This statement of work outlines requirements for a wastewater and water line replacement project at Balsam Mountain Campground and Heintooga Picnic Area in Great Smoky Mountains National Park. The scope of work includes replacing approximately 10,640 linear feet of water lines and wastewater collection lines with new high-density polyethylene piping, as well as repairs to septic tanks, drainage improvements, and site restoration. The contractor must follow all applicable state and federal regulations and permit requirements, and work may commence after October 10, 2023, provided all work is complete by May 3, 2024 to accommodate seasonal closures. The contractor must submit qualifications, safety plans, and a quality control plan with their proposal in response to solicitation number 140P5323R0015 issued by the National Park Service Southeast Region for this rehabilitation project at Great Smoky Mountains National Park.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Wastewater/Water Line Replacement Project Balsam Mountain Campground/Heintooga Picnic

Area Swain County, NC Great Smoky Mountains National Park

3/28/23

1. General Information The Great Smoky Mountains National Park (GRSM) is located in Tennessee and North Carolina and consists of nearly 521,000 acres. The park was established by Congress on June 15, 1934.

The Park’s mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 9 million visitors annually.

2. Facility Background Balsam Mountain Campground and the Heintooga Picnic Area are located in a relatively remote part of GRSM in North Carolina. Balsam Mountain Campground is located close to the end of Heintooga Ridge Road on Balsam Mountain at 5,310 feet elevation. Heintooga Picnic Area is located at the end of Heintooga Ridge Road. Heintooga Ridge Road intersects the Blue Ridge Parkway just northwest of the intersection of the Blue Ridge Parkway and Highway 19. Due to the high elevation, both sites are closed in the winter months.

Balsam Mountain Campground offers approximately 43 small campsites with wood-framed, gravel pads for pitching tents, fire rings, and picnic tables. The campground includes a dish washing station and restrooms with flush toilets and drinking water. There are no hookups or showers at the campground and no electricity is available in the restrooms or campsites. There is also a Ranger Station structure at the entrance to the campground. Heintooga Picnic Area has 41 picnic sites, each with a table and charcoal grill. The picnic area also has restrooms with running water, but no electricity or pavilions.

EXISTING WATER SYSTEM

The existing water system consists of a well, a pump house, a 30,000-gallon water storage tank and a water system consisting of approximately 2,740 linear feet of 4-inch PVC, and 7,900 lf of 2-inch waterline. These lines have reached the end of their service life and need to be replaced.

The water storage tank is the original in-ground concrete water storage tank built back in 1960. .

EXISTING WASTEWATER SYSTEM

There are two comfort stations at the Balsam Mountain Campground and two comfort stations at the Heintooga Picnic Area. The campground has a sewer collection system that drains several hundred feet through the woods to a 5,000-gallon septic tank. The septic tank in turn, drains to a dosing tank which alternately discharge to two separate sand filters. The effluent disperses underground with no discharge. The Heintooga Picnic area has a sewer collection system from each comfort station that drains to a single 3,000-gallon septic tank located between the two comfort stations, deep in the woods. The system has a drain field that works fine, but since the septic tank is so far in the woods, it is very difficult to pump it out on a regular basis.

3. Scope of Proposed Work The scope of work for each system is as follows:

WATER SYSTEM IMPROVEMENTS

1. Waterlines The scope of work includes replacing the existing 2-inch waterline to the Heintooga Picnic Area; and the 4-inch PVC waterline to the Balsam Mountain Campground with new High- Density Polyethylene (HDPE) waterlines. The 2-inch water services to the existing Comfort Stations will also be replaced with 2-inch HDPE waterlines. The service lines will be installed up to the existing valve boxes outside of the Comfort Stations. The valve and box for the Comfort Stations will also be replaced as part of this work. The 3/4-inch service lines from the main to the original drinking fountains are also included in the scope of work. The service lines to the Ranger Station will be completely replaced all the way to the building, including all pipe, valves and valve boxes.

It is preferable, but not required that the existing waterlines be replaced by using the pipe-bursting method. Open-cut method of installation is also acceptable. see attachment #2: under WASTEWATER SYSTEM IMPROVEMENTS Optional Item:8 Open Cut Trenching. A decision will be made based on available of funds.

