal.
The work will be performed in phases. Phase One will consist of the demo and removal of the old fence and installation of the new fence in sections 1A and 1B and sections 4 and 5. During Phase One the horses will be kept in sections 2 and 3. The fence line separating sections 1B and 2 will be kept in place throughout Phase One.
Once Phase One is complete the horses will be moved into the newly constructed sections and Phase Two can begin.
Phase Two will consist of the demo and removal of the old fence and the installation of the new fence in sections 2 and 3.
B. Contractor shall furnish and install approximately 4,300 feet of four (4) boards per section, 5-foot-high oak paddock fence according to map location.
Contractor shall furnish and install (13) thirteen, 12-foot-wide, metal tube, green cattle gates. Gates will be same type and style as what is currently in place on existing fence. COR shall approve the gates prior to installation.
C. Gate posts and corner posts shall be driven in (not dug and tamped) to a depth of 48” below ground level. In line posts shall be driven in (not dug and tamped) to a depth of 36”, plumb with tops of gate posts level. All line post shall be set 8 foot on center, fencing boards shall be attached with a hardened spiral shank galvanized (coated) nail (16d or 3 1/2" long) three nails per end board. The bottom fence rail shall be installed at a height of 12” above the ground (measured from the bottom edge of the board).
The subsequent rails will be spaced 8” above the lower board. A 5-foot vertical board will be nailed to every line post. The vertical board will both cover the board cuts and add another set of nails to help secure the rails.
All gate posts and corner posts shall be 8” diameter full round pine post, pressure-treated with chromated copper arsenate (CCA) to a density of 0.4 lb/ft3 or higher. In line fence posts shall be 6”-7” diameter half round pine posts (or faced posts) pressure-treated with chromated copper arsenate (CCA) to a density of 0.4 lb/ft3 or higher. The tops of all in line post shall be cut at a 45-degree angle toward the outside of the fence (NO CAPS). Fence Boards shall be 1”x6”x16 foot rough sawed
P a g e 3 | 13 oak plank. Boards will be staggered wherever possible so that board ends are not in line with the boards immediately above or below.
Corner bracing will NOT be required for the corners/gate post areas.
Gates - 12 foot 18 gauge gates with six bars, green tube gates. Tubes, 1 5/8”. The two bars at the bottom of the gate will be spaced closer together than those at the top.
Gate hinges shall be designed to permit the gate to swing a full 180 degrees and support 18 gauge gates. Direction of swing will be appropriate for the location of the gate and approved by the COR. Adjust hinges and bracing, allowing gate to hang level and swing freely.
Gate latches shall be ½ inch galvanized metal with an 8” X 3/16” chain, and heavy 4” staple.
Fence mounting hardware shall be appropriate to fence wire. Hardware shall be approved by COR.
All fence boards shall be installed on the inside of the post, keeping a smooth surface against the horse (prevents them banging/hooking a shoulder on a post). This also makes the fence stronger as the board will not pop out when a horse leans or rubs hard on it.
If rocks are encountered during the installation of the posts the rocks will need to be excavated if possible and the posts subsequently embedded in concrete to the requisite depth outlined in the previous sections for the respective post types. If the rocks are not able to be removed, they may be broken apart in situ and the post sunk/secured in concrete.
All alternative materials or methods shall be approved by the COR and submitted in writing for approval.
D. The coated electric wire may be installed as each phase is completed or it may be installed after all of the new fence is complete. Contractor shall furnish and install approximately 4,300 foot of coated electrical wire along the top rail of the board fence, one (1) power box powered with battery backup of sufficient size and capacity to power the system with proper grounding system. Install one strand of electrified
12.5 gauge galvanized high tensile steel wire designed for use with horses. Wire casing shall have a brown colored polymer coating as specified in 2.2 D.
The wire should be Kencove Hotcote Fence Wire, or similar coated electrical wire, with heavy duty tension springs, stainless steel Hayes style wire tighteners and black, nail on claw insulators.
P a g e 4 | 13
The coated electric high-tension wire will be strung along the inside, top edge of the top rail of the wooden fence so as to provide a shock deterrent to the horses around the entire fence line, including interior fence sections.
On interior sections the wire will be strung on both sides of the top rail to provide shock deterrent to horses on either side of the fence. At all gates where the electric wire crosses, the wire will be buried to allow passage through the gates.
The wire will be encased in PVC type conduit and routed down the gate post to the ground. The conduit encased wire will be buried to a depth of 12-inches and span the opening of the gate to the next gate post where it will travel up the gate post to the top of the fence. Electrical work shall meet National Electric Code.
All wire will be strung and interconnected to create a single continuous loop able to be energized by a single power unit.
There shall be break in the wire line above the two water troughs for the safety of the horses.
