This is a Scope of Work document for PAPMC (Philadelphia Housing Authority Management Company) in Pennsylvania, soliciting proposals from qualified contractors to provide roofing repair, replacement, and related maintenance work on an as-needed basis under contract P-005534. The scope encompasses comprehensive roofing services including removal of existing roofs, installation of various roofing materials (asphalt shingles, EPDM single-ply membrane, heat-weld TPO, and SBS-modified bituminous membrane), wood sheathing replacement, siding repairs, fascia board and soffit replacement, gutter and downspout installation, window replacement, and chimney work. Proposers must conduct site inspections to assess roofing conditions, quantities, types, sizes, locations, and local site conditions affecting work performance. Services will be issued through task orders on an as-needed basis, with work to be performed on occupied buildings requiring coordination of safe temporary resident access throughout construction. The contract term spans five years (Years 1-5) with separate pricing schedules for each year.
Pricing for the various line items is to be provided on a unit basis (per square foot, linear foot, or per unit), with differentiated pricing for projects under 500 square feet versus those exceeding 500 square feet for wood sheathing and roof removal/installation work. A difficult condition adjustment is available for roofs not readily accessible, determined on a job-by-job basis prior to purchase order assignment. The contractor must provide labor rates for two-worker and three-worker crews and material costs for all roofing systems, insulation types, and accessories. All materials and installation are warranted for five years or the manufacturer's standard warranty period, whichever is greater. The contractor assumes responsibility for obtaining all necessary building permits and approvals from utilities and the City of Philadelphia, and must provide weekly reports documenting work sites, dates, quantities replaced, and materials used. Safety requirements include OSHA compliance, hot asphalt kettle supervision, proper ladder standards, and grounds cleanup of PHA and neighboring properties.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAPMC ROOFING REPAIR, REPLACEMENT AND RELATED MAINTENANCE
WORK
P-005534 -SCOPE OF WORK
PAPMC is currently soliciting proposals from qualified contractors to provide roofing repair, replacement and related maintenance work on an as-needed basis.
Prior to submitting a proposal, the Proposer shall take steps reasonably .necessary to ascertain the nature of the work, and shall investigate and satisfy itself as to the general and local conditions which can affect the work or its cost, including, but not limited to: (1) site visits for inspection of roofing and all related items, i.e., quantity, type, size and location; (2) conditions bearing upon transportation, disposal, handling, and storage ·or materials; (3) the availability of labor, water, electric power, and roads; (4) uncertainties of physical conditions at the site; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Proposer shall also satisfy itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site. Any failure of the Proposer to take the actions described in this paragraph will not relieve the Proposer from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to PHA.
SCOPE OF SERVICES
Contractor is responsible for supplying labor and materials for roof repairs, roof replacements and related work. The services shall be utilized through the issuance of task orders on an as-needed basis for carrying out specific assignments including, but not limited to: roofing repairs, replacement and related work.
Services requested include, but are not limited to:
A. Remove Existing Roof
Price Per Square Foot
1. Remove and Replace Wood Sheathing - Price Per Square Foot
If wood sheathing below the roof is found to be rotted or structurally unstable the effected portion of the sheathing must be removed and replaced as directed by PHA representative.
2. Material: Standard 5/8" and/or ¾” plywood sheathing.
Supervise all construction activities
1. Remove all existing sheathing material and dispose of properly
2. Install plywood grain perpendicular to rafters
3. Make sure all seams of sheathing are staggered.
4. All sheathing panels should meet at the center of the truss or rafter.
5. Remove all construction debris from site.
6. Install and remove all safety and caution material
B. Install with Asphalt Shingles
Material: Standard 3-tab asphalt shingle. PHA shall approve sample color, type, manufacturer and texture. 3 copies of shop drawings shall be provided to PHA.
