This is a Scope of Work (SOW) document for cyclic tree work at Kings Mountain National Military Park in Blacksburg, South Carolina, to be completed in April 2025. The project involves removing 144 standing or partially standing trees and pruning 32 trees to promote health, mitigate hazards, and improve site aesthetics along roadsides, trail corridors, landscapes, and near National Park Service (NPS) facilities. The contract is firm, fixed-price with a 9-calendar month performance period.
Key requirements include adherence to industry standards like ANSI Z133, compliance with wildlife protection regulations (particularly for tri-colored bats), and strict safety protocols. The contractor must be an ISA-certified arborist with at least 5 years of tree care experience, provide comprehensive documentation and safety plans, and follow detailed guidelines for tree removal, pruning, debris disposal, and environmental protection. Work is limited during bat pupping season (May 1-July 15) and winter torpor period (Dec 15-March 31), with exceptions for safety hazards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5125Q0021_Amd_0001.pdf | ||
| Questions_and_Answers_KIMO_HTR_0001.pdf | ||
| B03_Attachment_0004_WDOL_Wage_Determination_140P5125Q0026pdf.pdf | ||
| B08_Attachment_0007_Site_Visit_Information_140P5125Q0021.pdf | ||
| A06_Attachment__0002_MAP_44016565.pdf | ||
| B08_Attachment_0006_Past_Performance_Questionnaire_140P5125Q0021.pdf | ||
| B08_Attach_0005_Price_Schedule_140P5125Q0021.xls | XLS spreadsheet | |
| A06_Attachment_0003_Tree_List_44016565.xlsx | XLSX spreadsheet | |
| Sol_140P5125Q0021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 2025, KIMO 331195B Cyclic Tree Work
NATIONAL PARK SERVICE
KINGS MOUNTAIN NATIONAL MILITARY PARK
FY25 CYCLIC TREE WORK
SCOPE OF WORK
Background:
The National Park Service (NPS) owns and operates Kings Mountain National Military Park located at 2625 Park Rd, Blacksburg, SC, within Cherokee and York Counties. The park was established to commemorate the October 7th, 1780 patriot victory at King’s Mountain in the Southern Campaign of the American Revolution.
This project will mitigate hazardous conditions, preserve the cultural/historic landscape, and improve site aesthetics through pruning and removing trees and woody vegetation along roadsides, within trail corridors, in landscapes, and near NPS owned facilities. This is a firm, fixed price contract, with all work to be complete within 9 calendar months after the notice to proceed is issued.
Project Description:
• Remove 144 (one hundred forty four) standing (or partially standing) trees.
• Prune 32 (thirty two) trees to promote overall health, vigor, and mitigate hazards.
1 General Specifications/Requirements
1.1. The requirements set forth are intended to provide general guidelines for the services that shall be provided by the Contractor.
1.2. All work performed by the contractor shall be performed in accordance with all applicable laws, regulations, instructions, and commercial practices accepted by the
International Society of Arboriculture and Tree Care Industry Association.
1.3. The work to be performed under this contract consists of providing all materials, labor, equipment, tools, and services necessary to perform prescribed tree care and arboriculture services and all related incidental work in accordance with the bid schedule and specifications herein. Therefore, any items not specifically noted but necessary for performance in accordance with accepted industry standards shall be furnished under this contract.
1.4. Contractor is responsible for researching and obtaining any and all required permits that apply for scope of work.
1.5. Contractor is responsible for ensuring that appropriate company and personnel certifications required for performing the work associated with this contract are in place.
1.6. Contractor shall properly dispose of all refuse materials generated through performance of work.
1.6.1. On the same day pruning or removal occurs the contractor shall remove all wood, debris and chips from the site unless otherwise stated for the specific work area.
Removal and disposal of debris generated through performance of work shall be the responsibility of the contractor. There shall be no sale of wood or materials on government property.