Open-cut method involves trenching of the overlying grade to the depth required to install new waterlines.

WASTEWATER SYSTEM IMPROVEMENTS

1. Balsam Mountain Campground Wastewater Collection System It is proposed to pipe burst the existing 6-inch wastewater collection system; and replace it with new 8” HDPE sewer lines. The existing manholes will be replaced where noted on the plans.

2. Septic and Dosing Tanks In addition to the pipe replacement, the septic tank and dosing tank will be serviced and partially refurbished. New access castings and dosing pumps are to be provided.

3. Grading and Drainage Improvements There is a drainage channel located above the eastern sand filter that is to direct stormwater runoff around the sand filter, which has been breached. The drainage channel and the area above it needs to be re-graded to divert stormwater around the filter.

4. Contractor Responsibilities Contractor Shall Provide the Following Materials and Services:

(All materials and installations shall be in accordance with the North Carolina Department of Environment and Conservation standards and specifications)

WATER SYSTEM IMPROVEMENTS

4-INCH HIGH DENSITY POLYETHYLENE WATERLINE:

The proposed 4-inch waterlines are to be installed in the same trench or in the same general area as the existing lines wherever possible. It is preferred, but not required that the lines be replaced through “pipe-bursting”; and will be a factor in bid selection. The existing 4-inch waterlines are to be removed and disposed of off-site at the contractor’s expense (only as necessary when it is in the way of the new line).

2-INCH HIGH DENSITY POLYETHYLENE WATERLINE:

The proposed 2-inch waterlines are to be installed in the same trench or in the same general area as the existing lines wherever possible, or in the location as shown on the plans where the waterline follows a different route than the existing line. It is preferred, but not required that the lines be replaced through “pipe-bursting; and will be a factor in bid selection. 2-inch waterlines and valves will also be installed to each of the comfort stations.

3/4-INCH HIGH DENSITY POLYETHYLENE WATER SERVICE:

The water service lines to the existing drinking fountains are to be replaced as part of the work.

VALVES, AND FITTINGS:

All valves and fittings shall be provided and installed as noted on the plans and specifications.

PRESSURE TEST AND DISINFECTION:

All installed pipes, valves and fittings shall be pressure tested and disinfected in accordance with the plans and specifications.

AREA RESTORATION:

All areas disturbed by the contractor shall be restored to original condition. Any pavement areas which must be crossed will be removed and replaced to original conditions in accordance with the plans and specifications. Areas outside of paved areas shall be graded, seeded with the approved Park seed mix, and mulched with approved matting. Areas outside of the immediate work area shall not be disturbed.

WASTEWATER SYSTEM IMPROVEMENTS

WASTEWATER COLLECTION LINE REPLACEMENT:

The wastewater collection lines at the Balsam Mountain Campground are to be “pipe-burst” and replaced with new 8-inch HDPE collection lines. Manholes shall also be replaced where noted.

SEPTIC AND DOSING TANK:

The existing septic tank and dosing tank shall be partially refurbished. New castings shall be provided for each, and new dosing pumps are to be provided in the dosing tank.

DRAINAGE CHANNEL REGRADING/RESTORATION:

The area damaged by stormwater runoff, as noted above, shall be stabilized, and the cut-off swale around the sand filter shall be restored to re-route stormwater around the sand filter.

AREA RESTORATION:

All areas disturbed by the contractor shall be restored to original condition. Any pavement areas which must be crossed will be removed and replaced to original conditions in accordance with the plans and specifications. Areas outside of paved areas shall be graded, seeded with the approved Park seed mix, and mulched with approved matting. Areas outside of the immediate work area shall not be disturbed.

The Campground will be closed during the proposed work, and the existing waterlines will be taken out of service; therefore, maintenance of water and sewer service will not be required during the course of the work.

5. Government Furnished Property, Materials & Supplies The GSMNP will not be providing property, materials or supplies for the subject project.

6. Business Hours The contractor shall typically complete on-site work or delivery, including unloading, during normal business hours of 7:30 am to 4:30 pm, Monday through Thursday, excluding weekends and Federal holidays. However, upon coordination with the COR, the contractor may work earlier or later as required. The contractor may also work weekends if necessary, upon coordination with the COR. The contractor shall coordinate the specific on-site work schedule with the Contracting Officer and COR five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours.

