9-Attachhment C RFP 546916 Bid Form Hasse-Emery Park Improvements 2026.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
RFP-546916 Hasse-Emery Park Improvement
Solicitation number
546916
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a bid form for the Hasse-Emery Park Improvements project (RFP-546916) issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department. The project encompasses comprehensive park improvements including tree removal and pruning (ranging from 5 inches to 36 inches in diameter across 29 total trees), demolition of existing site infrastructure, installation of concrete and asphalt connectivity pathways (8,900 combined square feet), playground equipment installation (including specialized equipment such as Wizard's Hideaway ADA, swing combinations, springers, and village house structures), site amenities (benches, picnic tables, grills, trash receptacles), landscape enhancements (trees and stepping boulders), and perimeter fencing (480 linear feet of 4-foot wood fence with concrete maintenance strips and park entrance). The project scope also includes play signs, pavement markings, and associated soft costs such as mobilization, bonds, insurance, and general conditions. The contract term is two years.

The bid form establishes a base bid structure with all line items currently showing zero dollar amounts to be completed by the contractor. The form includes a fixed allowance of $35,000 for Additional Services and requires contractors to provide unit rates for future work within the contract period, including chain link fencing, artificial turf surfacing, topsoil, seed/mulch, and natural sod installations. Bidders must also provide fully burdened hourly labor rates for construction management personnel including project managers, superintendents, engineers, estimators, and general contractor journeymen. The bid form includes alternates sections and explicitly states that all fees, bonds, insurance, and general contractor costs must be calculated and included in the pricing submissions. Failure to include required unit prices may result in bid disqualification.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

HASSE-EMERY PARK IMPROVEMENTS - Bid Form
DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL
BIDDING CONTRACTOR:
BASECOSTQTYUNITBID COSTAll Fees/Bonds/Insurance/GC's listed under Soft Costs
1SOIL EROSION AND SEDIMENTATION CONTROL MEASURES$ - 0
aSESC Measures$ - 01LSUM$ - 0
bTemporary Construction Sign$ - 01EA$ - 0
2DEMOLITION AND INSPECTION$ - 0
aTree/Shrub/Vegetation Removal, 5" or less$ - 019EA$ - 0
bTree Removal, 6"-18"$ - 03EA$ - 0
cTree Removal, 19"-36"$ - 02EA$ - 0
dTree Pruning$ - 05EA$ - 0
eConcrete Removal$ - 070SF$ - 0
f6' Fence Posts and Rail Removal$ - 01LSUM$ - 0
gSite Amenities Removal$ - 01LSUM$ - 0
iCatch Basin Clean-up and Inspection$ - 01LSUM$ - 0
3PARK CONNECTIVITY$ - 0include permit fee
a4" Concrete$ - 02,900SF$ - 0
bAsphalt Path$ - 06,000SF$ - 0
4PLAYGROUND$ - 0
aWizard's Hideaway ADA$ - 01EA$ - 0
bDouble Swing Combination$ - 01EA$ - 0
cJungle 4x4$ - 01EA$ - 0
dForest Bug Springer$ - 01EA$ - 0
eBee Springer$ - 01EA$ - 0
fVillage House$ - 01EA$ - 0
gKids Table$ - 01EA$ - 0
hPlayground EWF w/ Drainage System$ - 03,520SF$ - 0price to include surfacing post installation test (G-Max and H.I.C testing)
iPlayground Sand$ - 0120SF$ - 0
jPlayground 8" w Concrete Border$ - 0360LF$ - 0
kPlayground Sign, Age 2-5 Years$ - 01EA$ - 0
lPlayground Sign, Age 2-12 Years$ - 01EA$ - 0
mMusic Play Panel 2$ - 01EA$ - 0
nPlay Panel 3 - Learning$ - 01EA$ - 0
oGas Station w/ 2 Pumps, Play$ - 01EA$ - 0
pGas Pump 1, Play$ - 01EA$ - 0
5PLAY SIGNS AND PAVEMENT MARKINGS$ - 0
aSpeed Limit 5 Sign$ - 03EA$ - 0
bStop Sign$ - 08EA$ - 0
cYield Sign$ - 03LF$ - 0
dTraffic Light$ - 02EA$ - 0
e4" w Centerline Pavement Markings$ - 0700LF$ - 0
f4" w Dashed Pavement Markings$ - 0142LF$ - 0
g1' w Crosswalk Markings$ - 064LF$ - 0
hFlower Chalkboard$ - 04EA$ - 0
6SITE AMENITIES$ - 0
a6' Bench$ - 04EA$ - 0
b6' Picnic Table$ - 02EA$ - 0
cSmall BBQ Grill$ - 01EA$ - 0
dAnti-Tipping Ring, Trash Receptacle$ - 05EA$ - 0
7LANDSCAPE$ - 0
a2.5" Caliper Deciduous Tree$ - 012EA$ - 0
b2.5" Caliper Ornamental Tree$ - 02EA$ - 0
c10'-12' Confierous Tree$ - 06EA$ - 0
dStepping Boulder, Size 15"-18"$ - 020EA$ - 0
8PARK PERIMETER$ - 0include permit fee
a4' Wood Fence w/ 24" wide Concrete Maintenace Strip and Concrete Park Entrance (1,350 SF)$ - 0480LF$ - 0
bBoulders, Size 3'-4' All Sides$ - 010EA$ - 0
c4' Park Sign$ - 01EA$ - 0
dRelocate Ex. 4' Park Sign$ - 01EA$ - 0
SOFT COSTS
9Site Restoration$ - 0$ - 0
10Mobilization$ - 0$ - 0
11Layout & Field Survey$ - 0$ - 0
12Bonds & Insurance$ - 0$ - 0
13General Conditions$ - 0$ - 0Fixed duration cost. To include staffing
14Miscellaneous & Close-Out Work$ - 0$ - 0
ALLOWANCESAll fees/Bonds/Insurance to be calcualted for Allowances below under soft costs
16Additional Services$ 35,000.00$ 35,000.00Fixed Fee
TOTAL BASE BID$ 35,000.00
BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE)
L11. Alternate 1 -
L22. Alternate 2 -
L3
L4

BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED

UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID
DescriptionValueValueUnit
4' CHAIN LINK FENCE W/ 24" W CONCRETE MAINTENACE STRIP$ - 0$ - 0PER DETAIL - 100 LF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS -
PLAYGROUND GRASS (ARTIFICAL TURF), SURFACING$ - 0$ - 0PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS -
TOPSOIL$ - 0$ - 050 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
TOPSOIL SEED/MULCH$ - 0$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
NATURAL SOD$ - 0$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
Construction Manager's Project Personnel*Hourly Rate**Hourly Rate**Provide Fully Burdened Labor Rates*
Project Manager$0.00$0.00
Project Superintendent$0.00$0.00
Project Engineer$0.00$0.00
Project Estimator$0.00$0.00
Accounting$0.00$0.00
Clerical$0.00$0.00
Journeyman for General Contractor$0.00$0.00
Laborer$0.00$0.00
Others:$0.00$0.00

File details come from the government source that posted it. Updated .