1.7. Worksite, and staging area shall be maintained in a tidy manner. Contractor shall confine his work, the storage of materials and equipment, the parking of vehicles, and all other operations in connection with this contract to the areas approved by the COR while on NPS grounds.
1.8. Contractor shall schedule work so that roads, parking lots, and public areas are open for public use at all times during the performance of work unless closure is approved and scheduled with the park. Rolling (moving) traffic closures, and lane closures may only be implemented with the written permission of park superintendent.
1.9. Only changes as approved in writing by the CO shall be deemed authorized. Any other form of changes performed under this contract that are unauthorized shall be the burden of the Contractor and shall be at no cost to the Government.
1.10. Work shall not disturb wildlife or wildlife nests. If nests or wildlife are discovered within the work area the contractor shall notify the COR who will initiate consultation with the park resource management specialist.
1.11. The Contractor shall take all reasonable precautions to avoid damaging surrounding vegetation or lawn areas and prevent gouging and erosion of soils as a result of contractor operations (ex. Protection of lawn areas through blanketing fall area with brush or logs to cushion the fall when pruning large limbs that may dig in).
2. Technical Requirements
2.1. Tree, Woody Plant, and Debris Removal
2.1.1. Tree and woody plant removal shall be performed in accordance with the
American National Standard for Arboricultural Operations - Pruning, Repairing, Maintaining and Removing Trees and Cutting Brush - Safety Requirements - ANSI
Z133. Vendor shall follow the most up-to-date version of ANSI Z133.
2.1.2. All debris generated during the performance of work shall be removed from the worksite within landscaped areas, within the battlefield core, within 15 feet of the tread of trail, and 15 feet from outer edge or curb of roadway.
2.1.2.1. The park will provide a storage location of approximately 2000 square feet where the contractor may relocate logs and sections of fallen trees measuring
6”dbh to 24”dbh that are suitable for converting to firewood. The contractor shall cut all logs placed in the storage location into sections measuring 18” to
4’ in length. The logs must be placed in the storage location a tidy manner conducive to safe access to the logs. Stacks of logs in the storage location must be less than 5’ in height.
2.1.2.1.1. The contractor shall dispose of all other logs and sections of fallen trees which do not meet this criteria off site.
2.1.2.2. Debris generated during the performance of work within wooded areas
(15’ into the wooded area from the delineated edge of the woodline or forest edge), may be cut into smaller sections and distributed on the forest floor in a single layer or chipped.
2.1.2.2.1. Stacking and piling debris within wooded areas is not permitted.
Debris may not be stacked or piled against other trees, boulders, or constructed features or over stands of herbaceous vegetation. The contractor shall dispose of debris off site when distribution is not feasible.
2.1.2.2.2. The contractor shall evenly disperse chips into the wooded area, ensuring they are placed at a depth of no more than 2”, or dispose of chips off site.
2.1.3. Standing trees scheduled for removal and within forested areas may be cut to a
“snag” at a height that will not impact the roadway (typically 15’ to 20’ in height), ensuring the snag will not fall outside of clearzone, or reach the curb edge, tread of the trail, or the area within 5 feet of the tread of the trail, if the snag were to fall.
2.1.3.1. Snagging is the process of leaving the standing trunk of a tree in place when and where the top portions may be safely removed. The result is an appearance similar to a freestanding pole.
2.1.3.2. The height of the snag must be lower than the horizontal distance between the snag and target areas (i.e. roadways, structures, trails, landscape areas). For example, if the base of a tree that is scheduled to be removed is inside of the wooded area at a distance measuring 25’ from the mowed edge of the landscape which delineates the tree line, the tree may be snagged at a height of
20’.
2.1.4. All resulting stumps that are not identified for stump grinding shall be cut to no more than 18” (eighteen inches) in height.
