This is a bid form for the Hasse-Emery Park Improvements project (RFP-546916) issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department. The project encompasses comprehensive park improvements including tree removal and pruning (ranging from 5 inches to 36 inches in diameter across 29 total trees), demolition of existing site infrastructure, installation of concrete and asphalt connectivity pathways (8,900 combined square feet), playground equipment installation (including specialized equipment such as Wizard's Hideaway ADA, swing combinations, springers, and village house structures), site amenities (benches, picnic tables, grills, trash receptacles), landscape enhancements (trees and stepping boulders), and perimeter fencing (480 linear feet of 4-foot wood fence with concrete maintenance strips and park entrance). The project scope also includes play signs, pavement markings, and associated soft costs such as mobilization, bonds, insurance, and general conditions. The contract term is two years.
The bid form establishes a base bid structure with all line items currently showing zero dollar amounts to be completed by the contractor. The form includes a fixed allowance of $35,000 for Additional Services and requires contractors to provide unit rates for future work within the contract period, including chain link fencing, artificial turf surfacing, topsoil, seed/mulch, and natural sod installations. Bidders must also provide fully burdened hourly labor rates for construction management personnel including project managers, superintendents, engineers, estimators, and general contractor journeymen. The bid form includes alternates sections and explicitly states that all fees, bonds, insurance, and general contractor costs must be calculated and included in the pricing submissions. Failure to include required unit prices may result in bid disqualification.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| HASSE-EMERY PARK IMPROVEMENTS - Bid Form | ||||||
| DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL | ||||||
| BIDDING CONTRACTOR: | ||||||
| BASE | COST | QTY | UNIT | BID COST | All Fees/Bonds/Insurance/GC's listed under Soft Costs | |
| 1 | SOIL EROSION AND SEDIMENTATION CONTROL MEASURES | $ - 0 | ||||
| a | SESC Measures | $ - 0 | 1 | LSUM | $ - 0 | |
| b | Temporary Construction Sign | $ - 0 | 1 | EA | $ - 0 | |
| 2 | DEMOLITION AND INSPECTION | $ - 0 | ||||
| a | Tree/Shrub/Vegetation Removal, 5" or less | $ - 0 | 19 | EA | $ - 0 | |
| b | Tree Removal, 6"-18" | $ - 0 | 3 | EA | $ - 0 | |
| c | Tree Removal, 19"-36" | $ - 0 | 2 | EA | $ - 0 | |
| d | Tree Pruning | $ - 0 | 5 | EA | $ - 0 | |
| e | Concrete Removal | $ - 0 | 70 | SF | $ - 0 | |
| f | 6' Fence Posts and Rail Removal | $ - 0 | 1 | LSUM | $ - 0 | |
| g | Site Amenities Removal | $ - 0 | 1 | LSUM | $ - 0 | |
| i | Catch Basin Clean-up and Inspection | $ - 0 | 1 | LSUM | $ - 0 | |
| 3 | PARK CONNECTIVITY | $ - 0 | include permit fee | |||
| a | 4" Concrete | $ - 0 | 2,900 | SF | $ - 0 | |
| b | Asphalt Path | $ - 0 | 6,000 | SF | $ - 0 | |
| 4 | PLAYGROUND | $ - 0 | ||||
| a | Wizard's Hideaway ADA | $ - 0 | 1 | EA | $ - 0 | |
| b | Double Swing Combination | $ - 0 | 1 | EA | $ - 0 | |
| c | Jungle 4x4 | $ - 0 | 1 | EA | $ - 0 | |
| d | Forest Bug Springer | $ - 0 | 1 | EA | $ - 0 | |
| e | Bee Springer | $ - 0 | 1 | EA | $ - 0 | |
| f | Village House | $ - 0 | 1 | EA | $ - 0 | |
| g | Kids Table | $ - 0 | 1 | EA | $ - 0 | |
| h | Playground EWF w/ Drainage System | $ - 0 | 3,520 | SF | $ - 0 | price to include surfacing post installation test (G-Max and H.I.C testing) |
| i | Playground Sand | $ - 0 | 120 | SF | $ - 0 | |