Shingles to have the following minimum requirements:
1. 25-year warranty
2. 60 mph wind warranty
3. Class A fire listing
4. Energy Star Qualified
5. If existing structure has a hip or ridge vent it must be replaced using matching shingles as part of this contract.
Supervise all construction activities
1. Remove all existing roofing material
2. Clean all nails and underlayment
3. Lay down asphalt paper underlayment
4. Install or replace flashing and joint sealants as necessary
5. Install ice and water shield a minimum of 24 inches past the 'structure's exterior wall line on sloped roofs greater an 4:12 and 48 inches past the structure's exterior wall line on sloped roofs less than 4:12. A roof with a slope less than 2:12 shall not be asphalt shingled.
6. Allow for expansion and contraction per manufacturers recommendations
7. Remove all construction debris from site
8. Install and remove all safety and caution material
C. Install with EPDM Single Ply Membrane
Material: Standard EPDM Rubber Roofing membrane. PHA shall approve sample color, type, manufacturer and texture. 3 copies of shop drawings shall be provided to PHA. Membrane to have the following minimum requirements:
Grade and Class: Grade 1and Class U, unreinforced.
1. Warranty: 20 Year.
2. Thickness: 60 mils, nominal.
3. Backing: Unbacked.
4. Exposed Face Color: Black.
2. Clean all nails and underlayment.
3. Install or replace flashing and joint sealants as necessary.
4. Remove and replace insulation in kind.
5. 5. Fill any gaps larger than 1/4” with wooden strips.
D. Install with Heat-Weld TPO
Material: Standard TPO Polymer base, polyester reinforced fabric center and thermoplastic polyolefin top ply. PHA shall approve sample color, type, manufacturer and texture. 3 copies of shop drawings shall be provided to
PHA.
1. Thickness: 60 mils, nominal.
2. Exposed Face Color: White.
2. Clean all nails and underlayment
3. Install or replace flashing and joint sealants as necessary·
5. 5. Fill any gaps larger than ¼” with wooden strips.
E. Install with SBS-Modified Bituminous Membrane Roof
Material: Two ply modified bituminous membrane roofing, base sheet, base ply felts, vapor retarder and surfacing material. PHA shall approve sample color, type, manufacturer and texture. Three (3) copies of shop drawings shall be provided to PHA. Shingles to have the following minimum requirements:
1. Warranty: 10 Year Manufacturers and Installers
2. Thickness: 180 mils.
3. Granular Color: White.
1. Remove all existing roofing material.
2. Clean all nails and underlayment
3. Install or replace flashing and joint sealants as necessary
5. Fill any gaps larger than ¼” width wooden strips.
F. Siding repairs and replacement Price per Square Foot
Supply and Install siding as per drawing and specification approved by PHA. Contractor should do the following as needed; striping to wooden studs, replace wooden framing, wooden sheeting and insulation.
1. Warranty: 10 Year Manufacturers and Installers
2. Match existing siding texture and color for repairs
3. Provide PHA samples of proposed siding and specifications.
4. Replace damaged siding underlayment if needed.
G. Fascia Board Replacement & Other Roof Elements
1. Remove existing fascia board covering and replace with in kind and color. Price per Square Foot
2. Remove existing soffit and replace with vinyl vented soffit in kind and color. Price per Square Foot
3. Downspout replacement 3”. Price per linear ft
4. Downspout replacement 4”. Price per linear ft
5. Gutter replacement- Price per linear ft
6. Roof traffic pad. Price per linear ft
7. Metal Copping (perimeter flat roof). Price per linear ft
8. Apply caulking at parapet wall coping joints. Price per linear ft.
Remove existing gutters and downspouts and replace in kind, size and color. Roof gutters and downspouts may be made of aluminum or galvanized steel. Aluminum gutters shall have a minimum nominal thickness of 0.027 inches. Aluminum downspouts shall have a minimum nominal thickness of 0.020 inches. Galvanized steel gutters and downspouts shall be at least 28 gage. Dissimilar metals shall not be in contact with each other.
Gutters shall be supported at a maximum spacing of 48 inches for galvanized steel or 32 inches for aluminum. Gutters supported by spikes and ferrules shall be installed only where the existing rafters and fascia boards are sound and free from rotten wood.
