This Addendum #3 to IFB 99-JD25021 issued by Guilford Technical Community College (GTCC) in North Carolina clarifies equipment quantities and specifications for an audiovisual systems refresh project across 38 rooms in three GTCC campuses. The addendum addresses vendor questions regarding specific equipment quantities for line items including Extron processors, panels, switchers, amplifiers, speakers, network switches, document cameras, adapters, and various cables. Key clarifications include confirmation that 28 Extron IPCP Pro255Qxi processors and EBP 100 panels are required (with no equipment needed in rooms AT 220 and AT 230), 18 document cameras are needed with 3 designated as spares, 14 Satechi adapters are required with 3 as spares, and 31 network switches are to be provided with 1 as a spare. The addendum specifies that all networking cables must meet Cat6 or higher standards, with Cat6A currently in use, and all twisted pair cabling must be shielded and meet local building codes. The addendum confirms the Barco Clickshare installation location as JWH 220, clarifies floor track ADA compliance requirements for specific rooms, and addresses questions regarding speaker mounting specifications (2x2 flat field speakers per room), existing equipment reuse, and cable cubby specifications. The addendum extends the bid submission deadline by one week from the original May 15, 2026 date to allow vendors sufficient time to incorporate the clarifications into their proposals.

The addendum provides critical technical and logistical clarifications regarding the scope of work rather than introducing new pricing terms or contract conditions. Vendors are required to acknowledge receipt of this addendum by signature and return it with their IFB package. The document confirms that GTCC will provide certain equipment items such as projectors for specific rooms and will handle disconnection of power to existing wall-mounted screens and patching of wall holes, while the vendor is responsible for removing existing screens and installing new ones. The clarifications address discrepancies between the original equipment line items and room-by-room breakdowns, confirming that GTCC will work with the selected vendor to make minor room adjustments as needed and that basic plans have been provided as guides rather than final specifications.

View the file

Other files for this state and local contract opportunity

Other files attached to AV Refresh, newest first.
File Type Posted
Enhanced Classroom Drawing.pdf PDF
Basic Ceiling Mount Classroom.pdf PDF
GTCC Typical Classrom Install.pdf PDF
99-JD25021 AV Refresh.pdf PDF
Basic Short Throw Classroom.pdf PDF
99-JD25021 Bid Addendum 4.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e ADDENDUM # 3 | IFB 99-JD25021

ADDENDUM # 3

IFB NO. 99-JD25021

Commodity Code: 451118 Description: Video and combination video and audio presentation equipment and hardware

Date: Monday, May 11, 2026

This addendum addresses the following:

RESPONSES TO VENDOR QUESTIONS:

Q The listed Lumens Ladybug DC136 just went EOL. We do not anticipate any more inventory of this model. We do have a couple of alternatives: DC132U and DC172.

A The 132U will be great to use.

Q Line item 2 on page 9 states a total qty 28 Extron IPCP Pro255Qxi processors shall be provided. Based off of room count, starting on page 27, The MLC count is thirty (30). How many processors shall the AV vendor provide?

A 28 is correct. No need for this equipment in AT 220 or AT 230.

Q Line item 3 on page 9 states a total qty 28 Extron EBP 100 panels shall be provided. Based off of room count, starting on page 27, The count is thirty (30). How many EBP 100 panels shall the AV vendor provide

A 28 is correct. No need for this equipment in AT 220 or AT 230.

Q Line item 4 on page 9 states a total qty 28 Extron DTP3 IN2004 switchers shall be provided. Based off of room count QTY 38, Which 10 spaces will not be getting the switcher?

A 28 is correct. No need for this equipment in AT 220 or AT 230 or any T1v space.

Q Line item 5 on page 9 states a total qty 29 Extron amplifiers shall be provided. Based off of room count, QTY 19, rooms will be receiving new speakers. Which additional 10 spaces will be receiving a new amplifier?

A All of GH needs new amplifiers. No amp needed AT220 or221. That will leave 1 amplifier as a spare.

Q Line item 6 on page 9 states a total qty 18 Extron speakers shall be provided. Based off of room count, QTY 19, rooms will be receiving new speakers. How many speakers shall the AV vendor provide?

A AT220, AT221, and AT373 do not need speakers.

Q Line item 7 on page 9 states a total qty 31 network switches shall be provided. Based off of room count, QTY 30, rooms will be receiving new network switch. How many network switches shall the AV vendor provide?

A 31, one as a spare.

Q Line item 8 on page 9 states a total qty 15 document cameras shall be provided. Based off of room count, QTY 18, rooms will be receiving a document camera. How many document cameras shall the AV vendor provide?

A Please check again, the quantity is 18.

Q Line item 9 on page 9 states a total qty 14 Satechi Multiport Pro Adapter V2 shall be provided. Based off of room count, QTY 11, rooms will be receiving a Satechi Multiport Pro Adapter V2. How many adapters shall the AV vendor provide?

A 14 Adapters, I need 3 spares.

Q Line item 10 on page 9 states a total qty 6 Floor Track ADA Compliant shall be provided. Which rooms will receive the Floor Track ADA Compliant?