2.2. Tree Pruning
2.2.1. Tree and Woody Plant pruning shall be performed in accordance with the
American National Standard for Tree Care Operations - Tree, Shrub, and Other
Woody Plant Maintenance - Standard Practices, ANSI A300 (Part 1) - 2017
Pruning.
2.2.2. No more than one-fourth (1/4) of the foliage on a mature tree shall be removed during a pruning operation. The COR shall be contacted prior to pruning any tree specified as pruning if said pruning will reduce the surface area of the tree by more than one-fourth.
2.2.3. Branches shall be removed in a manner that prevents peeling and does not cause damage to other parts of the tree. To prevent tree or property damage, branches or portions of branches shall be lowered to the ground by ropes or equipment when necessary with protection of the remaining tree taken into consideration to avoid damaging live tissues. Extra care must be taken to prevent damage to roads, shoulders, and paved services when dropping limbs.
2.2.4. When removing a lateral branch at its point of origin on the trunk or parent limb, the final cut shall be made in branch tissue sufficiently close to the trunk or parent limb starting just above a vigorous bud or shoot and running back across the limb at a 45 degree angle, without cutting into the bark branch ridge or branch collar or leaving a protruding stub. When removing a branch with a narrow branch attachment, the final cut should be made from the bottom of the branch up. Where branches cross and rub together or form a narrow branch union, one branch shall be removed with consideration of the tree's natural growth habit.
2.2.5. When removing a leader or branch section, the angle of the cut should bisect the angle between the branch bark ridge and an imaginary line perpendicular to the leader being removed. Trees with codominant stems/branches shall be selectively pruned to promote a single dominant leader by subordinating the other codominant stems. Selection of the dominant leader shall be made with consideration of the tree's natural form and structure.
2.2.6. When removing a branch, the final cut shall be made just outside the collar of live tissue. If the collar has grown out along the branch stub, only the dead stub should be removed. The live collar shall remain intact and uninjured. Removing entire or large portions of healthy, sound limbs simply because the contractor chooses not to provide the necessary equipment or labor to remove only the dead or dying terminals of said limb is prohibited.
2.2.7. Climbing spurs shall not be worn under any circumstance when a tree will remain in the landscape after the operation.
2.2.8. Climbing spurs are only authorized during tree removal.
2.2.9. Contractor shall remove all visible hazards with potential for damage to property or personal injury. Removal shall include, but is not limited to: dead wood three (3) inches in diameter or greater, heavy or weak horizontal branches, and weak branch unions.
2.2.10. All cuts shall be made without cutting into the branch collar and without leaving a protruding branch stub;
2.2.11. Clean cuts shall be made at all times;
2.2.12. All branches that are too heavy to handle shall be precut to prevent splitting;
2.2.13. The Contractor shall address incidental or minor pruning issues as appropriate and/or necessary to remove any damaged, unhealthy, or unsafe branches;
3. Scheduling and Hours of Work
3.1. The determination of the total daily productive man hour requirements, and total quantity of materials for the performance of all work specified herein is the sole responsibility of the bidder.
3.2. All work shall be performed between the hours of 7:30am and 5:00pm during the normal
5 day workweek, Monday through Friday; work on Federal holidays is excluded, unless specifically approved in advance.
3.3. Scheduling of all work must be approved in writing by the COR.
3.4. Removal of trees that are not identified as a safety hazard should not occur during the bat pupping season (May 1 to July 15), the winter torpor period (Dec 15 to March 31) and when temperatures are 40°F or below. See Natural Resource and Wildlife
Protections section below for more information.
3.5. Requests for shutdown of utilities, buildings, park grounds, and roads shall be made in writing to the COR at least 14 calendar days in advance, in order to minimize disruption to public use and traffic patterns.
3.6. The Contractor will follow the Federal Government Work Schedule policy by the Office of Personnel Management (OPM) for determination of closures or delays to the contract work schedule (i.e., government closed on a federal holiday, the personnel will not report).