Unsound fascia boards shall be replaced. If unsound wood exists in existing rafters, gussets made from new lumber may be attached to the existing rafters for supporting new fascia boards and the gutters.
Gutters shall be attached by means of hangers if sufficient backing is not available for the use of spikes and ferrules. Downspouts shall be securely fastened at the top and bottom with intermediate supports that are a maximum of 10 feet apart. Gutters shall be installed with sufficient slope so they drain to the-downspouts.
Roof traffic pad shall be composed of re-processed rubber and selected bond agents.
Shall be compatible with roofing adhesives and shall be composed of the following thickness (3/8”x30”x4’, 1/2”x30”x4’ or 3/4”x33”x4’). Spacing roof traffic pad with 1” to 3” to permit the unrestricted flow of free water.
H. Window replacement
1. Remove existing window including sashes, casing and balances.
2. Secure framing if necessary
3. Install window flashing as needed
4. Install insulation between new window and frame as needed (foam or fiberglass).
5. Caulk and seal around window.
6. Reinstall interior trim around window. Try to match trim with the existing trim throughout the house.
7. The price of a window installation is split in two parts. Part one (Window installation) includes labor and all associated installation materials including but not limited to flashing, caulking, and trimming.
Part two include the cost of the actual window only.
8. Installation cost to include the labor for removal and window installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement. Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included.
9. New window cost will be charged separately from the installation cost.
A copy of the receipt will be added to the invoice.
10. New window will be double hung, double pane with a U factor of 0.3 or lower. Air sealing around new window to meet energy start and/or BPI guidelines. Include energy efficient low-E3 with argon.
11. PHA may require a different window color or a different window material to match existing windows or comply with the historical nature of a building. The window installation price will apply to such installation without a surcharge plus the actual cost of the window.
12. If vendor can prove additional cost due to the color of the capping or a special-order product associated with the window installation, PHA will accept the vendor to charge the difference only between the common product and the special-order product. An estimate from a material supplier has to be provided for the common product and the special order one to determine the difference.
I. Warranty
The contractor shall fully warrant all materials and installation furnished hereunder against defect in materials and/or workmanship for a period of five (5) years or the manufacturer's standard warranty period, whichever is the greatest from date of acceptance by PHA. Should any defect in materials or workmanship, except ordinary wear and tear, appear during the above stated warranty period, the contractor shall repair or replace same at no cost to the PHA, immediately upon written notice from
PHA.
J. Deliverables / Reports
Provide PHA Management with a weekly report showing the following at a minimum:
1. Site(s) that work was performed along with the time(s) and date(s).
2. Quantity of roofing replaced.
3. List of material used to specify manufacturer, color etc.
K. Additional Requirements
1. Whereas each of the buildings will remain fully occupied during construction, the Contractor will also be responsible for coordinating and maintaining safe temporary access for the residents throughout the construction process.
2. All work may be inspected and approved by a PHA representative prior to acceptance.
3. All existing roofing material will be removed; including wall flashings, vents, lead collars and eaves boxes. (New strip required unless otherwise approved by inspector).
4. Necessary wood deck replacement will be determined and approved by inspector on site of work in progress (wood gauge will need to be consistent _with existing).
5. Replacement of eaves box, downspout, barge wood and fascia metal will be determined in roof survey ahead of installation and will be··completed during roof installation (items missed in survey will be allowed to be added on approval of inspector)
6. PHA will not allow existing roof debris to be thrown to mobile waste container parked in middle of street. (Necessary accommodation of having parked cars moved or using stationary dumpster at curbside will be required of Contractor).
7. All roofing material and insulation shall be fire retardant.
8. PHA will allow Contractor only two roofing crews to work on roofing project on any given day.
9. Contractor will commit to informing PHA twenty-four hours in advance with specific addresses of units to be worked on (allowances will be made for unforeseen issues).