A AT 220, AT 221, AT152, AT260, AT362, and others as we find them. Most of these rooms will only need a section about 4’ long.

Q Which space does the Barco Clickshare get installed into?

A JWH 220.

Q Line item 19 on page 10 states a total qty 16 XLM-XLF 50’ Audio Cable for Enhanced Classroom shall be provided.

There are a total of QTY 3 Enhanced Classroom with four (4) microphones in each space. Where are the additional qty

2 | P a g e ADDENDUM # 3 | IFB 99-JD25021

4 Audio Cables to be installed?

A 4 for each microphone in 4 rooms. 4 for going from Kramer VP-14 to connect to each room Blackmagic Web Presenter, or I will save them as spares.

Q Line item 22 on page 10 states a total qty 1 SDI AV Switcher for Enhanced Classroom shall be provided. There is a total of QTY 3 Enhanced Classroom. Can GTCC confirm how many SDI AV Switcher for Enhanced Classroom are to be provided by the AV vendor?

A Only 1 is needed for AT 251.

Q Room Types Short-throw. Will the AV vendor be responsible for providing a USB extender to the PC location for the GTCC provide short throw interactive projector? If so, what make/model is acceptable?

A We have used Monoprice, TrippLite, and Startech. All Have worked well for us.

Q

Section 8.5 states that the Vendor must include an itemized equipment list with cost per item and room digital design schematics (detailed block diagram is acceptable). Due to the discrepancies in line-item quantities and room by room breakdown, will GTCC provide the AV vendor an itemized equipment list breakdown per space? This will be necessary to complete a signal flow diagram.

A GTCC has provided basic plans for you to use as a guide. We may have a couple of rooms that will need minor changes. A GTCC representative will work with Vendor to adjust.

Q In Gerrald Hall, GTCC will be responsible for disconnecting power to existing wall mounted electric screens. Will GTCC facilities also remove the screens or is that responsibility of the vendor? There is potential that there may need patch and paint and that falls under GTCC.

A The vendor will remove existing screens and hang new ones. GTCC will disconnect power and patch any holes in the walls.

Q EBP 100: The rooms will vary on mounting per meeting from wall to desk tabletop. Will GTCC be utilizing existing Extron 2-gang SMB boxes? Do vendors need to account for SMB 112 boxes in misc. costs? If so, how many?

A We can use 11-SMB 112 boxes for Gerrald Hall. No other space needs them. Other spaces currently have an MLC104PlusL. We should be able to use the same cutout. Some places may need a plastic plate to cover excess holes showing.

Q Installation completion date can only be an estimate as there are too many variables for classroom availability and scheduling to state up front based upon standard bid response terms. How does GTCC wish to handle? Is there an GTCC completion date?

A We would like to finish as much as possible before the start of school in the Fall. We realize that this will probably not happen. We will work with the vendor and academic contacts to make rooms available.

Q Section 8.0, Page 32: T1v Rooms' questions? What will the ASA 131 summing adapter output connect to?

A Connects to Input 1 of the Biamp Tesira Forte x400.

Q

Section 4.0, Page 9 Item 1 lists eleven projectors ● It is assumed that these projectors will be designated for the eleven Gerrald Hall (GH) rooms. ● It is noted that “Laser projectors will not be replaced in the AT building. They were replaced two years ago. ● JWH Room 122 will receive one 75” display. ● Do the following other rooms already have a projector? o LRC 202 o HT 101 o HT 102 o W2 114 o W4 147 o C1 219.

A LRC 202 has a projector, and for all other rooms GTCC will provide projector.

Q

Section 4.0, Page 9 Item 2 lists twenty-eight control processors (MLC) and twenty-eight button panels. Thirty rooms require a control processor and button panels. Please verify the following: ● All eleven GH rooms require a MLC. ● Seventeen out of twenty AT rooms require a MLC. ● Does JWH Room 122 require an MLC? ● Does W2 Room 114 require an MLC?

A NO MLC or IPCP needed in AT 220 and 221.

Q

Section 4.0, Page 9 Item 5 lists twenty-nine audio amplifiers. There are thirty-eight rooms in total. ● The seven T1v rooms will not require an amplifier. (Please verify). ● Of the thirty-one rooms left, nineteen rooms will receive new loudspeakers. Will these rooms also require an audio amplifier? (Please verify) ● If the above items are correct, there will be ten amplifiers left. ● Will other rooms require new amplifiers?

A All of GH needs new amplifiers. No amp needed AT220 or221. That will leave 1 amplifier as a spare.

Q Section 4.0, Page 9 Item 6 calls out for eighteen pairs (36 individual) loudspeakers. Nineteen rooms are listed as requiring loudspeakers ● Will some rooms receive two loudspeakers? ● If so, which rooms will require two loudspeakers? ● If all rooms require one pair of loudspeakers, will one additional pair be required?

3 | P a g e ADDENDUM # 3 | IFB 99-JD25021

A AT220, AT221, and AT373 do not need speakers.

Q Section 4.0, Page 9 Item 8 calls out for eighteen document cameras. Fifteen rooms require a document camera. ● Will three document cameras be designated as spares?