7. Management During Normal Working Hours The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure safety of the public and on-time completion of this contract.

8. Maintenance of Traffic The Campground will be closed during the course of the proposed work; therefore, traffic control is expected to be minimal during the course of the work in this area. The Heintooga Picnic Area will be open and occupied; therefore, the contractor will need to provide traffic control in this area as necessary. The contractor shall follow the Manual of Uniform Traffic Control Devices (MUTCD) for any traffic control that might be required. The Contractor shall use appropriate traffic control devices needed for all work and for protecting workers and visitors. One lane closures are allowed, traffic shall be controlled with flaggers and appropriate signage.

Contractor shall provide advance notice if the closure is expected to exceed 10 minutes.

9. Safety & Environmental Compliance

The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety, laws.

The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

Contractor shall comply with the requirements of FAR 52.236-7 Permits and responsibilities.

Installed waterlines and sewer lines must pass both a pressure test and/or disinfection test per the project specifications, as applicable.

The GRSM safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.

The contractor shall immediately report to the Contracting Officer, COR and GRSM safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.

10. Insurance The Contractor shall be insured in accordance with the Solicitation documents. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

11. Motor Vehicle & Traffic Regulations Contractor employees operating motor vehicles shall possess an appropriate, valid, driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits. Commercial vehicles are prohibited on the Blue Ridge Parkway without prior notification of the Park. Contractor shall contact the Dispatch Office at 865-436-1294 to notify the Park of an incoming commercial vehicle.

12. Statement of Work - Requirements Summary The contractor shall install all proposed waterlines and appurtenances in strict conformance with the requirements outlined in the North Carolina Department of Environmental Quality “Rules Governing Public Water Systems”, Section .0100 – Protection of Public Water Supplies, Subchapter 18C – Water Supplies.

The contractor shall install all proposed wastewater systems and appurtenances in strict conformance with the requirements of the Swain County Health Department, Environmental Health.

13. Maintenance of Roadways

Contractor shall show due diligence to ensure that asphalt on roadways and developed parking areas are protected from damage.

14. Gates (N/A) Contractor shall be responsible for ensuring gates are locked at the end of each shift.

1. Contractor shall provide a lock to be used on a joint locking system serving both the Park and the Contractor.

2. Gates shall be closed during the day and at the end of each day.

15. Employee Parking All contractor employees shall comply with parking procedures published for the GRSM.

16. Replacement of Contractor Employee for Security Reasons The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.

17. Non-Payment for Additional Work Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor.

Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

18. Conflict of Interest The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

19. Quality Control The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Statement of Work - Requirements Summary (Section 12) provides requirements for the installation of waterlines, wastewater lines, and appurtenances that are the minimum requirements for the installation of the new water and wastewater systems. The contractor’s QCP shall address methods for remedying any non-compliant work. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:

Required services identified in the “Statement of Work - Requirements Summary” Contractor’s surveillance methodology Method and timeframe for responding to COR or customer complaints Progress meetings with Government stakeholders

20. Contractor’s Proposal Package The following deliverables are to be submitted with offer in response to RFQ.

Technical approach to perform required services.

Identification of key personnel to be responsible for the on-site work and their qualifications.

Contractor safety plan.

Contractor’s QCP Proof of Insurance–Business Liability & Workers Compensation.

21. Inspection.

The Government will conduct inspections during and upon completion of required services.

Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

22. Schedule Contractor may commence work at Notice to Proceed. The Balsam Mountain Campground and the Heintooga Picnic Area are closed from October 10, 2023 to May 10, 2024. Proposed work in the campground shall commence after October 10, 2023, and all proposed work in the Campground and Picnic Area shall be complete by May 3, 2024. Proposed work may be able to start earlier depending upon potential early closures of either facility – this will be coordinated following award, but for bid purposes, the dates above shall be used. The contractor shall provide a realistic schedule for the completion of the proposed work; and notify the Park if there is not sufficient time in the schedule prior to accepting the contract.

23. Liquidated Damages (NA)

24. Referenced Documents The Design Plans and Specifications for the “Balsam Mountain Campground/Heintooga Picnic Area - Sewer and Water System Replacement Project”.

25. Base Price Schedule See attachment.

26. Location Map See attachment