3.7. All work outside of the designated performance hours are required to be requested seven
(7) business days in advance, in written form, by the Contractor to the Contracting
Officer’s Representative (COR) for approval
4. Supplies, Equipment, and Services
4.1. The Contractor shall furnish all supplies, materials, equipment, and ancillary services necessary for the performance of the work of this contract.
4.2. All equipment shall meet Federal, OSHA, State, and local safety requirements, including proper licensing. This includes equipment such as cranes, bucket trucks, aerial lifts, chipper trucks, log trucks, stump grinders, chippers, skid-steer tractor, etc.
4.3. Contractor must field verify all quantities and dimensions affecting the work of this contract, and must field verify all new and existing dimensions affecting the work of this contract.
4.4. Contractor shall not use any materials which the COR determines would be unsuitable for the scope of work or harmful to any part of the landscape, roadway, park resources, equipment, or persons.
4.5. The contractor is responsible for the procurement, scheduling and management
(schedule, procure, supply, payment, etc) of temporary traffic control (TTC) measures necessary for performance of work associated with this contracting. This includes rolling closures, flagging, and/or lane closures.
4.5.1. All road closures, lane closures, roadside operations, shall comply with the latest version of the Manual on Uniform Traffic Control Devices (MUTCD). Standards and detail drawings may be pulled from publicly available FHWA, EFLHD, and
MUTCD resources.
4.6. The Contractor shall locate utilities in the field prior to engaging work that could damage utilities by contacting a private utility marking company forty eight (48) hours in advance of work. Utility marking company must mark the area prior to any digging.
4.6.1. Work involving excavations shall not commence until the COR has confirmed site inspection and clearance by park archeologist.
4.6.2. Contractor will be held liable for any damages to utilities resulting from performance of work and will be responsible for the protection of existing utilities and related structures.
5. Contractor Qualifications
5.1. Contractor shall possess the necessary knowledge, skills, abilities and resources to perform the work herein and within the "best industry" standards and practices. The contractor shall be responsible for professional quality, technical accuracy, project coordination, material installation, disposal of existing materials, and all other items required to deliver and handover a complete project to the NPS upon completion of work.
5.2. Contractor represents familiarity with the scope and nature of the work required by the
NPS, and understands the conditions under which it will be obligated to operate.
5.3. A minimum of five (5) years prior experience in the business of tree care is required.
5.4. All work performed shall be under the direction and general supervision of an
Arborist(s) certified by the International Society of Arboriculture (ISA) who possesses verifiable experience as a full-time direct supervisor of tree maintenance and climbing work crews and technical competence in tree physiology, identification, diagnosis of disorders, and current tree care and safety practices in accordance with accepted industry standards.
5.5. The Certified Arborist shall be on the job site daily and shall be the primary contact with the Government's technical representative responsible for controlling the quality of work and inspecting all completed work to ensure that contract performance requirements are met.
5.6. The Arborist assigned to this contract shall be a full time employee of the Contractor.
Independent consultants retained by the Contractor do not meet the criterion of “full time employee’.
5.7. All workers shall, through related training and on the job experience, be familiar with the technical aspects and hazards of tree maintenance work and equipment used in such operations.
5.8. All work around power lines shall be performed by Certified Line Clearance Tree
Trimmers in accordance with OSHA 229 CF 1910.269, 1910.331 and ANSI Z133.-2017.
6. Warranty
6.1. The contractor shall warrant all labor and workmanship provided under the terms of the scope of work for six (6) months from the date of completion and acceptance by the government.
7. Submittals - Submit within timeframe identified in table below as noted under section titled
“Deliverables”.
7.1. Before any work commences, the COR must approve all submittals.
7.2. Certifications/Licenses:
7.2.1. The Contractor shall submit copies of the Certifications / Registrations to the
Contracting Officer within 10 days of award. This shall include the Categories of
Certification appropriate to the type of application being performed;
7.3. Detailed work plan – must include proposed timeline, methodology of work to be performed, plan documents with dimensions, and any other pertinent data necessary for complete services.
