PERFORMANCE WORK STATEMENT
Otay Electrical Install
June 2022
Table of Contents
1.0 BACKGROUND
2.0. SCOPE
3.0 MANAGEMENT
3.1 PROGRAM MANAGEMENT
3.2 SUBCONTRACTOR MANAGEMENT
3.3 CLEARANCES
3.4 Contractor-Acquired Property
4.0 ADDRESSEES
5.0 DATA RIGHTS, DISTRIBUTION LIMITATIONS, AND MARKINGS
5.1 DATA RIGHTS
5.2 DISTRIBUTION/RELEASE LIMIATION STATEMENTS
5.3 EXPORT CONTROL STATEMENT
5.4 DESTRUCTION NOTICE
5.5 MARKINGS
6.0 SECURITY
TABLE 1: ACCEPTABLE PERSONNEL
1.0 BACKGROUND
The U.S. Army Engineer Research and Development Center (ERDC) has been directed by Customs and Border Protection (CBP) to support their current missions on the Southwest Border. As a component of the United States (U.S.) Department of Homeland Security (DHS), CBP is responsible for protecting our Nation’s borders in order to prevent terrorists and terrorist weapons from entering the U.S. while facilitating the flow of legitimate trade and travel. The ERDC has been directed by CBP to connect power to 3 underground sensor vaults along a 2 mile portion of the U.S. Southwest Border for
USBP.
2.0. SCOPE
Under this effort, the contractor shall provide the management, personnel, equipment, transportation and incidentals needed to connect, install, and test the power connection at 3 underground vaults as required by this Performance Work Statement (PWS).
The contractor Provide all labor, materials, and equipment to install power from the gate panel, in existing 4" underground conduit, to Sub Panels at Site 1, 2, and 3 per FAA/CBP OTAY Mesa Gate 499 Drawings dated 8/3/2021, Sheet 1 (Site 1), Sheet 2, (Site 2) and Sheet 3 (Site 3). Terminate the electrical wire in accordance with Sheets 1 thru 3 in the underground Sub Panels. Distances and overview are provided in sheets 4, 5.
Your proposal should contain a complete itemized breakdown in sufficient detail to permit an analysis of all material, labor, equipment, subcontract, overhead costs (including extended overhead costs), and profit as required by DFARS 252.236-7000.
The breakdowns for your proposed labor rates must show an itemization of all applied markups and burdens used to arrive at your proposed rates. Your proposal should include the contract schedule, network analysis, system activities that are affected, fragnet of all impacted schedule changes, and both the time and cost effect on each activity.
3.0 MANAGEMENT
3.1 PROGRAM MANAGEMENT
The Contractor shall provide program management required to achieve installation and testing goals, leveraging past performance, key personnel and experience with CBP programs from prior lessons learned.
3.2 SUBCONTRACTOR MANAGEMENT
The Contractor shall manage key subcontractors who have past performance in civil engineering, construction and deployment of current technology for CBP programs.
3.3 CLEARANCES
The Contractor shall provide staff and resources with the appropriate level of required clearance to support and perform activities including, but not limited to, storing and installing equipment, accessing the secured facility, providing data analysis and reach back support, and maintaining hardware and software systems. Contractors that are U.S.
citizens holding active DOD clearances may be eligible for CBP Background Investigation (BI) and DHS Secret clearance reciprocity. Contractors that are non-U.S.
citizens will need to be vetted based on agreements established between DOD and their sponsoring government.
TABLE 1: ACCEPTABLE PERSONNEL
Personnel Type Full Access (w/ need to know)
Limited Access (w/ escort)
No Access Reach back Support
Contractor with DHS Secret clearance, CBP Suitability, and Personal Identity Verification
(PIV)
X X
Contractor with DHS Secret clearance, CBP Suitability, no
PIV
X X
Contractor with CBP Suitability
X X
DoD Secret Clearance with vetting from CBP
X
Vetted Foreign National with Secret clearance equivalent
X X
Non-vetted foreign national
X
3.4 Contractor-Acquired Property
The contractor shall deliver a list of all Contractor-Acquired Property (CAP) items. Excess material and CAP shall be dispositioned in accordance with the Government Property clause in this contract and the contractors approved property management system. (A002)
4.0 ADDRESSEES
TBD at award.
Procuring Contracting Officer (PCO)
Program Manager (PM)
Security Officer
5.0 DATA RIGHTS, DISTRIBUTION LIMITATIONS, AND
MARKINGS
5.1 DATA RIGHTS
The Contractor shall deliver all products and documents from this effort with unlimited rights to the Government. All data and reports shall contain the following:
This material may be reproduced by or for the U.S. Government pursuant to the copyright license under clause at DFARS 252.227-7013 (February 2014).
The U.S. Government retains Unlimited Rights. Unlimited rights means right to use, modify, perform, display, release, or disclose technical data in whole or in part, in any manner and for any purpose whatsoever, and to have or authorize others to do so.
5.2 DISTRIBUTION/RELEASE LIMIATION STATEMENTS
The Contractor shall mark all documents generated under this effort with the following markings. This does not preclude any special marking due to classification. The Contractor shall mark all classified documents in accordance with the DOD 5200.22-M, Industrial Security Manual, Section 11-19 or DOD 5200.1-R, Information Security Program Regulation, Chapter IX and the applicable security classification guide. See Contract Section D for the distribution statement and document markings for this effort.
DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only (Critical Technology) (10 Jun 2050). Other requests for this document shall be referred to ERDC Attn: Program Security Officer, 3909 Halls Ferry Road, Vicksburg, MS 39180.
DISTRIBUTION STATEMENT F: Further distribution only as directed by ERDC Attn: Program Security Officer, 3909 Halls Ferry Road, Vicksburg, MS 39180
5.3 EXPORT CONTROL STATEMENT
The contractor shall include the following export control statement on all documents.
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq) or Executive Order 12470.
Violation of these export laws are subject to severe criminal penalties.”
5.4 DESTRUCTION NOTICE
The Contractor shall include a destruction notice on all Technical documents marked with Distribution Statements B, C, D, E, F, or X as follows. DESTRUCTION NOTICE – For classified documents, follow the procedures in DOD5200.22-M, National Industrial Security Program Operational Manual, (NISPOM), Section 7, paragraph 5-700 or DOD 5200.1-R, Information Security Program Regulation, Chapter 1X. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.5 MARKINGS
All documents shall be marked “UNCLASSIFIED/FOR OFFICIAL USE ONLY.”
6.0 SECURITY
This project is classified up to FOUO, the field deployable hardware is FOUO. Access to and generation of material up to FOUO is required. No data or other deliverables from this effort shall be distributed, published, briefed, or otherwise used without express approval from the Government COR. No material shall be generated that contains limitations or capabilities of the system, including maximum distance of detection or depth of detection.