B09_Site_Visit_clairifcations_0001.pdf
PDF 19 KB Posted
- Attached to
- Great Smoky Mountain NP WASTEWATER System
- Solicitation number
- 140P5323R0015
About this file
This document provides clarifications to solicitation number 140P5323R0015 for a water and wastewater line replacement project at Balsam Mountain Campground and Heintooga Picnic Area in Great Smoky Mountains National Park. The scope of work has been revised to clarify that the contractor is not responsible for obtaining NOC and NOT permits. A stormwater pollution prevention plan narrative prepared by the park has been incorporated into the contract. The scope of work has also been revised to specify the existing asphalt swale along Heintooga Ridge Road. The related federal contract opportunity is for rehabilitation of the Balsam/Heintooga wastewater system in Great Smoky Mountains National Park, issued by the National Park Service Southeast Region under solicitation number 140P5323R0015.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140P5323R0015 -Water and Wastewater Line Replacement Project, Balsam Mountain
Campground/Heintooga Picnic Area
Site Visit Notes:
The scope of work has been revised to clarify the Contractor is not responsible for providing
NOC and/or NOT permits.
A StormwaterPollution Prevention Plan Narrative {SWPPP Narrative) had been prepared by the
Park and is being incorporated into the contract.
North Carolina Department of Environmental Quality Letter of Approval has been included as a reference.
The scope of work has been revised to provide a clarification to the plans and call out the existing asphalt swale along the edge of Heintooga Ridge Road.