7.4. Site specific safety plan.
7.5. Staging plan – must identify proposed staging of equipment storage, material storage, refuse receptacle, etc.
7.6. Temporary traffic control plans (maintenance of traffic) as applicable.
8. Quality Assurance/Control
8.1. All work shall meet ISA, SCDHEC, TCIA, OSHA, ANSI, AASHTO, FHWA, MUTCD, and other applicable codes, and standards. The Contractor shall utilize the most stringent code requirement, regardless of the code source or the version adopted by a jurisdiction.
8.2.Work performed under this contract shall be subject to inspection and approval by the
COR.
8.3. Careless, unsafe, and other performance issues that have been previous addressed within this scope will not be acceptable.
8.4. Any deficiencies shall be documented by the COR and provided to the contractor. Any corrective actions or other form of addressing the documented concern/issues shall be addressed and mitigated, or provided with a timeline for being addressed with appropriate identified method, within eight (8) hours from the time of notification with approval as such from the COR.
9. Safety and Health - The contractor shall provide all necessary supervision, safety protection devices, and personal protective equipment (PPE), required for complete and safe operations on site. Protective measures shall prevent injury to the public, Federal employees and contractors, visitors, Contractor’s employees, and damage to or contamination of surrounding property and/or the environment.
9.1. The Contractor shall conduct his/her operations so as to prevent accidents, injuries and damages; shall observe all fire, safety and traffic regulations. The Contractor shall provide all personal protective equipment including but not limited to chaps, helmets, gloves, face masks, safety shoes/boots, hard hats, and eye and ear protection as required under the documented Safety Plan and per industry, and national standards, at no expense to the Contractor’s employees. The Contractor shall also be responsible for all safety communication and training requirements for the safe use of all equipment and materials. All protective equipment must meet ANSI standards and used as required by
OSHA and as directed by the COR.
9.2. The contractor shall comply with all pertinent provisions of the Occupational Safety and
Health Administration (OSHA) Standards, 29 CFR 1910, and 1926. Work shall conform to the ANSI; and any pertinent federal and local codes and requirements. All OSHA requirements may be obtained without cost to the general public at www.osha.gov . The
Contracting Officer (CO) or Risk Manager may include additional measures if determined necessary or required by other Federal, State or local law, or park policy.
9.3. The Contractor shall have a Hazard Communication Program in place as required by 29
CFR 1910.1200 where Safety Data Sheets (SDS) / Technical Data Sheets shall be obtained by the contractor for all hazardous materials to be used in the performance of this contract. This plan shall be furnished to the NPS prior to the start of work. These
SDS’s and an inventory of hazardous materials must be provided to the CO or COR prior to bringing the material on site. SDS shall be maintained at any jobsite where a substance requiring a SDS is being used. It shall also be available in any vehicle carrying such substance while in the Park. These SDS will be available to all employees of the
Contractor, employees of the Park, concessionaires and the public when any member of these groups might come in contact with, or be exposed to, any substance requiring a
SDS due to its hazardous status.
9.4. All work, including contact with and handling of hazardous materials, the disturbance or dismantling of structures containing hazardous materials, and/or the transport and disposal of hazardous materials shall comply with the applicable requirements of 29
CFR 1910/1926, and 40 CFR 761/260-271.
9.5. In the event of a reported physical injury, repeated service interruption, or an accident involving damage or equipment fire has occurred, the Contractor shall immediately secure the site and notify the COR.
9.6. In the event the contractor becomes involved in any incident or accident involving a
Park Visitor, or Park Property, the contractor must notify both the COR and park superintendent.
9.7. Contractors are subject to safety inspections performed by Park personnel or others.
These inspections may be routine, unannounced, or based on reports of unsafe or unhealthy working conditions. Safety violations will be reported to the CO. If a violation is deemed to be immediately dangerous to health, life, or serious in nature, the COR or any park officer at the Division Chief level or higher, has the authority to stop work until the matter may be resolved to the CO’s satisfaction.