| j | Playground 8" w Concrete Border | $ - 0 | 360 | LF | $ - 0 | |
| k | Playground Sign, Age 2-5 Years | $ - 0 | 1 | EA | $ - 0 | |
| l | Playground Sign, Age 2-12 Years | $ - 0 | 1 | EA | $ - 0 | |
| m | Music Play Panel 2 | $ - 0 | 1 | EA | $ - 0 | |
| n | Play Panel 3 - Learning | $ - 0 | 1 | EA | $ - 0 | |
| o | Gas Station w/ 2 Pumps, Play | $ - 0 | 1 | EA | $ - 0 | |
| p | Gas Pump 1, Play | $ - 0 | 1 | EA | $ - 0 | |
| 5 | PLAY SIGNS AND PAVEMENT MARKINGS | $ - 0 | ||||
| a | Speed Limit 5 Sign | $ - 0 | 3 | EA | $ - 0 | |
| b | Stop Sign | $ - 0 | 8 | EA | $ - 0 | |
| c | Yield Sign | $ - 0 | 3 | LF | $ - 0 | |
| d | Traffic Light | $ - 0 | 2 | EA | $ - 0 | |
| e | 4" w Centerline Pavement Markings | $ - 0 | 700 | LF | $ - 0 | |
| f | 4" w Dashed Pavement Markings | $ - 0 | 142 | LF | $ - 0 | |
| g | 1' w Crosswalk Markings | $ - 0 | 64 | LF | $ - 0 | |
| h | Flower Chalkboard | $ - 0 | 4 | EA | $ - 0 | |
| 6 | SITE AMENITIES | $ - 0 | ||||
| a | 6' Bench | $ - 0 | 4 | EA | $ - 0 | |
| b | 6' Picnic Table | $ - 0 | 2 | EA | $ - 0 | |
| c | Small BBQ Grill | $ - 0 | 1 | EA | $ - 0 | |
| d | Anti-Tipping Ring, Trash Receptacle | $ - 0 | 5 | EA | $ - 0 | |
| 7 | LANDSCAPE | $ - 0 | ||||
| a | 2.5" Caliper Deciduous Tree | $ - 0 | 12 | EA | $ - 0 | |
| b | 2.5" Caliper Ornamental Tree | $ - 0 | 2 | EA | $ - 0 | |
| c | 10'-12' Confierous Tree | $ - 0 | 6 | EA | $ - 0 | |
| d | Stepping Boulder, Size 15"-18" | $ - 0 | 20 | EA | $ - 0 | |
| 8 | PARK PERIMETER | $ - 0 | include permit fee | |||
| a | 4' Wood Fence w/ 24" wide Concrete Maintenace Strip and Concrete Park Entrance (1,350 SF) | $ - 0 | 480 | LF | $ - 0 | |
| b | Boulders, Size 3'-4' All Sides | $ - 0 | 10 | EA | $ - 0 | |
| c | 4' Park Sign | $ - 0 | 1 | EA | $ - 0 | |
| d | Relocate Ex. 4' Park Sign | $ - 0 | 1 | EA | $ - 0 | |
| SOFT COSTS | ||||||
| 9 | Site Restoration | $ - 0 | $ - 0 | |||
| 10 | Mobilization | $ - 0 | $ - 0 | |||
| 11 | Layout & Field Survey | $ - 0 | $ - 0 | |||
| 12 | Bonds & Insurance | $ - 0 | $ - 0 | |||
| 13 | General Conditions | $ - 0 | $ - 0 | Fixed duration cost. To include staffing | ||
| 14 | Miscellaneous & Close-Out Work | $ - 0 | $ - 0 | |||
| ALLOWANCES | All fees/Bonds/Insurance to be calcualted for Allowances below under soft costs | |||||
| 16 | Additional Services | $ 35,000.00 | $ 35,000.00 | Fixed Fee | ||
| TOTAL BASE BID | $ 35,000.00 |
| BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE) | |
| L1 | 1. Alternate 1 - |
| L2 | 2. Alternate 2 - |
| L3 | |
| L4 |
BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED
| UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID | ||||
| Description | Value | Value | Unit | |
| 4' CHAIN LINK FENCE W/ 24" W CONCRETE MAINTENACE STRIP | $ - 0 | $ - 0 | PER DETAIL - 100 LF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS - | |
| PLAYGROUND GRASS (ARTIFICAL TURF), SURFACING | $ - 0 | $ - 0 | PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS - | |
| TOPSOIL | $ - 0 | $ - 0 | 50 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| TOPSOIL SEED/MULCH | $ - 0 | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| NATURAL SOD | $ - 0 | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS |
| Construction Manager's Project Personnel | *Hourly Rate* | *Hourly Rate* | *Provide Fully Burdened Labor Rates* | |
| Project Manager | $0.00 | $0.00 | ||
| Project Superintendent | $0.00 | $0.00 | ||
| Project Engineer | $0.00 | $0.00 | ||
| Project Estimator | $0.00 | $0.00 | ||
| Accounting | $0.00 | $0.00 | ||
| Clerical | $0.00 | $0.00 | ||
| Journeyman for General Contractor | $0.00 | $0.00 | ||
| Laborer | $0.00 | $0.00 | ||
| Others: | $0.00 | $0.00 |