10. Provide specifications for SBS, EPDM, TPO and Asphalt Shingle Roofing, substrate, roofing insulation, cover board and roof accessories related to roofing system.
11. Provide shop drawings.
L. Safety and Quality Control
1. Hot and lit asphalt kettle will be manned at all times with cone and safety tape perimeter.
2. All ladders will meet OSHA safety standards for height and placement.
3. Installation of new roofing will comply with product manufacturers' specifications and recognized standard roofing procedures. (i.e. wall flashings, target collar patches and new metal priming, etc.).
4. All work on a unit in progress will be completed before moving on to the next unit. (Installation of downspout, fascia metal etc. unless otherwise approved by PHA).
5. 5. Contractor will be responsible for all grounds cleanup of PHA and neighboring properties as well as neighboring roofs affected by roof installation.
M. Special Conditions
1. The contractor shall obtain all necessary building permits or assist PHA, A/E, and/or subcontractors as required. The contractor shall obtain all approvals including, but not limited to, approvals required by utilities, the City of Philadelphia and other necessary parties
2. The pricing shall be broken out for less than 500 SF and more than 500 SF for wood sheathing removal and replacement as well as for removal of existing roof and installation of new roof. PHA and contractor agree that a lesser unit cost will be attached to the greater volume on said items.
3. All roofs that are not readily accessible will receive a difficult condition adjustment as shown on proposal form. Readily accessible roofs are all roofs with direct access that must require utilizing at maximum a 48' ladder to the roof being worked on. The standard for a readily accessible roof will be that by which an OSHA approved ladder can be safely set up in compliance With OSHA regulations for workers to climb and access the roof. If other roofs must be climbed to gain access to main roof, then the difficult adjustment amount will be utilized. The utilization or not of the difficulty adjustment will be determined by contractor and PHA representative upon review of the scope of work and prior to the assignment of a purchase order on a job-by-job basis.
Also, on a property that has several roofs, the determination of utilizing the difficulty adjustment will be assessed individually with regard to access to each roof on its' own. For example: work on a porch roof at front of a unit will not justify difficulty. On a unit that has a three-story main roof with direct access along with a rear secondary roof in which an additional ladder is needed to access that roof, the difficulty adjustment will apply only to the costs of the work at the secondary roof and not at the main roof. If contractor chooses to deviate from the difficultly adjustment standard set by PHA for reasons other than legitimate and communicated safety concerns, the difficulty adjustment will not be justified.
Bid Form:
Year 1
Item/Task Unit
<500 SF
Price $
>500
SF
Price $
Difficult Condition Adjustment
Install 1/2" plywood sheathing (re-deck over existing wood) SF Remove and Replace Wood sheathing - 5/8" SF Remove and Replace Wood sheathing - 3/4" SF Remove existing Roof - up to two existing roofs SF Remove existing Roof - up to two existing roofs ( no more than 4 layers)
SF
Install with Asphalt Shingles SF Install with EPDM Single Ply Membrane SF Install with Held Weld TPO SF Install with SBS-Modified Bituminous Membrane Roof SF
Item/Task Unit Quantity Price $ Labor rate @ two worker crew P/hr. 1 Labor rate @ three worker crew P/hr. 1 Install Vinyl siding at Exterior Wall Complete (ferring strip, insultation etc.)