9.8. Pruning techniques, rigging procedures, work site controls and safety, and other means and methods shall be executed in accordance with the ANSI Z133 standards, industry best practices, contractor’s operational safety plan, and any special requirements as necessary for the scope of work.
9.9. Removal techniques, felling procedures, work site controls and safety, and other means and methods shall be executed in accordance with the ANSI Z133 standards, industry best practices, contractor’s operational safety plan, and any special requirements as necessary for the scope of work.
9.10. Stump Grinding techniques, work site controls and safety, and other means and methods shall be executed in accordance with the ANSI Z133 standards, industry best practices, contractor’s operational safety plan, and any special requirements as necessary for the scope of work.
9.11. The Contractor shall assume the responsibility for accidents or damage caused to property as a result of performing the required services, unless such damage is necessary to perform functions of this SOW and brought to the attention of and approved by the
COR prior to work beginning
10. Environmental Requirements
10.1. The Contractor shall comply with all Federal, and state of South Carolina regulations pertaining to hazardous material use, storage and disposal. Materials and chemicals shall be stored, used and disposed of in such a manner as to not endanger or threaten the environment and the health and safety of lands within South Carolina and
Park employees and visitors. All generated waste shall be disposed of legally at the completion of each day's work. All requirements associated with disposal, including but not limited to hazardous materials reporting, hazardous waste removal, tare reporting, fees, rental of dumpsters, and tipping fees, shall be the responsibility of the contractor.
Dumpsters and other waste disposal arrangements will be made separately from those used by the NPS for daily operations.
10.2. Materials and chemicals shall be stored, used and disposed of in such a manner as to not endanger or threaten the environmental, animal, or human health and safety.
10.3. The Contractor shall provide the safety data sheets (SDS), with any hazardous materials listed on the attached Hazardous Material List, to the COR for approval to be utilized in performing work of this contract. No supply, material, or equipment shall be used prior to approval by the COR. Upon approval of supplies, materials, and equipment by the COR, the COR and Contractor will formulize and concur on an operating procedure, that shall be adhered to, for the Contractor’s personnel performing work of the contract that requires use of the products or residue that is considered hazardous.
11. Natural Resource and Wildlife Protections
11.1. NPS will flag and map rare plant locations prior to contract operations. Placement and piling of debris on flagged rare plant locations is not permitted.
11.2. As of calendar year 2025, the park is within the year-round active zone (zone 1) for the tri-colored bat (TCB). TCB is currently a species proposed for listing as endangered under the Endangered Species Act by the U.S. Fish and Wildlife Service
(USFWS). In order to ensure compliance with species protection regulations, tree removal activities (non hazardous removals) in forested areas should not occur:
(1) During the pup season (May 1 to July 15), or the winter torpor period (Dec 15 to March 31).
(2) When temperatures are 40°F or below.
11.2.1. Trees that become a safety hazard and could threaten life or property may be removed in emergency situations any time of year.
11.3. The Contractor shall preserve and protect all existing vegetation such as trees, shrubs, and grass on or adjacent to the work areas. The Contractor shall be responsible for all unauthorized cutting or damage to trees and shrubs, including damage resulting from careless operation of equipment, stockpiling of materials or tracking of grass and other surfaced areas by equipment. Such damaged areas or materials shall be restored, repaired or replaced by the Contractor, to the satisfaction of the COR, at no expense to the National Park Service (NPS) prior to Task Order Acceptance.
12. Contractor/Contractor Personnel Responsibilities
12.1. Contractor shall provide a contact list of Contractor personnel assigned to the contract within 10 days of award for communication purposes to the COR. This list should at the minimum provide the names of key personnel, titles, email address(s), office number, and cellular number.