A single, AC powered (no battery powered back-up), electric power box will be installed along with a proper grounding system (minimum of three interconnected 8-foot ground rods).
The fence charger shall be located near the currently in place solar charger near the tack room. The distance to the fence from this location will be less than 10 ft.
Gates shall not be electrified. Circuit shall run through conduit underground beneath gates.
Install adequate grounding material for each charger. Do not use the well, water pipe, or the power system ground as a ground rod. Do not use any metal rod which has a painted surface. Rods shall be driven a minimum of 6 to 8 feet deep into permanently moist earth.
Do not install fence ground rods within 50 feet of any utility ground system. Install first ground rod within 20 feet of charger. Use clamp to attach ground wire to ground rods. Follow manufacturer instructions for grounding installation. It is critical that the fence is properly grounded.
Grounding Rods – 3/8” to 5/8’ diameter, 6 to 8 foot long corrosion resistant metal rod such as galvanized steel.
E. Double sided yellow electric fence warning signs shall be placed on the fence in accordance with current regulations and standards. Signs shall be bilingual or trilingual and NOT display manufacture advertising.
F. Test and certify fence for appropriate voltage after installation of equipment.
P a g e 5 | 13
G. Contractor shall furnish all labor, supervision, tools, materials, equipment, transportation, and management necessary to perform design and installation services of the horse paddock fence as specified herein. Contractor shall contact Ms. Utility to clear area prior to start of work. The contractor shall be responsible for locating all private utilities via outside services (private utility marking company). The park will additionally assist in their identification and provide available pertinent plans/documents. The fence line must be swept with a magnet to ensure that all nails, screws and other metal objects from the fence are removed from the area.
H. The approximate locations of new or existing gates are shown on the map with crosses. One new gate will be installed in the fence line separating sections 1A and 1B. One gate will be relocated from its current location on the fence line separating sections 1B and 5 to a new location on the fence line separating sections 1A and 5.
All other existing gates will remain in their current locations. The COR will confirm the placement of all gates. Some of the existing gates may be retained by the park for later use. The COR will identify the gates that will be retained.
I. All measurements are approximate, the Contractor will be responsible for final measurements. The attached map shows the overall fenced area divided into numbered sections. Not all fence lines are highlighted on the map. The highlighted sections are for reference purposes only. All existing fence lines are to be replaced.
J. Housekeeping and Rubbish Removal:
1. Contractor is responsible for daily clean up, including removal of all trash, debris and construction materials on a daily basis, and restoring to preconstruction condition as work is completed.
2. Provide refuse containers for collecting construction waste and debris. Provide individually marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard, etc. Recycling is highly encouraged, but not mandatory.
3. Location of container(s) larger than one cubic yard shall be proposed by the Contractor for review by COR. Contractor shall propose location(s) for container(s) to COR. Containers shall not be delivered to site until the location(s) is approved by COR.
4. Do not use National Park Service containers for collection or disposal of waste and trash resulting from Work.
5. Unless otherwise specified, refuse becomes the property of the Contractor and shall be disposed of outside the Park. Remove all debris and hazardous materials daily from the project site and take to a legal dumping area authorized to receive
P a g e 6 | 13 such materials. All hazardous waste and materials shall be handled and disposed of in a proper and legal manner. Keep volatile wastes in covered containers.
6. No signs or advertisements shall be displayed on the construction site or within the park except with approval of the Contracting Officer.
V. CODES, REGULATIONS AND STANDARDS
All work and installation shall conform with the applicable codes and standards including:
NFPA 70 National Electric Code (2020).
NFPA 101 Life Safety code (2012 or latest version)
All work and material shall be in accordance American Society for Testing and Materials (ASTM) standards, and all other Federal, State and local codes and regulations that govern this type of work.
Fittings and accessories not specifically identified herein, but required for installation, shall conform to ASTM standards.
Electric fence controlling device shall meet the safety standards promulgated by the Underwriters Laboratories, Inc. in publication number UL69, dated August 31, 1977, entitled “Standard for Safety for Electric-Fence Controllers or shall display the approved label of and meet the safety standards promulgated by the International Commission for conformity Certification of Electrical Equipment in its publication number 5, Second Edition, April, 1979, titled “ Specification for Mains-Operated Electric Fence Controllers.
When compliance with two or more standards is specified, and they establish different or conflicting requirements for minimum quantity or quality levels, the most stringent requirements will be enforced. Refer requirements that are different and uncertainties to the Contracting Officer (CO) for a decision before proceeding with the work of the contract.