SF 1
Repair and Silver Coat Existing Roof (roof cement and asphalt fabric repair)
SF 1
Fascia Board Replacement SF 1 Install 2"x4" Lumber for nailer or blocking LF 1 Install 2"x6" Lumber for nailer, blocking, or sister joist LF 1 Remove and replace existing 2"x6" roof joist LF 1 Install 2"x8" Lumber for nailer LF 1 Remove and replace existing 2"x8" roof joist LF 1 Install 2"x10" Lumber for nailer LF 1 Install 2"x12" Lumber for nailer LF 1 Install 1"x10" Lumber for nailer LF 1 Install 1/2" insulation (recovery board) SF 1 Install 2" polyiso insulation board SF 1 Install Plumb Stack Collar 2" Per Unit 1 Install Plumb Stack Collar 3" Per Unit 1 Install Plumb Stack Collar 4" Per Unit 1 Remove existing eaves box and replace with 4" Copper Drop Down Scupper Eaves Box
Per Unit 1
Install 4" Copper Drop Down Scupper Eaves Box Per Unit 1
Drill, tap, remove, and install new bolts and ring at internal drain Per Unit 1
Remove Install Vinyl Soffit SF 1 Install Barge Board Metal Cover SF 1 Install Termination Bar with Lead Plug Anchor LF 1 Install Counter Flashing ("Philly" flashing) LF 1 Apply Stucco at Chimney & Exterior wall without wire lathe SF 1 Apply Stucco at Chimney & Exterior wall with wire lathe SF 1 Gutter replacement (5" K") LF 1 Downspout 3" Replacement (alum.) LF 1 Downspout 4" Replacement (alum.) LF 1 Install Galvanized Skylight (2'6x3'0") Per Unit 1
Roof Vent Install (bathroom/dryer exhaust for flat roof) (no electrical connection)
Per Unit 1
Roof Vent Install (attic vent) (no electrical connection) Per Unit 1 Remove vinyl siding SF 1 Install vinyl siding SF 1 Remove and replace vinyl siding. Include corners and drip edge SF 1 Remove Chimney – Remove unused chimney entirely from above roof to below roof deck. Fill all voids with solid masonry and mortar.
Per Unit 1
Close Off Chimney – Seal off chimney with precast concrete cap cemented to existing chimney. Approx. 2 ft x 2 ft
Reset Bricks – Remove loose brick/stone section of masonry wall or chimney. Reset same with mortar. To be in line with existing wall include lintel, sills and wall ties if needed.
SF 1
Repair Terracotta Chimney Liner LF 1 Install Metal Chimney Cap Per Unit 1 Close Window/Door opening with Plywood – Remove existing door/window completely. Remove all wood from opening. Chip away all loose masonry material. Close opening with new masonry to match existing interior and exterior
Existing Window Capping EA 1 Window Installation. Window Installation cost to include the labor for removal and installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement.
Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included. Actual window price to be charged separately and included on the invoice.
EA 1
Install Metal Copping at perimeter (flat roof) LF 1
Install roof walkway pads LF 1 Apply caulking at wall coping joints LF 1 Insulation -R13 SF 1 Insulation -R19 SF 1 Insulation -R30 SF 1
Year 2
<500 SF
Price $
>500
SF
Price $
Difficult Condition Adjustment
Install 1/2" plywood sheathing (re-deck over existing wood) SF Remove and Replace Wood sheathing - 5/8" SF Remove and Replace Wood sheathing - 3/4" SF Remove existing Roof - up to two existing roofs SF Remove existing Roof - up to two existing roofs (no more than 4 layers)
SF
Install with Asphalt Shingles SF Install with EPDM Single Ply Membrane SF Install with Held Weld TPO SF Install with SBS-Modified Bituminous Membrane Roof SF
Item/Task Unit Quantity Price $ Labor rate @ two worker crew P/hr. 1 Labor rate @ three worker crew P/hr. 1 Install Vinyl siding at Exterior Wall Complete (ferring strip, insultation etc.)