12.2. Contractor shall provide cellular phones to their supervisor or foreman for contact and information associated shall be provide to the CO/COR.
12.3. Contractor shall provide labor records for all personnel assigned to perform work of this contact to the CO/COR as defined in deliverables schedule.
12.4. Contractor vehicles, if company owned shall have the contractor’s name and logo on each side of the vehicle and shall display a park provided vehicle pass (if necessary) within the vehicle where it shall be clearly visible.
12.5. Contractor/ Contractor Personnel shall park in legal parking spaces identified by the park/or within the park.
12.6. Contractor personnel shall wear either the standard company issued uniform or approved attire by company’s standards (shirt, smock, coveralls) of a distinctive color clearly bearing the Contractor’s company name and an approved method of identification as issued by the Contractor. Uniform must be worn at all times by personnel when performing work of this contract.
12.7. Contractor shall require its employees to comply with the instructions pertaining to conduct and park regulations.
12.7.1. Contractor personnel shall perform work in a safe manner. Unsafe work habits shall be addressed by the COR to the Contractor to have corrective measures implemented. Should the unsafe work habits persist, the Contractor will be notified by the COR and required to remove the Contractor personnel.
12.7.2. Contractor personnel shall have a form of Government issued identification in their possession at all times while performing work of this contract.
12.7.3. Contractor personnel shall be respectful, courteous and mindful of the park environment, visitors, and park personnel. Contractor personnel are subject to the rules and regulations of the NPS at all times while performing work of this contract.
12.8. Contractor shall be requested by the CO to remove personnel in its employment on this contract for the following reasons:
12.8.1. Exhibiting inappropriate or offensive behavior while performing work of this contract or while on federal property.
12.8.2. Disrespect to NPS employees or visitors during performance of the contract.
12.8.3. Using illegal drugs, drinking alcoholic beverages, intoxicated behavior or unsafe work habits.
12.8.4. Any other misconduct or inappropriate behavior.
12.8.5. Contractor shall be responsible for immediate removal of contractor personnel that do not follow conditions set forth within this contract. When it is necessary to remove a personnel(s), the contractor shall immediately provide a replacement(s) to carry out the services to be performed under this contract. Contractor is responsible for obtaining all Government issued property from the removed personnel;
providing to the COR within three (3) business days.
13. Government Responsibilities
13.1. NPS shall provide site access as approved and appropriate for performance of this contract.
13.2. Neither electrical power nor potable water will be furnished by the Government.
13.3. Restroom facilities are located within the park.
13.4. Staging areas made available to the contractor will only be used in the performance of work under this contract. The Contractor shall maintain such space in a neat, orderly condition, and shall at the expiration of the contract, return it to the
Government in reasonably the same condition as at the time of entering into the contract.
The Government does not assure security or safekeeping of items stored on the worksite, and will not be responsible for any damage or loss to the Contractor’s stored supplies, materials, equipment, or replacement parts.
14. Pre-Work Conference - A pre-work conference will be conducted between the National
Park Service Contracting Officer (CO) and the Contractor prior to the beginning of the work.
14.1. The Contractor shall designate in writing at this meeting the names, telephone numbers, and addresses of all supervisors. The Contractor or his/her supervisor shall be available at all times when the contract work is in progress to receive notices, reports or requests from the CO or the COR.
14.2. It is advised by NPS CO that the Contractor Supervisor and other key personnel attend the pre-work conference as key members of the Contractor’s personnel team for this contract.
15. Reports
15.1. The contractor shall maintain a daily work log recording the quantities of work performed and the locations. A copy shall be filled with the COR on a daily or weekly basis.
15.2. The contractor shall note and report to the COR in writing the presence of any conditions that need to be addressed and cannot be corrected within the scope of work described herein. If so directed by the COR the contractor shall provide a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, and equipment required to perform the task(s). The COR will evaluate the proposal and if valid will seek approval from the Contracting Officer. Failure of the contractor to obtain the approval of the Contracting Officer for work beyond the scope of the contract will release the government from any obligation to pay for services claimed.