VI. DELIVERABLES AND SUBMISSIONS
Deliverables Schedule
SOW Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
New Fence and Gates Installed
Upon completion of the work
1 Physical installation on site at the Visitor Protection Office
COR
P a g e 7 | 13
Task TTP List and Report (Delineating all methods and materials) Section 5
To be submitted prior to the beginning of work on any task listed in section 5
1 Emailed in PDF or equivalent format
COR
Certifications and Qualifications Report
To be submitted prior to the beginning of work on the contract
1 Emailed in PDF or equivalent format
COR
Contractor Progress Reports (to include photographic documentation of the work and general status/inspection)
Weekly During the performance of all tasks
1 Emailed in PDF or equivalent format
COR
Requests for alternative methods and materials
As needed. To be submitted prior to the beginning of work on any task listed in section 5
1 Emailed in PDF or equivalent format
COR
Schedule To be submitted prior to the beginning of work on the contract
1 Emailed in PDF or equivalent format
COR
Schedule of Values To be submitted prior to the beginning of work on the contract
1 Emailed in PDF or equivalent format
COR
warranty documentation for equipment installed/repaired
To be submitted at the completion of the project work
1 Emailed in PDF or equivalent format
COR
VII. PERIOD OF PERFORMANCE
P a g e 8 | 13
All work to be performed under this purchase order shall be completed within a period of not to exceed six (6) months from the date of the Notice to Proceed.
Repair Schedule utilizing bar-chart format. Schedule shall graphically indicate a period for contractor submittals (noting long lead times), Notice to Proceed, all critical components of work, and projected dates for Substantial Completion and Final Inspection.
P a g e 9 | 13
VIII. QUALITY ASSURANCE PLAN
A. Submittals
1. A complete list of materials proposed to complete the work must be provided for approval prior to the issuance of the notice to proceed. Material information should be accompanied with the provided NPS submittal form. Submittals should include:
2. Post (including pressure treatment method), rail, gates, wire specifications along with material photos.
B. Performance Evaluation
1. Services performed under this contract shall be subject to inspection and approval by the COR. Careless performance will not be acceptable. Any deficiencies noted by the COR must be corrected within eight hours from the time of call back or the Contractor may be subject to a deduction in payment.
2. Contractor shall provide a mockup for COR approval of at least three sections of fence before subsequent posts are installed.
C. Contract Deduction for Non-Performance or Inadequate Performance
The Contracting Officer may deduct a specified amount on the contract for inadequate or non-performance based on an estimated cost or actual cost of park service or other methods of procuring the service.
D. Unsatisfactory Work
Any omitted or unsatisfactory work will be deducted at the rate based on an estimated cost or other methods of procuring the service.
IX. REPORTS
1. The contractor shall maintain a daily work log recording the quantities of work performed and the locations. If requested a copy shall be filled with the COR on a daily or weekly basis.
2. The contractor shall note and report to the COR in writing the presence of any conditions that need to be addressed and cannot be corrected within the scope of work described herein. If so directed by the COR the contractor shall provide a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, and equipment required to perform the task(s).
The COR will evaluate the proposal and if valid will seek approval from the Contracting Officer. Failure of the contractor to obtain the approval of the
P a g e 10 | 13
Contracting Officer for work beyond the scope of the contract will release the government from any obligation to pay for services claimed.
X. SAFETY AND SECURITY
A. Notify and coordinate all pre-award and post-award site visits with the Contracting
Officer’s Representative (COR) a minimum of 72 hours in advance, so that park staff can facilitate access to the site and structures.
B. Means and methods of assessment shall be the responsibility of the contractor and may include, but not limited to, historical research, visual observations, photo documentation, limited non-destructive dismantling of assembled building elements, mechanical, electrical and material testing. Destructive testing methods shall not be employed without the expressed consent of the park POC and the COR. The contractor call be responsible for properly and efficiently coordinating all work, and shall arrange and pay for testing, investigation aids and equipment to facilitate execution of the work.
C. The contractor shall be responsible for providing aids, materials, and equipment to facilitate execution of the work: shovels, hammers, pole diggers, etc. Contractor shall be responsible for securing all materials, tools, and equipment during the project. The park is not responsible for any stolen material, tools, and equipment during the duration of this project. Contractor must also provide barriers to prevent public and park staff entry into the area while work is being performed or any equipment is in place. All barricading shall be approved in writing by the COR 72 hours prior to installation.
D. The contractor shall abide by all OSHA safety standards and regulations in the performance of this work. Supplying and wear of Personal Protective Equipment (PPE) is the sole responsibility of the contractor and shall abide by NPS rules and regulations. Any discovery made during the execution of the work that has the potential of creating a life safety issue either to the public, park staff or any employee of the contractor shall be brought to the attention of the COR immediately and follow up in writing.