Repair and Silver Coat Existing Roof (roof cement and asphalt fabric repair)
SF 1
Fascia Board Replacement SF 1 Install 2"x4" Lumber for nailer or blocking LF 1 Install 2"x6" Lumber for nailer, blocking, or sister joist LF 1 Remove and replace existing 2"x6" roof joist LF 1 Install 2"x8" Lumber for nailer LF 1 Remove and replace existing 2"x8" roof joist LF 1 Install 2"x10" Lumber for nailer LF 1 Install 2"x12" Lumber for nailer LF 1 Install 1"x10" Lumber for nailer LF 1 Install 1/2" insulation (recovery board) SF 1 Install 2" polyiso insulation board SF 1 Install Plumb Stack Collar 2" Per Unit 1 Install Plumb Stack Collar 3" Per Unit 1 Install Plumb Stack Collar 4" Per Unit 1 Remove existing eaves box and replace with 4" Copper Drop Down Scupper Eaves Box
Per Unit 1
Install 4" Copper Drop Down Scupper Eaves Box Per Unit 1
Drill, tap, remove, and install new bolts and ring at internal drain Per Unit 1
Remove Install Vinyl Soffit SF 1 Install Barge Board Metal Cover SF 1 Install Termination Bar with Lead Plug Anchor LF 1 Install Counter Flashing ("Philly" flashing) LF 1 Apply Stucco at Chimney & Exterior wall without wire lathe SF 1 Apply Stucco at Chimney & Exterior wall with wire lathe SF 1 Gutter replacement (5" K") LF 1 Downspout 3" Replacement (alum.) LF 1 Downspout 4" Replacement (alum.) LF 1 Install Galvanized Skylight (2'6x3'0") Per Unit 1 Roof Vent Install (bathroom/dryer exhaust for flat roof) (no electrical connection)
Per Unit 1
Roof Vent Install (attic vent) (no electrical connection) Per Unit 1 Remove vinyl siding SF 1 Install vinyl siding SF 1 Remove and replace vinyl siding . Include corners and drip edge SF 1 Remove Chimney – Remove unused chimney entirely from above roof to below roof deck. Fill all voids with solid masonry and
Close Window/Door opening with Plywood – Remove existing door/window completely. Remove all wood from opening. Chip away all loose masonry material. Close opening with new labor for removal and installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement.
Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included. Actual window price
Apply caulking at wall coping joints LF 1 Insulation -R13 SF 1
Year 3
<500 SF
Price $
>500
SF
Price $
Difficult Condition Adjustment
Install 1/2" plywood sheathing (re-deck over existing wood) SF Remove and Replace Wood sheathing - 5/8" SF Remove and Replace Wood sheathing - 3/4" SF Remove existing Roof - up to two existing roofs SF Remove existing Roof - up to two existing roofs (no more than 4 layers) SF
Install with Asphalt Shingles SF Install with EPDM Single Ply Membrane SF Install with Held Weld TPO SF Install with SBS-Modified Bituminous Membrane Roof SF
Item/Task Unit Quantity Price $ Labor rate @ two worker crew P/hr. 1 Labor rate @ three worker crew P/hr. 1 Install Vinyl siding at Exterior Wall Complete (ferring strip, insultation etc.) SF 1
Repair and Silver Coat Existing Roof (roof cement and asphalt fabric repair)
SF 1
Fascia Board Replacement SF 1 Install 2"x4" Lumber for nailer or blocking LF 1 Install 2"x6" Lumber for nailer, blocking, or sister joist LF 1 Remove and replace existing 2"x6" roof joist LF 1 Install 2"x8" Lumber for nailer LF 1 Remove and replace existing 2"x8" roof joist LF 1 Install 2"x10" Lumber for nailer LF 1 Install 2"x12" Lumber for nailer LF 1 Install 1"x10" Lumber for nailer LF 1 Install 1/2" insulation (recovery board) SF 1 Install 2" polyiso insulation board SF 1 Install Plumb Stack Collar 2" Per Unit 1 Install Plumb Stack Collar 3" Per Unit 1 Install Plumb Stack Collar 4" Per Unit 1 Remove existing eaves box and replace with 4" Copper Drop Down Scupper Eaves Box
Install 4" Copper Drop Down Scupper Eaves Box Per Unit 1
Drill, tap, remove, and install new bolts and ring at internal drain Per Unit 1
Remove Install Vinyl Soffit SF 1 Install Barge Board Metal Cover SF 1 Install Termination Bar with Lead Plug Anchor LF 1 Install Counter Flashing ("Philly" flashing) LF 1 Apply Stucco at Chimney & Exterior wall without wire lathe SF 1 Apply Stucco at Chimney & Exterior wall with wire lathe SF 1 Gutter replacement (5" K") LF 1 Downspout 3" Replacement (alum.) LF 1 Downspout 4" Replacement (alum.) LF 1 Install Galvanized Skylight (2'6x3'0") Per Unit 1 Roof Vent Install (bathroom/dryer exhaust for flat roof) (no electrical connection) Per Unit 1
Roof Vent Install (attic vent) (no electrical connection) Per Unit 1 Remove vinyl siding SF 1 Install vinyl siding SF 1 Remove and replace vinyl siding. Include corners and drip edge SF 1 Remove Chimney – Remove unused chimney entirely from above roof to below roof deck. Fill all voids with solid masonry and
Close Window/Door opening with Plywood – Remove existing door/window completely. Remove all wood from opening. Chip away all loose masonry material. Close opening with new labor for removal and installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement.
Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included. Actual window price
Apply caulking at wall coping joints LF 1 Insulation -R13 SF 1
Year 4
Item/Task Unit <500 SF Price $
>500
SF
Price $
Difficult Condition Adjustment
Install 1/2" plywood sheathing (re-deck over existing wood) SF Remove and Replace Wood sheathing - 5/8" SF Remove and Replace Wood sheathing - 3/4" SF Remove existing Roof - up to two existing roofs SF Remove existing Roof - up to two existing roofs ( no more than 4 layers)
SF
Install with Asphalt Shingles SF Install with EPDM Single Ply Membrane SF Install with Held Weld TPO SF Install with SBS-Modified Bituminous Membrane Roof SF
Item/Task Unit Quantity Price $ Labor rate @ two worker crew P/hr. 1 Labor rate @ three worker crew P/hr. 1 Install Vinyl siding at Exterior Wall Complete (ferring strip, insultation etc.)
SF 1
Repair and Silver Coat Existing Roof (roof cement and asphalt fabric repair) SF 1
Fascia Board Replacement SF 1 Install 2"x4" Lumber for nailer or blocking LF 1 Install 2"x6" Lumber for nailer, blocking, or sister joist LF 1 Remove and replace existing 2"x6" roof joist LF 1 Install 2"x8" Lumber for nailer LF 1 Remove and replace existing 2"x8" roof joist LF 1 Install 2"x10" Lumber for nailer LF 1 Install 2"x12" Lumber for nailer LF 1 Install 1"x10" Lumber for nailer LF 1 Install 1/2" insulation (recovery board) SF 1 Install 2" polyiso insulation board SF 1 Install Plumb Stack Collar 2" Per Unit 1 Install Plumb Stack Collar 3" Per Unit 1 Install Plumb Stack Collar 4" Per Unit 1 Remove existing eaves box and replace with 4" Copper Drop Down Scupper Eaves Box
Per Unit 1
Install 4" Copper Drop Down Scupper Eaves Box Per Unit 1
Drill, tap, remove, and install new bolts and ring at internal drain Per Unit 1
Remove Install Vinyl Soffit SF 1 Install Barge Board Metal Cover SF 1 Install Termination Bar with Lead Plug Anchor LF 1 Install Counter Flashing ("Philly" flashing) LF 1 Apply Stucco at Chimney & Exterior wall without wire lathe SF 1 Apply Stucco at Chimney & Exterior wall with wire lathe SF 1 Gutter replacement (5" K") LF 1 Downspout 3" Replacement (alum.) LF 1 Downspout 4" Replacement (alum.) LF 1 Install Galvanized Skylight (2'6x3'0") Per Unit 1 Roof Vent Install (bathroom/dryer exhaust for flat roof) (no electrical connection)
Per Unit 1
Roof Vent Install (attic vent) (no electrical connection) Per Unit 1 Remove vinyl siding SF 1
Install vinyl siding SF 1 Remove and replace vinyl siding. Include corners and drip edge SF 1 Remove Chimney – Remove unused chimney entirely from above roof to below roof deck. Fill all voids with solid masonry and cemented to existing chimney. Approx. 2 ft x 2 ft Per Unit 1
Close Window/Door opening with Plywood – Remove existing door/window completely. Remove all wood from opening. Chip away all loose masonry material. Close opening with new labor for removal and installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement.
Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included. Actual window price
Apply caulking at wall coping joints LF 1 Insulation -R13 SF 1
Year 5
<500 SF
Price $
>500
SF
Price $
Difficult Condition Adjustment
Install 1/2" plywood sheathing (re-deck over existing wood) SF Remove and Replace Wood sheathing - 5/8" SF Remove and Replace Wood sheathing - 3/4" SF Remove existing Roof - up to two existing roofs SF Remove existing Roof - up to two existing roofs (no more than 4 layers)
SF
Install with Asphalt Shingles SF Install with EPDM Single Ply Membrane SF Install with Held Weld TPO SF Install with SBS-Modified Bituminous Membrane Roof SF
Item/Task Unit Quantity Price $ Labor rate @ two worker crew P/hr. 1 Labor rate @ three worker crew P/hr. 1 Install Vinyl siding at Exterior Wall Complete (ferring strip, insultation etc.)
SF 1
Repair and Silver Coat Existing Roof (roof cement and asphalt fabric repair)
Fascia Board Replacement SF 1
Install 2"x4" Lumber for nailer or blocking LF 1 Install 2"x6" Lumber for nailer, blocking, or sister joist LF 1 Remove and replace existing 2"x6" roof joist LF 1 Install 2"x8" Lumber for nailer LF 1 Remove and replace existing 2"x8" roof joist LF 1 Install 2"x10" Lumber for nailer LF 1 Install 2"x12" Lumber for nailer LF 1 Install 1"x10" Lumber for nailer LF 1 Install 1/2" insulation (recovery board) SF 1 Install 2" polyiso insulation board SF 1 Install Plumb Stack Collar 2" Per Unit 1 Install Plumb Stack Collar 3" Per Unit 1 Install Plumb Stack Collar 4" Per Unit 1 Remove existing eaves box and replace with 4" Copper Drop Down Scupper Eaves Box
Per Unit 1
Install 4" Copper Drop Down Scupper Eaves Box Per Unit 1
Drill, tap, remove, and install new bolts and ring at internal drain Per Unit 1
Remove Install Vinyl Soffit SF 1 Install Barge Board Metal Cover SF 1 Install Termination Bar with Lead Plug Anchor LF 1 Install Counter Flashing ("Philly" flashing) LF 1 Apply Stucco at Chimney & Exterior wall without wire lathe SF 1 Apply Stucco at Chimney & Exterior wall with wire lathe SF 1 Gutter replacement (5" K") LF 1 Downspout 3" Replacement (alum.) LF 1 Downspout 4" Replacement (alum.) LF 1 Install Galvanized Skylight (2'6x3'0") Per Unit 1 Roof Vent Install (bathroom/dryer exhaust for flat roof) (no electrical connection)
Per Unit 1
Roof Vent Install (attic vent) (no electrical connection) Per Unit 1 Remove vinyl siding SF 1 Install vinyl siding SF 1 Remove and replace vinyl siding. Include corners and drip edge SF 1 Remove Chimney – Remove unused chimney entirely from above roof to below roof deck. Fill all voids with solid masonry and
Close Window/Door opening with Plywood – Remove existing door/window completely. Remove all wood from opening. Chip away all loose masonry material. Close opening with new labor for removal and installation, and the associated materials for properly insulating, flashing, caulking, trimming and related materials necessary on a standard window replacement.
Installation cost includes removal of existing window and installation of a new Vinyl Double Hung Window up to 30" wide by 56" high (1680 square inches). Add $25 for each 100 square inch over the 1680 square inches included. Actual window price
Apply caulking at wall coping joints LF 1 Insulation -R13 SF 1