A.03.09 Attachment 2 - Drawings.pdf

PDF 9 MB Posted

Attached to
Little Goose Dam Qualitrol Gas Analyzer
Solicitation number
W912EF22Q0025
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

g2hdcbjb Rectangle g2hdcbjb Line g2hdcbjb Text Box T1 Bank g2hdcbjb Text Box Proposed location for DGA monitor in transformer containment vault again wall g2hdcbjb Line g2hdctc9 g2hdctc9 Rectangle g2hdctc9 Rectangle

Line g2hdctc9 Oval g2hdctc9 Oval g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Rectangle g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text Proposed Serveron and Helium cylinder location (not shown to scale) g2hdctc9 Typewritten Text g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text Tubing to upper filter valve g2hdctc9 Typewritten Text Tubing to lower filter valve

File details come from the government source that posted it. Updated .