A Yes, the additional three will be spares.

Q Section 4.0, Page 9 Item 9 calls out for fourteen Satechi Multiport Pro Adapter V2 devices. ● Eleven will be installed in the GH classrooms and Classroom-Labs. ● Will the remaining three be designated as spares?

A Yes, the additional three will be spares.

Q Section 4.0, Page 9 Item 10 calls out for six 8-foot sections of floor track. ● Which rooms will require floor track?

A AT 220, AT 221, AT152, AT260, AT362, and others as we find them. Most of these rooms will only need a section about 4’ long.

Q It is assumed that these SYSAU mounts are for the following T1v rooms. (Please verify) o HT 101 o HT 102 o W4 147 o C1 219.

A The rooms listed already have mounts.

Q Section 4.0, Page 10 Item 24 lists thirteen Da-Lite No. 6 Brackets ● Page 30 describes fourteen screens that will need to be installed. ● Does one room already have a pair of brackets?

A One room already has brackets.

Q Section 8.0, Page 30 Description of Work to be Completed ● ‘All twisted pair cabling must be shielded and meet local building codes. o Does this also include speaker cables? ● It is noted that shielded plenum rated cable is required. ● Does GTCC have a minimum Category cable specification?

A All networking cables must be Cat6 or higher. Currently we are using 6A

Q

Section 8.0, Page 30 Cables Cubbies - Vendor must reuse existing cable cubbies to add HDMI or USB-C (3.0 or higher) cable for newer laptop connection in all rooms except where there is no cable cubby. New units must include power and HDMI connection for a laptop. ● What brand and model number are the existing cable cubbies? Are there open spaces for the addition of needed HDMI and USB-C (3.0) connections?

A Rooms with cable cubbies have spaces for new cables. Some rooms do not have cubbies and do not need them.

Q Section 8.0, Page 31 Room Types All rooms with ceiling projection ● One (1) cable cubby existing or provided as indicated in room charts o Where are the “Room Charts”? ● How many speakers per room are required? Maybe two?

Flat field or surface mount?

A Room charts start on page 27. We did not include cubbies in the room charts as most rooms already have cubbies or do not need them at all. Each room with 2 2x2 FF speakers.

Q Section 8.0, Page 31 Enhanced Classroom ● Does LRC 202 require a projector?

A No, it already has one.

Q Section 8.0, Page 31 Are the following room types applicable to this project: ● single/dual or combine/split rooms ● independent dual projection rooms ● simultaneous dual projection room ● rooms with flat panel display.

A No, they are just part of our regular bid document.

Q Section 8.0, Page 32 GTCC will supply ● Item ‘e’ states GTCC will supply six (6) Sony VPL-PHZ50 ceiling mount projectors for T1v rooms. ● There are seven T1v classrooms listed beginning on page 28. ● Will GTCC provide an additional projector?

A AT 264 does not need any projector.

Q Section 8.0, Page 32 T1v Rooms ● The vendor will supply the following for seven T1v rooms: o Extron UCS SW 313 o Extron DA2 HD 8K AE o Extron ASA 131 o Extron DTP HDMI 4K 230 Tx o Sony VPL-PHZ50.

A GTCC will provide the projectors.

Q Is there any OFE in the T1v rooms that will remain and be reused with the newly provided equipment?

A Yes, there is a considerable amount of equipment that is staying.

Q 2.4. OFFER SUBMITTAL Will the State please consider extending the deadline to one (1) week after answers are posted to allow sufficient time to review and incorporate answers into our response?

A Yes. The State will extend the deadline. Please review the next posted addendum.

Q IFB Section 8.0 / Room Charts: Does the “N” shown on the room chart indicate that the vendor is not responsible for supplying the specified equipment and that the item is Owner-Furnished Equipment (OFE)?

A The N means that that item is not being replaced in that room.

Q IFB Section 8.0 / Equipment List and Room Charts: The ceiling speaker count appears to differ between the equipment

4 | P a g e ADDENDUM # 3 | IFB 99-JD25021 list and the room chart. The equipment list shows 18 pairs of ceiling speakers, but the room chart appears to show 19 rooms receiving ceiling speakers. Can GTCC please confirm the required ceiling speaker quantity?

A See other answers

Q IFB Section 8.0 / Room Charts: The room chart references MLC for control. Does this refer to the combination of the Extron EBP 100 and Extron IPCP Pro 255xi, rather than a standalone MLC controller?

A Yes, it does.

Q IFB Section 8.0 / Equipment List / Spare Equipment Requirement: Does GTCC require a spare for each item listed in the RFP? For example, if the equipment list shows QTY 11 Sony VPL-PHZ61 projectors, does GTCC require QTY 11 spare projectors as well, or is the spare requirement intended differently?

A The spare items needed are listed separately. 1 projector and 1 each of the two AV Switchers.

By providing signature below, the vendor is indicating that they have reviewed the question(s) and answer(s) for IFB No.

99-JD25021. This Addendum should be signed and returned with the IFB package.

Company

Printed Name

Signature Date

File details come from the government source that posted it. Updated .