16. Deliverables - Contractor provide all the required deliverable for the performance of this contract, as identified below, to the CO/COR within the timeline listed below:
Deliverable Due Notation(s) Certificate of Insurance Within 10 calendar days after award
Business Licensing/Permits Within 10 calendar days after
Must be valid and designated to for work to be performed in South Carolina.
Contractor Personnel Within 10 calendar days of award
Must be individuals that are assigned to perform work of the contract, and include relevant certification.
Quality Control Plan Within 10 calendar days of
Work Schedule 14 days calendar days prior to commencement of work.
Submit proposed schedule of work, listing approximate dates that office areas will be unavailable for building staff use during performance of work.
Staging Plan Within 10 calendar days of award
Submit proposed staging of materials and equipment to be used during performance of work.
Site Specific Safety Plan 14 days calendar days prior to commencement of work.
Submit safety measures that will be implemented to protect park resources, park employees, public, and contractor employees.
Temporary Traffic Control Plan 14 days calendar days prior to commencement of work.
Submit any temporary traffic control measures necessary for performance of work.
Supply, Material, Equipment List
Within 10 calendar days of award
Shall be submitted and approved prior to use to perform work of the contract. Materials samples must be approved by COR prior to installation.
Hazardous Material/Chemical List
Within 10 calendar days of award
Submit with hazardous materials communications plan, and spill prevention plan.
Daily Work Reports Weekly Compile daily progress reports during performance of work, and submit weekly.
Meeting Minutes Within 3 days of meetings. Shall taken during performance meeting and shall be provided to the COR within 3 days business days after meeting
Log of supplies, materials, and equipment
Weekly Submit as attachment to daily work reports.
Payroll Report Varies Shall be submitted with each invoice.
17. Government Points of Contact - NPS shall designate a Contract Officer and an individual to serve as the CO Representative who shall be the primary point of contact for day to day operations of the program.
Contracting Officer:
TBD
Contracting Officer
Representative:
Andy Welborn
Kings Mountain National
Military Park
2625 Park Road
Blacksburg, SC 29702 andy_welborn@nps.gov
18. Procedures for Measurement and Payment
18.1. Any inquiry regarding payment shall be directed to the COR.
18.2. Invoice for payments will need to be submitted to the NPS COR by email at simeon_myers@nps.gov for approval of payments before being entered into Invoice
Processing Platform (IPP). Once approval is received by the COR, the Contractor may submit payments in IPP for processing.
18.3. Invoices must provide the following information:
• Date of Invoice
• Contractor Address
• Billing POC (Contractor)
• Billing - Contact email (Contractor)
• Billing Period (must fall within period of performance)
• Location(s) Service(s)/Delivery performed
• Rate of Service(s)/Items
• Invoice Number
• Contractor Phone Number
• Billing - Contact Phone Number (Contractor)
• Contract/Task Order Number mailto:simeon_myers@nps.gov
• Date of Service(s)/Delivery
• Acceptance performed
• Description of Service(s)/Item(s) delivered/performed
18.4. Hard copies of an invoice may be mailed to the following if preferred. Please note if mailed, it may take longer for response from NCA COR for payment approval to be processed in IPP:
National Park Service
Kings Mountain National Military Park COR: Andy Welborn
2625 Park Road Gaffney, SC 29702
Contract Number: TBD
18.5. All payment requests, once approved by the COR, must be submitted electronically through the U.S. Department of the Treasury's (https://www.ipp.gov)
Invoice Processing Platform System (IPP).
18.6. Invoices must clearly state where work was performed and what work consisted of.
18.7. The Contractor shall upload a copy of the invoice as an attachment(s) through
IPP.gov. The invoice will be rejected if a copy is not attached through IPP.gov.