This Quality Assurance Surveillance Plan outlines performance requirements and evaluation methods for a Cooperative Biological Engagement Support contract. The contract requires supporting threat reduction networks through activity planning, technical reports, weekly status calls, monthly progress reports, and a final report. Deliverables must meet 95% accuracy initially and 100% with one correction. Performance is monitored monthly on quality, timeliness, and effectiveness of deliverables and services provided. Unsatisfactory performance is defined as not meeting most requirements and unlikely to improve timely. The related federal opportunity is a set-aside solicitation for HUBZone small businesses to provide Cooperative Biological Engagement Support through continued development of threat reduction networks, research and documentation support, and data collection from partner countries to support the Combat Capabilities Development Command Chemical Biological Center's management of these efforts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Soliciation Amendment 0003.pdf | ||
| Questions Responses FINAL.xlsx | XLSX spreadsheet | |
| Amendment 0002.pdf | ||
| Amendment 0001 SolicitationW911SR-20-R-BESC.pdf | ||
| Amendment 0001 SolicitationW911SR-20-R-CBES.pdf | ||
| A07 - Solicitation Questions Template.XLSX | XLSX spreadsheet | |
| A02 - FINAL CDRLs 27 July.docx | DOCX document | |
| Performance Assessment Questionnaire.docx | DOCX document | |
| A03 - DD254 25 March 2020.pdf | ||
| Solicitation W911SR-20-R-BESC.pdf | ||
| Cost Template - CBES 20-R-BESC.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
Cooperative Biological Engagement Support (CBES)
1.0 INTRODUCTION.
1.1 Purpose. The role of the Government in quality assurance is to ensure contract standards are achieved. The purpose of the Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to evaluate contractor actions while performing the requirements in the Performance Work Statement (PWS) and the proposal. It is designed to provide an effective surveillance method by monitoring contractor performance for each listed performance objective in the Performance Requirements Summary (Section 7).
1.1.1 The QASP provides a systematic method to evaluate the services the contractor is required to perform for providing the hardware and data item deliverables.
1.1.2 The QASP has been developed by the requiring activity. It is designed to provide direction to personnel performing contract surveillance activities. Personnel surveying the contract terms and conditions and PWS requirements will periodically review the QASP throughout the life of the contract.
2.0 ROLES AND RESPONSIBILITIES.
2.1 Contracting Officer’s Representative. The Contracting Officer’s Representative (COR) is responsible for quality assurance guidance and to ensure that contract quality requirements, provisions, standards, and thresholds are defined, practical, enforceable, necessary, and verifiable.
2.1.1 The COR evaluates and documents contractor performance in accordance with the QASP and PWS.
2.1.2 The COR notifies the Contracting Officer of any significant performance deficiencies using a Contractor Discrepancy Report with supporting documentation.
2.1.3 The COR maintains surveillance documentation.
2.1.4 The COR recommends improvements to the QASP and PWS throughout the life of the contract.
2.2 Contracting Officer. The Contracting Officer is responsible for safeguarding the interests of the United States Government in contractual relationships. Only the Contracting Officer is authorized to bind the Government and then, only to the extent of the authority delegated to them through the issuance of a warrant.
2.2.1 The Contracting Officer delegates authority for inspection and/or acceptance in accordance with the terms of the contract.
2.2.2 The Contracting Officer informs the contractor of the names, duties, and limitations of authority for all quality assurance personnel assigned to the contract.
3.0 DESCRIPTION OF SERVICES. The objectives of this contract are: (1) to support the creation and the continued development of Threat Reduction Networks; (2) to support research, collection, assimilation and documentation of the latest policy and guidance from all relevant stakeholders and gathering relevant data from identified partner countries; and (3) to provide support to the DTRA Science-Technology team.
4.0 QUALITY REQUIREMENTS.
4.1 Quality Control Program. The contractor, not the Government, is responsible for management and quality control actions to meet the terms of the contract.
5.0 SURVEILLANCE. The COR will perform monthly surveillance based on the quality and effectiveness of the contractor’s data deliverables as well as the services provided.
5.1 Unacceptable Performance. If the number of complaints/defects exceeds the performance threshold for any objective, the COR will determine the possible cause of this unacceptable performance. Government-caused complaints/defects will not be counted against the contractor. The same applies to any other requirement of the contract when Government-caused complaints/defects are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable for any requirement by the COR, the COR will inform the contracting officer for resolution. Significant performance deficiencies must be submitted to the Contracting Officer using a Contractor Discrepancy Report and include supporting documentation.
6.0 DOCUMENTATION REQUIREMENTS.
6.1 TRN/Activity Plans, Fact Sheets, and Meeting Support Documents.
6.2 TRN Technical Reports and Materials
6.3 Weekly Status Reports
6.4 Monthly Progress Reports
6.5 Final Reports
7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS).
7.1 Overview. This PRS summary identifies the services required by the PWS over which the Government will exercise surveillance.
7.2 Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Revising and resubmitting the documentation at no cost to the Government is the preferred method for correcting unacceptable performance. The contractor shall provide the Government a written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.
7.3 Performance Objectives, Standards, Thresholds, and Surveillance Methods. The services required by the contractor are summarized into performance objectives along with the minimum standards that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PERFORMANCE REQUIREMENTS SUMMAY
| Performance Objective |
| Performance Standard |
| Performance Threshold |
| Method of Surveillance |
TRN / Activity Plans Activity Project Plans (PWS Para C.4.1 – 4.4; ELIN A001)
| TRN reports and/or materials contains required information and is accurate, complete and accepted in accordance with the DID and the Government schedule. |
| 95% accuracy and completeness |
100% accuracy and completeness with one correction/rewrite.
100% inspection of deliverables
TRN / Technical Reports and Materials
(PWS Para C.4.5; ELIN A002)
TRN reports and/or materials contains required information and is accurate, complete and accepted in accordance with the DID and the Government schedule.
95% accuracy and completeness
100% inspection of deliverables
Weekly Teleconference (PWS Para C.5.2.1; ELIN A003)
| Status Report require conducting a weekly teleconference, conducted between stakeholders, for the purposes of planning engagements with the three countries referenced in 4a. Information and is accurate, complete and accepted in accordance with the Data Item Description (DID) and the Government schedule. |
| 95% accuracy and completeness with first draft. |
100% accuracy with one correction/rewrite.
100% inspection of deliverables
Monthly Progress Report (PWS Para C.5.2.2; ELIN A004)
| Progress Report contains required information and is accurate, complete and accepted in accordance with the Data Item Description (DID) and the Government schedule. |
| 95% accuracy and completeness with first draft. |
100% accuracy with one correction/rewrite.
100% inspection of deliverables
Final Report
(PWS Para C.5.2.3; ELIN A005)
Final Report contains required information and is accurate, complete and accepted in accordance with the DID and the Government schedule.
95% accuracy and completeness
100% inspection of deliverables
The evaluation ratings are as follows:
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.