E. The contractor shall abide by all laws, regulations, and policies regarding governing the NPS. The contractor shall follow and adhere to directions within the Statement of Work of the COR. The contractor shall ensure the highest degree of protection to all park resources, employees, and visitors.
XI. ARCHEOLOGICAL PROTECTION
A. Reference: DOI Clause: 1489.236-73 – Archeological Findings
1. Archeological Discovery: In the event that unanticipated archeological resources are uncovered during construction operations, the contractor will suspend
P a g e 11 | 13 operations at the discovery site, notify the Contracting Officer, who shall contact the Regional Archeologist or his representative, and continue operations in other areas, until such time as the National Park Service has completed its compliance responsibilities under Section 106 of the 1966 National Historic Preservation Act, as amended.
2. Unanticipated Discovery of Human Remains (Anthropic Discovery): Should any human remains be encountered; excavations will stop, and the Contracting Officer will be notified immediately. DO NOT TOUCH, LEAVE THE REMAINS IN PLACE. The Contracting Officer, in consultation with the Regional Archeologist or his representative, and the Park Superintendent shall determine the appropriate course of action, following the Department of the Interior’s guidelines on the treatment of human remains and appropriate Federal legislation.
XII. QUALITY CONTROL, REVIEWS AND PAYMENT
A. The contractor shall be responsible for the review and coordination of their work, their contractor’s work and other consultants that will be involved in this project. Any corrections shall be made prior to payment submittal to the NPS. The contractor shall preform a Quality Control Review in conjunction with the COR and provide a completed copy of a Quality Control Checklist signed by the COR with each payment submittal.
B. The contractor’s quality control efforts shall ensure that all work meets all health, safety and environmental codes. Contractor shall also meet state and federal building codes. All parts or materials used should meet manufacturers specifications on installed units.
C. IPP. The vendor is required to submit payment invoices and supporting documentation electronically through the Invoice Processing Platform System (IPP) which is accessible at http://www.ipp.gov. Detailed instructions on how to enroll and use the system are provided on the web page.
D. The Government will make payments to the vendor by electronic fund transfer (EFT) no later than thirty (30) business days after receipt of an acceptable invoice and confirmation that all items and associated installation has been inspected and authorized by the Contracting Officer or his or her duty authorized representative. An acceptable invoice contains the following information:
1. Contract/purchase order number
2. Company name and address which order was placed
3. Date invoice was prepared and sent, description, quantity, unit of measure, and unit price for each -Line item(s) in the order http://www.ipp.gov/
P a g e 12 | 13
4. Total extended price of the order
5. Shipping and payment terms
6. Quality Control Checklist signed by COR
E. Contractor waives all claims for additional expenses or damage to the contractor’s equipment that may be incurred during the project, unless contractor can provide written documentation to the COR for any unforeseen circumstances that may occur.
Rock and concrete are NOT unforeseen site conditions.
F. After completion of the work and as prerequisite to the final payment, the contractor shall furnish the contracting officer a release of claims. Such claims as are asserted by the contractor and excepted from operation of the release shall be listed in the spaces provided after the “except” and shall be reference to correspondences or other identifying data, together with monetary amount for each major claim item.
XIII. CONFIDENTIALITY AND GOVERNMENT OWNERSHIP
A. Confidentiality: All data, information and deliverables provided to the contractor under this contract and/ or developed by the contractor under this statement of work are the property of the U.S. Government and shall be kept in strict confidence.
B. Government Ownership: All notes, reports, sketches, photographs, drawings, specifications, cost proposals/estimates calculations and other documents produced as a result of this contract shall be and remain the sole property of the Government and may be used on any other work at no additional compensation to the contractor. The contractor may retain copies of all such materials.
XIV. EVALUATION FACTORS FOR AWARD:
FAR 52.212-2 Evaluation – Commercial Items (OCT 2014)
(a) The government will make an award from this solicitation to the offeror who proposes the Lowest Price
(b) The Offeror’s price proposal will be evaluated for reasonableness in comparison to other Offeror’s proposals and shall be evaluated against current fair market prices.
XV. NPS CONTACTS
A. Contracting Officer:
Stacey Rickard National Park Service, National Capital Area 1100 Ohio Drive, SW, Washington D.C 20242
(202) 692-6058
P a g e 13 | 13
Stacey_rickard@nps.gov
B. The Park Point of Contact (POC) for this project is:
Kenneth Soutter Facility Manager 6750 Sudley Road Manassas, VA 20109
(703) 361-7996, Ext 50 kenneth_soutter@nps.gov
C. The park’s COR for this project is:
Andrew Bentley Cultural Resources Specialist 12521 Lee Highway Manassas, VA 20109
(571) 465-7662 andrew_j_bentley@nps.gov mailto:kenneth_soutter@nps.gov